Low Mass Local Supports for the ATLAS Upgrade Inner Silicon Barrel Tracker Peter Sutcliffe University of Liverpool On behalf of the ATLAS Upgrade Inner.

Slides:



Advertisements
Similar presentations
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Advertisements

ATLAS Module building at Glasgow
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Outer Stave Prototype Update E. Anderssen, M. Cepeda, M. Garcia-Sciveres, M. Gilchriese, N. Hartman, J. Silber LBNL W. Miller, W. Shih Allcomp, Inc ATLAS.
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
S Temple CLRC1 End-cap Mechanics FDR Cooling Structures Steve Temple, RAL 1 November 2001.
Tooling and assembly of US stavelet at Berkeley S. Díez Cornell, C. H. Haber, M. Defferrard, R. Witharm Sept 6th, 2012 Berkeley mechanical meeting, 5th-7th.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
Recent Mechanical Barrel Stave Development BNL; S. Duffin, A. Gordeev, D. Lynn, G. Mahler: LBNL; C. Haber, M. Gilchriese: Yale; W. Emmett, A. Martin, P.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Material calculation of petal core variants Sergio Díez Cornell with input from many people CERN AUW, 3 rd Nov 2014.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
SLHC Pixel Layout Studies S. Dardin, M. Garcia-Sciveres, M. Gilchriese, N. Hartman LBNL November 4, 2008.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
Stave Core QC Peter Sutcliffe RAL 24 th Sept 2014.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Low mass carbon based support structures for the HL-LHC ATLAS pixel forward disks R. Bates* a, C. Buttar a, I. Bonad a, F. McEwan a, L. Cunningham a, S.
Ideas for LC mechanics (we will work on sensors as well – particular CMOS)
Design Discussion of Mechanical / Electrical Interfaces Bill Cooper (Fermilab) (Layer 1) VXD.
A thermo-mechanical petal Sergio Díez Cornell Petal discussion, 24 Oct 2014.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
PHENIX Silicon Vertex Tracker. Mechanical Requirements Stability requirement, short and long25 µm Low radiation length
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
Neil Jackson University of Liverpool Hiroshima Symposium June THE ATLAS SEMICONDUCTOR TRACKER (SCT) A PRESENTATION ON BEHALF OF THE ATLAS.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
Stave 130 Geometry Peter Sutcliffe ATLAS Strips WP4 Meeting 26 th March 14 Liverpool.
End-of-stave region. 2 Space Z-dimension is critical –Keep gap small (might help getting rid of stubs) Edge of last barrel silicon (at corner) is 1277.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
Stave - Electrical Break Richard French The University of Sheffield Material from the ATLAS SCT/IBL/PIXEL community.
Stave 130 Envelope Peter Sutcliffe Strip Mechanics 20 th February Lancaster.
Local Supports to IDR Discussion ATLAS Upgrade Week November 2014.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
Stave production.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
A hollow stave Ian Wilmut – August LBL stave At the March UG week LBL showed a prototype asymmetric stave. This prompted consideration of the strip.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
Stave Tooling & Plans for Future Stave-building (Tim)
Thermo-mechanical petals Volker Prahl, Sergio Díez, on behalf of the petal community CERN AUW, 3 rd Nov 2014.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
(Tim Jones).  Who am I? ATLAS-UK Tracker Upgrade work-package leader for WP4 (Mechanics)  Materials, Cooling, Stave Core Assembly, Module Mounting,
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
Strip Stave Status & Plans at Yale Yale: Paul Tipton, Will Emmet, Tom Hurteau.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Graham Beck (QMUL) LBNL Sept Berlin, March 2013: FEA of Side-Mounted Card + Straight Cooling Pipe (not wiggled through SMC region): For adequate.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
EC: 7 DISK concept Preliminary considerations
Straw man layout for ATLAS ID for SLHC
Summary LBNL LSWG meeting
Strip Petals: Local supports and prototype tests
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
Are there better ways to build a stave?
? ENDCAP: Mechanics IFIC-Valencia.
Cooling loops for prototype Staves
Mechanics: (Tim).
Constructional requirements from ITk-Strips
WG4 – Progress report R. Santoro and A. Tauro.
Presentation transcript:

Low Mass Local Supports for the ATLAS Upgrade Inner Silicon Barrel Tracker Peter Sutcliffe University of Liverpool On behalf of the ATLAS Upgrade Inner Tracker Barrel Collaboration DESY 1 st July 2014

Outline of Local Support The local support, or stave is a fully integrated structure. – i.e. Stave is a glued assembly, no screws The stave is manufactured from low mass, polymeric materials. Staves are mounted onto support cylinders using locking points. 01/07/14 Forum on Tracker Detector Mechanics - Hamburg,

ATLAS Phase-2 Upgrade Post LS3 ( ) LHC enter full HL-LHC operation – Typically 200 collisions per bunch crossing at intervals of 25ns. – Integrated radiation levels for 3000fb-1 reach 3×10 16 n eq /cm 2 Replacement required to extend physics output into HL-LHC era – Current tracker components will have accumulated radiation damage levels in excess of their original design specifications – Current tracker will not cope with new data rates Proposed replacement tracker exploits developments in silicon device technology & integrated mechanics 01/07/14 Forum on Tracker Detector Mechanics - Hamburg,

Current ATLAS Tracking SCT – 61m 2 of silicon with 6.2 million readout channels – 4088 silicon modules arranged to form 4 Barrels and 18 Disks (9 each end) – Barrels : 2112 modules (1 type) giving coverage |ƞ| < 1.1 to 1.4 – Endcaps : 1976 modules (4 types) with coverage 1.1 to 1.4 <|ƞ| < 2.5 – 30cm < R < 52cm – Space point resolution r ~16μm / Z~580μm Pixels – 1744 Pixel Modules on three barrel layers and 2 x 3 discs covering 1.7m 2 – 80M readout channels 01/07/14 Forum on Tracker Detector Mechanics - Hamburg,

Module Technologies Current SCT has 4088 independent modules – Individually assembled & tested – Individually mounted to support structures – Individually connected to services 01/07/14 Forum on Tracker Detector Mechanics - Hamburg,

Mechanics & Services of the Existing Tracker ‘Classic’ Tracker Design 01/07/14 Forum on Tracker Detector Mechanics - Hamburg, SCT Endcap disk showing outer and inner modules with their services interconnects SCT Barrel cylinder showing rows of modules with their services interconnects

ATLAS Phase-2 Tracker Upgrade Baseline layout of the new ATLAS inner tracker aims to have at least 14 hits everywhere for robust tracking All silicon Inner Detector – 4(pixel) + 5(strip-pairs) – Strips: 200m 2 (5 ½ barrel layers + 2x7 disks) (x3.3) – Pixels: 8 m 2 (x4.7) Exploit “Integration by Design” to fight services complexity 01/07/14 Forum on Tracker Detector Mechanics - Hamburg, Long Barrel Strips Short Barrel Strips Forward Strips Barrel pixel Microstrip Module & Stave Prototype Forward pixel Pixel Sensor Wafer and Module Prototype

600 Staves 5 Cylinders Cylinders and Staves 01/07/14 Forum on Tracker Detector Mechanics - Hamburg, Total Number of Cylinders: 5 Total Number of Staves: 600 (including stub and no spares) – currently 8 different stave flavours Total Number of Modules: – 13 Modules per side of stave = 26 modules per stave – 2 Modules per side of stave for a stub

Stave positions on cylinders angle and clearances * LayerNo of Staves in 360° Radii to Centre of Stave (Stub) /07/14 Forum on Tracker Detector Mechanics - Hamburg, * Minimum clearance between staves to be around 2mm with a 10° tilt angle Opto package will change to a slimmer version

Stave Geometry Critical Dimensions: Overall Length 1277 Width 115 SMC area 100 x 50 EOS at Z=0 to Silicon Edge 0.1mm Start of Silicon from Z= = 3.36 Module to Module Gap 0.46mm Pitch of Modules 98mm Critical Dimensions: Overall Length 1277 Width 115 EOS at Z=0 to Silicon Edge 0.1mm Module to Module Gap 0.46mm Pitch of Modules 98mm 01/07/14 Forum on Tracker Detector Mechanics - Hamburg, R Phi Side Stereo Side

Modules, End of Stave Cards and Locking Points 01/07/14 Forum on Tracker Detector Mechanics - Hamburg, R Phi Module End of Stave Card Stereo Module Locking Point Exploded view of the ‘mechanically’ simple module SE4445 Glue

Stave Detail 01/07/14 Forum on Tracker Detector Mechanics - Hamburg, R-Phi Bus tape Co-cured to Carbon Skin EOS Closeout Cooling Tube Assy Stereo Bus tape Co-cured to Carbon Skin Allcomp foam Cooling strips Honeycomb core Carbon C Channels Allcomp foam End cooling Z=0 Closeout

Stave Construction and Materials 01/07/14 Forum on Tracker Detector Mechanics - Hamburg, Stave is manufactured from 2 UD Carbon and kapton face sheets with a core manufactured from Ultracor Honeycomb and Allcomp Foam ComponentMaterialRemarks Carbon Face sheet Tencate K13C2U 45g/m 2 EX1515 Resin 3 layers 90/0/90 total thickness 0.15mm Co-cured onto a kapton bus, thickness 0.2mm Honeycomb Core Ultracor Carbon Honeycomb UCF-126-3/8-2.0 Final thickness 5.2mm Carbon Foam Core Allcomp K9Final thickness 5.2mm Cooling tubeTitanium CP x wall End CloseoutsPEEK CF30 C ChannelsCarbon Fibre Honeycomb core Carbon foam C Channel Face sheet Bus tape

Manufacture of the staves Stave Assembly tooling 01/07/14 Forum on Tracker Detector Mechanics - Hamburg, C Channel and closeouts placement Jig Stave Vacuum jig John Carroll Stephanie Yang

Assembly Sequence- Co-cured face sheet 01/07/14 Forum on Tracker Detector Mechanics - Hamburg, Face sheet corner locator Dowel Stephanie Yang

Assembly Sequence- Add lower foam cooling blocks 01/07/14 Forum on Tracker Detector Mechanics - Hamburg, Block Alignment tooling not shown Face sheet to be masked off before applying glue (BN loaded Hysol 9396)

Assembly Sequence- Add Closeouts 01/07/14 Forum on Tracker Detector Mechanics - Hamburg, SMC end closeout Z=0 Enc closeout Design not final WIP

Assembly sequence - Inserting the cooling tube into the foam grooves 01/07/14 Forum on Tracker Detector Mechanics - Hamburg, Tube gluing jig

Assembly sequence- Add upper foam cooling blocks 01/07/14 Forum on Tracker Detector Mechanics - Hamburg,

Assembly sequence – Add ‘C’ Channels using the ‘C’ Channel placement jig 01/07/14 Forum on Tracker Detector Mechanics - Hamburg, Masking tape glue Remove the masking tape and place the assembly unit on to the main jig, reference to the dowels at each end.

Assembly sequence – Adding the Honeycomb 01/07/14 Forum on Tracker Detector Mechanics - Hamburg, Next step is Honeycomb gluing process: dipping the honeycomb pieces into the glue bath and dropping them onto the void region of the face sheet. Then the partially built stave together with the Stave assembly jig, is taken to the CNC for machining to the correct height.

Assembly sequence – Add upper co-cured face sheet 01/07/14 Forum on Tracker Detector Mechanics - Hamburg,

Assembly Sequence – Add the locking points using the locking point gluing ruler 01/07/14 Forum on Tracker Detector Mechanics - Hamburg, glue applying to this face reference faces Insert the locking point into the holding blocks Insert the holding blocks into the location ruler Glue the locking points into the C channel in the stave

Plank #9 manufacture 01/07/14 Forum on Tracker Detector Mechanics - Hamburg, Stephanie Yang Georg Viehhauser Total weight of stave g

Plank #9 flatness and stiffness 01/07/14 Forum on Tracker Detector Mechanics - Hamburg, Flatness is around 0.20 and a twist has been shown. Not as good as we would like although the overall thickness is very uniform, proving the CNC machining of the core works. Bending stiffness of the planks made so far.

OD 2.275mm x 0.1 wall Cooling Tube Electrical break assembly St St Swagelok Fitting Ti Gland Cooling tube and Electrical Break Assembly 01/07/14 Forum on Tracker Detector Mechanics - Hamburg, A ssembly vacuum brazed with silver copper eutectic Brazing temperature around 780°C Several have been manufactured and look good. Alumina insulator is very strong Electrical break assembly is welded to the stave and inlet/exit tubes. E break assembly is potted into the closeout Cooling tube assembly procedure: – Manufacture main cooling tube – Vac Braze E-Break and U tube assembly – Manufacture Ti Glands – TIG Weld Above 3 components 2.5mm Dia Ti reducer 2.275mm Dia Ti Tube Alumina insulator 2.275mm Dia Ti reducer 2.5mm Dia Ti Tube Richard French Potted into end closeout

Tube Welding Material Titanium CP2 Precision drawn round tube, pressure tested to 150 Bar Full Metallurgical qualification of TIG welded Ti pipes from MME has been done TIG orbital welding: – Portable automated equipment, no filler material (autogenous process) or sleeve joint required for welding. Highly repeatable, low cost, low XO when compared with connectors. TIG orbital welding limit is around OD x 125μm wall – Butt welding successful on both 2.275mm and 1/8” tube 01/07/14 Forum on Tracker Detector Mechanics - Hamburg, Richard French Welded Tube Tube in weld head Weld setup Ct X ray scan

Z=0 End Closeout 01/07/14 Forum on Tracker Detector Mechanics - Hamburg, Z=0 Closeout manufactured from PEEK 3D Printed Model Stave to Stave Dimensions At Z=0

Stave mounting onto Cylinder 01/07/14 Forum on Tracker Detector Mechanics - Hamburg, The stave is mounted onto the cylinder using 5 locking points and 2 location points. – The locking points use a cam to lock the stave into position – There are 5 locking points on the length of a stave – All 5 locking points are fixed sequentially using a long hex key. Stephanie Yang

Insertion onto the Cylinder 01/07/14 Forum on Tracker Detector Mechanics - Hamburg, The picture shows insertion onto a sector prototype The locking points are also shown. The picture below shows the end brackets and location in Z and R phi Insertion trials have demonstrated that the staves are within their designated envelopes.

Thermal FEA 01/07/14 Forum on Tracker Detector Mechanics - Hamburg, Graham Beck Thermal FEA has been done on all areas of the stave and includes ‘hot spots’ such as the on board DCDC Chip and the Z=0 end of stave region where the cooling tube bends. Thermal headroom and Thermal Runaway has been evaluated and the headroom expected at 3000 fm-1 plotted, in terms of sensor power and CO2 temperature. – Headroom takes into account mechanical thermal variations such as material conductivity and glues

FE Materials Chart 01/07/14 Forum on Tracker Detector Mechanics - Hamburg, ItemMaterialK x / y / z [W/m-K]thickness [mm]additional info. Asicsilicon191 (250K) … 148 (300K)0.3 Table 1 in extended doc. asic to hybridtra-duct (0.1)50% area coverage Poss. alternative: non-conductive glue (thinner) hybridCu/polyimide72 / , / (0.3)New - for 3 layer hybrid (2013-) 1 outside via region, 2 within 3mm via region. (a poorer approx is 0.36 W/mK over all hybrid) hybrid to sensorepolite (0.1)2mm stay-clear (guard region)K from Glasgow measurement. Sensorsilicon191 (250K) … 148 (300K)0.3 Table 1 in extended doc. sensor to busDC SE (a) 60% glue strips, along Z. R ≡ 0.1mm/1.0W/mK K[W/mK]: Glasgow ~2 (8Feb11). DaveL: 1.8, mfr’s spec:1.26. Gel! - Seeking alternative bus tapePolyI/Cu/Al0.17 / 0.24 / 0.17 (34)0.17 Shieldless tape. (c) Estd: awaiting samples. Previously: 25um Al shield: Ky (Glasgow, meas) Kxz =34 (Edbg.calc). Cu neglected (~16% area). bus to facing(Hysol)Set high (0.21)(0.1)(Hysol)N/A: Assume co-cure! Facing CFRP90/1/180 (140/1/280)0.15 (0.21) K13C2U 45gsm (K13D2U 100gsm) Values for 45gsm/K13C from QMUL(Kab,Kc) Liverpool(thickness, Kx,z calc.). (May 2013). Facing to Honeycomb n/a--Suppressed in FEA.( was Hysol, 0.21 W/mK, 0.1mm) Honeycombn/a (air)--Suppressed in FEA(CF honeycomb low K / Poor interface to foam). Facing to FoamHysol+BN1.33 (1.63)0.1 ~ 1.3W/mK for 35% BN (Glasgow). Joint thickness + integrity uncertain. FoamAllcomp30 (43/55/43)As drawn (replaces Pocofoam) Foam to PipeHysol+BN1.33 (1.63)0.1 See Facing to foam (above). Cooling Pipe 2mm i/d Titanium (Grade 2) (20-100C, Sandvik data sheet). Alt: S/Steel 316L, 3.18 o/d, 0.22 wall, K=14, 15.3 at 250, 300K. (Table 2) Fluid filmCO2htc ~ 8000 W/m 2 Ktypical at low vapour qualityVaries with vapour quality, mass flow rate etc. (b) Graham Beck

Modal analysis Model of the structure 01/07/14 Forum on Tracker Detector Mechanics - Hamburg, Fixed in 6 dof surfaces, 3 and 9 o’clock positions A & C ends 8-ply (0/45/-45/-90 x2) Interlinks w/equivalent mass (+Δρ) (0.496mm) Staves represented as equally distributed mass in Barrel density (no local support modelled) 4-ply (0/45/-45/90) Barrels w/equivalent mass (+Δρ) (0.248mm) Representative flange geometries with internal bonded web Bonded interfaces assume zero slip or separation No connection at PST assumed Robert Gabrielczyk

General modal result (WIP) 01/07/14 Forum on Tracker Detector Mechanics - Hamburg, Input Direction (1→200Hz, 1x10 -8 G 2 /Hz) Max. δfZ (μm)Y (μm)X (μm) UZ x x 10-5 UY2.09 x x x 10-4 UX1.29 x x x 10-4 Random Vibration Results - Deformations 3 σ (99.73%) = 3.08μm ASD Input Freq (Hz)G 2 /Hz 11 x x x Results Robert Gabrielczyk

Other local support applications of the integrated low mass structure 01/07/14 Forum on Tracker Detector Mechanics - Hamburg, Forward pixel half ring Forward Strip petal David Santoyo

Summary and Conclusions The fully integrated stave reduces potential failure points, such as not having screwed modules and having a fully glued cooling structure, replacing connectors with wire bonds and TIG welded tubes Around 10 prototype full size staves and mechanical, thermal and electrical prototypes have been made and have proved to be mechanically and thermally stable. Throughout the prototype stages, improvements have been made and major changes such as the change from 250nm chip to 130nm. We are now at the stage of producing a ’final’ design, which can be transferred to a full scale production of 500 staves of 8 different flavours. 01/07/14 Forum on Tracker Detector Mechanics - Hamburg,