Harris Plant - Heater Drain System Transients INPO ICES #305654 HNP Root Cause Evaluation 592995.

Slides:



Advertisements
Similar presentations
EICC Working Hours Taskforce KPI Scorecard
Advertisements

Defining Investigation Extent of Condition/Cause Scope a New Approach
ENGINEERS WITHOUT BORDERS-USA PROGRAM QUALITY-RATINGS.
B2B Advertising.
Twelve Cs for Team Building
1 PER-005 Update Impact on Operators System Operator Conference April and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services.
INPO Update CMBG Meeting June 2013
Root Cause Analysis for Effective Incident Investigation Christy Wolter, CIH Principal Consultant Environmental and Occupational Risk Management (EORM.
Accident Investigation Root Cause Analysis
Presenters: Steve Gigliotti Laura McMullen Marcus Smith.
Software Project Management Lecture # 11. Outline Quality Management ( chapter 26 - Pressman )  Software reviews  Formal Inspections & Technical Reviews.
1 Oil oxidation impact on Feed pump and turbine performance Presenter: Walter Bischoff.
January 24, SA12-PE-04 Purpose and Scope The purpose of this self assessment is to conduct a multi-discipline team review (deep dive) of the Feedwater.
Overview Lesson 10,11 - Software Quality Assurance
Jesper Kjeldskov & Jan Stage Department of Computer Science Aalborg University Denmark New Techniques for Usability Evaluation of Mobile Systems.
Slide 1 FAA’s Special Technical Audit of Boeing and the Audit Resolution Plan.
PRESENTED BY ABC TEXAS GULF COAST CHAPTER
External Defibrillator Design Deficiencies And Their Impact On Users and Caregivers Al Taylor Director, Division of Electrical and Software Engineering.
Supplier Overview of Johnson & Johnson MD&D Supplier Quality Standard Operating Procedures (SOPs) Supplier Responsibilities for Failure Investigations.
Project Execution.
ISO Standard is based on the management model of plan – do - check – act. Today we all be discussing the elements of the standard that deal with.
Don Cole Risk Assessment and Mitigation Project Management for ARA Engineers and Scientists.
“How Industry Learns” --- Proposed Project --- Karen Paulk, ConocoPhillips, Chair, Process Safety Group & Ron Chittim, API CRE Chairs & Sponsors Workshop.
Oconee RPS/ESPS Digital Upgrade Presented by: Michael Bailey June 3,
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 27 Slide 1 Quality Management 1.
Implementing an Energy Management System Brendan Thorne Aughinish Alumina Limited.
Cook Nuclear Power Plant
© 2007 Pearson Education Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 12 Statistically-Based Quality Improvement for Variables.
1st Qtr Results and Outlook/ / Confidential KGM / 1 Improving Feedwater Regulation Performance Using a System Based Approach FW Systems User’s.
Eric Backus FW System Engineer Exelon - LaSalle Station FSRUG Executive Board Member.
WAO, Trieste, 24th - 28th September 2007 An Overview of the Reliability and the Fault Trends of the SRS Cheryl Hodgkinson Daresbury Laboratory Synchrotron.
FSRUG Presentation – January 2014 Tennessee Valley Authority Browns Ferry Nuclear Plant Unit 3 Reactor Feed Water (FW) Clean Up Piping Break.
FRANKLIN engineering group, inc. Start-up Shutdown Malfunction Plan Development and Implementation Duncan F. Kimbro
1 Availability Modeling of Cooling Water Pumps to Assess if a Replacement Option is Economically Feasible. Dr. Salman Mishari.
2007 CMBG Conference David Hembree Institute of Nuclear Power Operations June 20, 2007 Charleston, SC INPO Perspective on Configuration Management.
Creating a Shared Vision Model. What is a Shared Vision Model? A “Shared Vision” model is a collective view of a water resources system developed by managers.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
Margin Management. PAGE 2 Margin Management Plant Shutdowns 1.Late 1990’s – numerous “surprise” long-term plant shutdowns 2.Shutdowns resulted when a.
Hazards Identification and Risk Assessment
ISO NON-CONFORMANCE, CORRECTIVE AND PREVENTIVE ACTION.
IAEA International Atomic Energy Agency Safety Reports Series No. 7 Lessons Learned from Accidents in Industrial Radiography Practical Radiation Safety.
REGULATORY PERSPECTIVE ON USING OPERATIONAL EXPERIENCE Thomas E. Murley Former Director of Nuclear Reactor Regulation USNRC Conference on Improving Nuclear.
Harris Plant – Loss of Main Feed Pump Lube Oil INPO ICES # HNP Root Cause Evaluation
IENG 423 – Designing Decision Support Systems Sample DSS Analysis.
PMO2000™ 1 Improved Reliability through PM Optimisation Project Team: Electrician Planner Mechanic Operator Reliability Engineer.
Failure Modes and Effects Analysis A Failure Modes and Effects Analysis (FMEA) tabulates failure modes of equipment and their effects on a system or plant.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Overview of Risk Informed Inspection Workshop Information IAEA Workshop City,
Impacts and Actions Resulting from the August 14, 2003 Blackout Minnesota Power Systems Conference November 2, 2003.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Software Project Management Lecture # 12. Outline Quality Management ( chapter 26 - Pressman )  SQA  Who does it?  SQA Activities  Software reviews.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Human Error Reduction – A Systems Approach.
Version 1.0, May 2015 BASIC PROFESSIONAL TRAINING COURSE Module X Operational safety including operational feedback Case studies This material was prepared.
Version 1.0, May 2015 BASIC PROFESSIONAL TRAINING COURSE Module XX Regulatory control Case Study This material was prepared by the IAEA and co-funded by.
Six Sigma Greenbelt Training
Lessons Learned in Vendor Oversight
Current Plant Performance
Global 8D Problem Solving
2012 Operating Experience for Feedwater and Related Systems
NRC CM Pilot Inspections Methodology and Results
Impacts and Actions Resulting from the August 14, 2003 Blackout
Regulatory Oversight of HOF in Finland
INPO Perspective of Industry CM Performance
Charge 2. Equipment Protection 3. Definition and Documentation
LOP Flare Pilot Outage Shell Martinez Refinery 7/6/18
Final Design Authorization
Copyright © 2005 Prentice Hall, Inc. All rights reserved.
BASIC PROFESSIONAL TRAINING COURSE Module X Operational safety including operational feedback Case studies Version 1.0, May 2015 This material.
BASIC PROFESSIONAL TRAINING COURSE Module XX Regulatory control Case Study Version 1.0, May 2015 This material was prepared by the IAEA and.
Presentation transcript:

Harris Plant - Heater Drain System Transients INPO ICES # HNP Root Cause Evaluation

Presentation Outline  System Overview  System History  Atypical System Characteristics  Recent Problems  Cause(s) of Problems  Generic Lessons Learned 2

Heater Drain System Schematic – ‘A’ Train 3

Heater Drain System Schematic – ‘A’ Train (Cont’d) 4

System History  Initial operation experienced significant system instability issues.  Unstable HD and FRV control valve operation due to excessive pressure drops across the valves.  10 plant trips during first five months of power ascension testing and commercial operation, most of which were caused by BOP problems.  A Study recommended seven modifications to the BOP. These included:  Removing an impeller stage from the Heater Drain Pumps.  Replacing the pneumatic controllers on the #4 FWHs, #5 FWHs, and MSR Drain Tanks with electronic level controllers.  Trimming the Main Feedwater Pump impellers.  The result was significantly more stable and reliable plant operation.  The modifications continued to work effectively for the next 25 years of operation. 5

Atypical System Characteristics  No Heater Drain Tank.  Small level transients often result in a Heater Drain Pump trip.  Variable speed Condensate Booster Pumps.  Heater Drain Pump trips have a small impact on overall plant output.  Make and model of electronic controllers are unique to the Heater Drain System.  Knowledge of controllers eventually began to fade.  Knowledgeable personnel (with few exceptions) moved on.  First 20 years - System largely operated and maintained by tribal knowledge and as- needed corrective maintenance. 6

Overall Timeline of NCRs December 1, 2010 – March 5,

Timeline 8

Timeline 9

10

11

12

13

14

Root Cause 15 Previous actions taken to address Heater Drain System equipment failures, while appropriate, have not been thorough and intrusive enough to prevent additional failures and associated reactivity management events. Until the most recent series of failures, insufficient attention was given to the source, quality, and age of replacement parts. In addition, considering the number of Heater Drain System components that can cause a reactivity management event and the goal of minimizing the number of reactivity management events, the establishment of preventative maintenance tasks has not been broad and comprehensive enough.

Contributing Causes  Untimely resolution of obsolescence issues and inadequate shelf life controls resulted in defective components being installed.  Components impacting Reactivity Management were not considered in the initial PM basis development work for the Heater Drain System. The resulting lack of PMs resulted in several initial transients and reactivity management events.  Troubleshooting of Heater Drain System events were not managed effectively. 3 of 10 initiating events resulted in a total of 12 additional events before the System was successfully returned to service.  The portion of OP-136 used to set the alternate level controller setpoints for the 4A and 4B FWHs was found to have deficiencies that contributed to the recurrence and severity of Heater Drain System transients and reactivity management events. 16

Generic Lessons Learned  Systematic troubleshooting is vital.  If you don’t have enough data to determine cause, seriously consider restarting equipment to collect more data, rather than replacing all the parts that potentially could have caused the problem.  Clearly define the roles and responsibilities of personnel on your troubleshooting team and insist management respect and follow the organization established.  Divide data collection and other field work from troubleshooting to allow the troubleshooting team to stay focused and function well as a multi-discipline team.  Don’t be so focused on producing a Support/Refute Matrix or Operational Decision Recommendation, that you short change the data collection and analysis. 17

18