Brandon Robinson Danut Tabacaru Victor Ho Autonomous Spacecraft Impact Monitoring and Repair Autonomous Spacecraft Impact Monitoring and Repair.

Slides:



Advertisements
Similar presentations
1 Damage State Awareness in Composite Laminates Via Ultrasonic Guided Waves Cliff Lissenden Joseph Rose Engineering Science & Mechanics The Pennsylvania.
Advertisements

Lamb Waves for Composite Health Monitoring
Types of Bone Fractures. Stress – Strain Force (N) Deformation (cm)
January 6. January 7 January 8 January 9 January 10.
Steven Chase 1, Yaw Adu-Gyamfi 2 and Paul Fuchs 3 1&2 Department of Civil Engineering, University of Virginia 3 Fuchs Consulting Inc.
 RSM TM is an important component in the processes of  DESIGN,  MANUFACTURING,  MAINTENANCE and  REPAIR of PARTS and WELDED ELEMENTS RESIDUAL STRESS.
Introduction of child assessment  一、 What is child assessment ( or evaluation )?  二、 Purposes or goals of child assessment  Educational and clinical.
Phase Difference = Phase Difference = 0.05.
Презентація за розділом “Гумористичні твори”
Центр атестації педагогічних працівників 2014
Галактики і квазари.
Характеристика ІНДІЇ.
Процюк Н.В. вчитель початкових класів Боярської ЗОШ І – ІІІ ст №4
Center for Nondestructive Evaluation I OWA S TATE U NIVERSITY Wind Turbine NDE Jeremy Van Dam.
Petroleum Engineering 406 Floating Drilling
Crack management Clemens van der Nat Bluewater Energy Services BV.
ILIA View: In-Line Inspection State-of-the-Art For SCC Presented by: Scott Thetford Manager- Government Relations GE-PII OPS Workshop on SCC December 2,
AE5301-Sensor Technologies for Structural Health Monitoring Spring 2007 Monday,Wednesday 9: :20 am Room 110, Nedderman Hall Instructor: Prof. Haiying.
Mike Doiron Doiron Aviation Consulting FATIGUE RISK MANAGEMENT PROGRAM AN INTRODUCTION.
Brandon Robinson Danut Tabacaru Victor Ho Autonomous Spacecraft Impact Monitoring Preliminary design presentation Autonomous Spacecraft Impact Monitoring.
Chapter 5 Study Guide Friday, February 26, Section 1 Understand what a fault is. Be able to describe the different types of faults. Be able to discuss.
Genesis Pipeline Spill Collins, Mississippi Genesis Pipeline Co. USA Application of RamSorb/Oil Gator. Spill detected Dec 20, First RamSorb/Oil Gator.
Brandon Robinson Danut Tabacaru Victor Ho Autonomous Spacecraft Impact Monitoring Critical design review Autonomous Spacecraft Impact Monitoring Critical.
Brandon Robinson Danut Tabacaru Victor Ho Autonomous Spacecraft Impact Monitoring Preliminary design presentation Autonomous Spacecraft Impact Monitoring.
Духовні символи Голосіївського району
DEAS2005Michael Shin Copyright1 Connector-Based Self-Healing Mechanism for Components of a Reliable System Michael E. Shin Department of Computer Science.
Brandon Robinson Danut Tabacaru Victor Ho Autonomous Spacecraft Impact Monitoring and Repair Autonomous Spacecraft Impact Monitoring and Repair.
1 INTRODUCTION TO DESIGN SKMM 1512 Semester 2 Session 2014/2015.
Problems 1. A large plate is fabricated from a steel alloy that has a plane strain fracture toughness of 82.4MPa√m. If, during service use, the plate is.
1.Introduction Omani Legislation PDO Policy SIEP PDO HSE Management System – Implementation and Monitoring PDO HSE Cases.
Load carrying capacity based on load testing Joan R. Casas Technical University of Catalunya (UPC) Barcelona, Spain.
CIHT Midland Branch Paper Competition 2010/2011 Moorgate Track Slab Helena Turner Pavement Consultancy Helena Turner Slide 1.
Earthquakes By Ms. Zavala Date.
Phase I Experiment 4 Different pavement structures, 8 sections Compare
Do Now: What do you know about earthquakes?.
Materials Science MENG 286
Date of download: 11/13/2017 Copyright © ASME. All rights reserved.
Robotics Sensors and Vision
Process Variables, Elements, and Instruments – Pressure - Agenda
February 12 – 19, 2018.
بسم الله الرحمن الرحيم.
Ultrasonics Baseline Free Impact Location
Welcome.
التعامل مع ضغوطات العمل إعداد وتقديم إقبال المطيري
COST Action TU 0904 “St. CIRIL and METHODIUS” UNIVERSITY
قوانين برگزاري مناقصات و آيين نامه مالي و معاملاتي دانشگاه علوم پزشكي و خدمات بهداشتي ،درماني تهران
Проф. д-р Васил Цанов, Институт за икономически изследвания при БАН
ЗУТ ПРОЕКТ на Закон за изменение и допълнение на ЗУТ
О Б Щ И Н А С И Л И С Т Р А П р о е к т Б ю д ж е т г.
Електронни услуги на НАП
Боряна Георгиева – директор на
РАЙОНЕН СЪД - БУРГАС РАБОТНА СРЕЩА СЪС СЪДЕБНИТЕ ЗАСЕДАТЕЛИ ПРИ РАЙОНЕН СЪД – БУРГАС 21 ОКТОМВРИ 2016 г.
Сътрудничество между полицията и другите специалисти в България
Съобщение Ръководството на НУ “Христо Ботев“ – гр. Елин Пелин
НАЦИОНАЛНА АГЕНЦИЯ ЗА ПРИХОДИТЕ
ДОБРОВОЛЕН РЕЗЕРВ НА ВЪОРЪЖЕНИТЕ СИЛИ НА РЕПУБЛИКА БЪЛГАРИЯ
Съвременни софтуерни решения
ПО ПЧЕЛАРСТВО ЗА ТРИГОДИШНИЯ
от проучване на общественото мнение,
Васил Големански Ноември, 2006
Програма за развитие на селските райони
ОПЕРАТИВНА ПРОГРАМА “АДМИНИСТРАТИВЕН КАПАЦИТЕТ”
БАЛИСТИКА НА ТЯЛО ПРИ СВОБОДНО ПАДАНЕ В ЗЕМНАТА АТМОСФЕРА
МЕДИЦИНСКИ УНИВЕРСИТЕТ – ПЛЕВЕН
Стратегия за развитие на клъстера 2015
Моето наследствено призвание
Правна кантора “Джингов, Гугински, Кючуков & Величков”
Безопасност на движението
Shear in Rubber Apparatus

Presentation transcript:

Brandon Robinson Danut Tabacaru Victor Ho Autonomous Spacecraft Impact Monitoring and Repair Autonomous Spacecraft Impact Monitoring and Repair

Agenda Introduction Project Proposal Phase 1 Phase 2 Phase 3 Milestones Source

Introduction Sisteems Engineering Brandon Robinson Danut Tabacaru Victor Ho Project Health Monitoring Force Detection Break Detection Autonomous Repair Source

Phase 1 Description Impact Force Detection Array of Strain Gauges and Aluminum Plate Detects Force and Location Performance Minimum 5N Force 0.5kg Ball 5% Location Accuracy Strain Gauge Visualization

Phase 2 Description Breakage Detection Assess Damage and Location Find Damage Extent Performance 5% Damage Extent Accuracy 5% Location Accuracy Panametrics Ultrasonic Transducers

Phase 3 (If Time Persists) Description Autonomous Healing Active or Passive Actual Method will be Researched Performance 25% Strength Stress Strain Fatigue Self-healing Material

Milestones Complete Phase 1: December 21, 2009 Complete Phase 2: February 5, 2010 Complete Phase 3: March 21, 2010 Source

Thank you