L.McTurk Aug 2002 Motorola General Business Use Motorola, the Stylized M, and all other trademarks indicated as such herein are trademarks of Motorola,

Slides:



Advertisements
Similar presentations
Control Charts for Variables
Advertisements

ENGM 620: Quality Management Session 8 – 23 October 2012 Control Charts, Part I –Variables.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall8-1 Chapter 8: Statistical Quality Control.
Chapter 6 - Part 1 Introduction to SPC.
Agenda Review homework Lecture/discussion Week 10 assignment
Multi-criteria Design of X-bar control chart Zhaojun (Steven) Li IND E 516 Homework 1.
Chapter 10 Quality Control McGraw-Hill/Irwin
Statistical Process Control A. A. Elimam A. A. Elimam.
Software Quality Control Methods. Introduction Quality control methods have received a world wide surge of interest within the past couple of decades.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Quality Control.
Eng. Mgt. 385 Statistical Process Control Stephen A. Raper Chapter 9 – Statistical Analysis of Process Capability and For Process Improvement.
Goal Sharing Team Training Statistical Resource Leaders (1)
8-1 Quality Improvement and Statistics Definitions of Quality Quality means fitness for use - quality of design - quality of conformance Quality is.
Additional SPC for Variables EBB 341. Additional SPC?  Provides information on continuous and batch processes, short runs, and gage control.
© January 27, 2006 Dr. Lynn Fuller, Motorola Professor Simulation Page 1 Rochester Institute of Technology Microelectronic Engineering ROCHESTER INSTITUTE.
15 Statistical Quality Control CHAPTER OUTLINE
IE 355: Quality and Applied Statistics I Short Run SPC
X-bar and R Control Charts
Quality Control and Improvement
Statistical Process Control
MBSW 2012 Midwest Biopharmaceutical Statistics Workshop May 21-23, 2012 Presenter: Krista Witkowski Co-author: Julia O’Neill Merck & Co., Inc. Capability.
Band Saw Safety Rules. Safety Rule #1 Keep all guards in place. Keep all guards in place.
Manufacturing Technology Safety: Band Saw. Safety Rule #1  Keep all guards in place.
© 2002 Systex Services Capability and Improvement - from Cpk to Six Sigma.
Annex I: Methods & Tools prepared by some members of the ICH Q9 EWG for example only; not an official policy/guidance July 2006, slide 1 ICH Q9 QUALITY.
10-1Quality Control William J. Stevenson Operations Management 8 th edition.
IES 303 Engineering Management & Cost Analysis | Dr. Karndee Prichanont, SIIT 1 IES 303 Chapter 5: Process Performance and Quality Objectives: Understand.
9/3/2015 IENG 486 Statistical Quality & Process Control 1 IENG Lecture 11 Hypothesis Tests to Control Charts.
Process Capability Process capability For Variables
Steps in Using the and R Chart
Understanding Variation in Your Charts Module 5. What is the state of Statistical Control? A stable mean over time with only random variation about that.
Event Management & ITIL V3
Relationship Between in-situ Information and ex-situ Metrology in Metal Etch Processes Jill Card, An Cao, Wai Chan, Bill Martin, Yi-Min Lai IBEX Process.
To accompany Quantitative Analysis for Management, 9e by Render/Stair/Hanna 17-1 © 2006 by Prentice Hall, Inc. Upper Saddle River, NJ Chapter 17.
Putting the “Engineering” in Software Engineering: Technology Infrastructure in Process Improvement Adam Kolawa, Ph.D. CEO, Parasoft.
Brian Macpherson Ph.D, Professor of Statistics, University of Manitoba Tom Bingham Statistician, The Boeing Company.
Chapter 36 Quality Engineering (Part 2) EIN 3390 Manufacturing Processes Summer A, 2012.
Operations Management
A Process Control Screen for Multiple Stream Processes An Operator Friendly Approach Richard E. Clark Process & Product Analysis.
Reid & Sanders, Operations Management © Wiley 2002 Statistical Quality Control 6 C H A P T E R.
CHAPTER-2 Fundamentals of Digital Logic. Digital Logic Digital electronic circuits are used to build computer hardware as well as other products (digital.
Statistical Quality Control
OPSM 301 Operations Management Class 17: Quality: Statistical process control Koç University Zeynep Aksin
Production and Operations Management: Manufacturing and Services PowerPoint Presentation for Chapter 7 Supplement Statistical Quality Control © The McGraw-Hill.
Electronic. Analog Vs. Digital Analog –Continuous –Can take on any values in a given range –Very susceptible to noise Digital –Discrete –Can only take.
Copyright © 2010 Pearson Education, Inc. All rights reserved Sec
CHAPTER 7 STATISTICAL PROCESS CONTROL. THE CONCEPT The application of statistical techniques to determine whether the output of a process conforms to.
1 Some Special Process Control Procedures and s charts Warning limits Control charts for moving averages chart with a linear trend.
Control Charts. Statistical Process Control Statistical process control is a collection of tools that when used together can result in process stability.
MOS 3330 Operations Management Professor Burjaw Fall/Winter
CSE SW Metrics and Quality Engineering Copyright © , Dennis J. Frailey, All Rights Reserved CSE8314M33 8/20/2001Slide 1 SMU CSE 8314 /
McGraw-Hill/Irwin  The McGraw-Hill Companies, Inc. 2007, All Rights Reserved Quality Control and Improvement Chapter 9.
Part II AUTOMATION AND CONTROL TECHNOLOGIES
36.3 Inspection to Control Quality
Process Control Charts
How to use SPC Before implementing SPC or any new quality system, the manufacturing process should be evaluated to determine the main areas of waste. Some.
Band Saw Safety Rules.
Process Capability and Capability Index
Band Saw Safety Rules.
10 Quality Control.
MDIC- Case for Quality Forum
Agenda Review homework Lecture/discussion Week 10 assignment
Band Saw Safety Rules.
Band Saw Safety Rules.
Process Capability Process capability For Variables
Some Special Process Control Procedures
Band Saw Safety Rules.
Roots, Radicals, and Root Functions
Presentation transcript:

L.McTurk Aug 2002 Motorola General Business Use Motorola, the Stylized M, and all other trademarks indicated as such herein are trademarks of Motorola, Inc. ® Reg. U.S. Pat. & Tm. Off. All other product or service names are the property of their respective owners. © Motorola, Inc All rights reserved. SPS Scotland Introduction Laurie McTurk Motorola, Quality, EKB, Scotland Six Sigma Black Belt (1995) Dennis Wilson Motorola, Process eng, MOS9, EKB, Scotland Six Sigma Black Belt candidate

L.McTurk Aug 2002 Motorola General Business Use Motorola, the Stylized M, and all other trademarks indicated as such herein are trademarks of Motorola, Inc. ® Reg. U.S. Pat. & Tm. Off. All other product or service names are the property of their respective owners. © Motorola, Inc All rights reserved. SPS Scotland Contents Manufacturing Semiconductors Inline process control Maintaining good control limits with x,000 charts Trying to see ‘the wood for the trees’ Managing ownership and driving continuous improvement

L.McTurk Aug 2002 Motorola General Business Use Motorola, the Stylized M, and all other trademarks indicated as such herein are trademarks of Motorola, Inc. ® Reg. U.S. Pat. & Tm. Off. All other product or service names are the property of their respective owners. © Motorola, Inc All rights reserved. SPS Scotland Objective is to turn Silicon wafers into ICs Each wafer can have ~300 to X,000 ICs Yield is determined by how many wafers remain after all processes + What proportion of ICs function when tested (% good area of wafer).

L.McTurk Aug 2002 Motorola General Business Use Motorola, the Stylized M, and all other trademarks indicated as such herein are trademarks of Motorola, Inc. ® Reg. U.S. Pat. & Tm. Off. All other product or service names are the property of their respective owners. © Motorola, Inc All rights reserved. SPS Scotland Sequential process Typically ~300 processes, 3 -4 weeks cycle time Can be up to 600 processes Electrical functional testing Inline process measurement & control

L.McTurk Aug 2002 Motorola General Business Use Motorola, the Stylized M, and all other trademarks indicated as such herein are trademarks of Motorola, Inc. ® Reg. U.S. Pat. & Tm. Off. All other product or service names are the property of their respective owners. © Motorola, Inc All rights reserved. Serial processing All processes have the potential to scrap a batch. IC verification is only possible after all inline processing is complete. Inline process control must be maintained to avoid scrap product arriving at electrical verification. Inline process control maintains optimum processing conditions leading to maximized production yield.

L.McTurk Aug 2002 Motorola General Business Use Motorola, the Stylized M, and all other trademarks indicated as such herein are trademarks of Motorola, Inc. ® Reg. U.S. Pat. & Tm. Off. All other product or service names are the property of their respective owners. © Motorola, Inc All rights reserved. SPS Scotland Process control Each individual process must have Process monitor Indicator of the completed IC performance E.g Measured polysilicon gate dimension Transistor channel length Speed of the circuit. Homogenous data stream Use SPC to maintain control

L.McTurk Aug 2002 Motorola General Business Use Motorola, the Stylized M, and all other trademarks indicated as such herein are trademarks of Motorola, Inc. ® Reg. U.S. Pat. & Tm. Off. All other product or service names are the property of their respective owners. © Motorola, Inc All rights reserved. SPS Scotland Sample Plan example 3 wafers, 3 data sites per wafer

L.McTurk Aug 2002 Motorola General Business Use Motorola, the Stylized M, and all other trademarks indicated as such herein are trademarks of Motorola, Inc. ® Reg. U.S. Pat. & Tm. Off. All other product or service names are the property of their respective owners. © Motorola, Inc All rights reserved. Factory wide computer system Data entered into data collection files and subsequent control charts. Data is charted by machine Trends and shifts within the process are detected by applying Western Electric control rules to the charts. Out of limit rule violation results in immediate, automated equipment shutdown, guarding against any further product risk.

L.McTurk Aug 2002 Motorola General Business Use Motorola, the Stylized M, and all other trademarks indicated as such herein are trademarks of Motorola, Inc. ® Reg. U.S. Pat. & Tm. Off. All other product or service names are the property of their respective owners. © Motorola, Inc All rights reserved. Automated out of limit actions, however, are only useful if the imposed limits are accurate. Limits too loose Significant changes/excursions go undetected until fab completion possible scrap, reduced yield, etc.

L.McTurk Aug 2002 Motorola General Business Use Motorola, the Stylized M, and all other trademarks indicated as such herein are trademarks of Motorola, Inc. ® Reg. U.S. Pat. & Tm. Off. All other product or service names are the property of their respective owners. © Motorola, Inc All rights reserved. Limits too tight false alarms/‘white noise’ poor productivity over adjustment increased variability frustration from the front line operators

L.McTurk Aug 2002 Motorola General Business Use Motorola, the Stylized M, and all other trademarks indicated as such herein are trademarks of Motorola, Inc. ® Reg. U.S. Pat. & Tm. Off. All other product or service names are the property of their respective owners. © Motorola, Inc All rights reserved. Western Electric control rules are probability based tests Some risk that a process is behaving differently from previous history.

L.McTurk Aug 2002 Motorola General Business Use Motorola, the Stylized M, and all other trademarks indicated as such herein are trademarks of Motorola, Inc. ® Reg. U.S. Pat. & Tm. Off. All other product or service names are the property of their respective owners. © Motorola, Inc All rights reserved. The Instability index A tool to identify charts that are not performing according to the control limits and centrelines installed Number of control rules violated within time period Number of points collected within time period

L.McTurk Aug 2002 Motorola General Business Use Motorola, the Stylized M, and all other trademarks indicated as such herein are trademarks of Motorola, Inc. ® Reg. U.S. Pat. & Tm. Off. All other product or service names are the property of their respective owners. © Motorola, Inc All rights reserved. The daily Istab report thus catches Xbar charts with too wide control limits Range, Std Dev, Particle charts with limits set too high

L.McTurk Aug 2002 Motorola General Business Use Motorola, the Stylized M, and all other trademarks indicated as such herein are trademarks of Motorola, Inc. ® Reg. U.S. Pat. & Tm. Off. All other product or service names are the property of their respective owners. © Motorola, Inc All rights reserved. The Istab is at a minimum when The fewest excursions occur The control limits and centerlines are accurate The process is stable Off target & Out of control Off target & wide limits Stable process & accurate control limits

L.McTurk Aug 2002 Motorola General Business Use Motorola, the Stylized M, and all other trademarks indicated as such herein are trademarks of Motorola, Inc. ® Reg. U.S. Pat. & Tm. Off. All other product or service names are the property of their respective owners. © Motorola, Inc All rights reserved. Using the Istab metric in this fashion promotes the use of accurate control limits and centerlines FROM TO Even on skewed distributions like particles, Ranges, Std.Dev

L.McTurk Aug 2002 Motorola General Business Use Motorola, the Stylized M, and all other trademarks indicated as such herein are trademarks of Motorola, Inc. ® Reg. U.S. Pat. & Tm. Off. All other product or service names are the property of their respective owners. © Motorola, Inc All rights reserved. Two tier control rule system Engineering warning Western Electric rules inside control limits (e.g. 8 points one side of the centreline) minimizing production false alarms Automated immediate equipment shutdown on control limit violation With accurate control limits and centrelines established Increase in Istab is an early warning of a change in the process Control limit violation is likely to be due to a real process excursion Less likely to be a false alarm.

L.McTurk Aug 2002 Motorola General Business Use Motorola, the Stylized M, and all other trademarks indicated as such herein are trademarks of Motorola, Inc. ® Reg. U.S. Pat. & Tm. Off. All other product or service names are the property of their respective owners. © Motorola, Inc All rights reserved. Create a measure the measures to maintain process control Is the metric is being used to identify and rectify problems ? Derive a mean daily Istab per process group and per engineer Chart file labels identify ownership by process section and by engineer Trend graph the mean of these Istabs for each day A 60 day rolling trend shows if process control is Improving Worsening Stable Breaking the trend out by owner drives consistency across the factory