Guidelines for the Planning and Deployment of EVP and TSP Presented by: Hesham Rakha Associate Professor, Civil and Environmental Engineering Director,

Slides:



Advertisements
Similar presentations
Beltline Highway ITS – Ramp Metering Project ODOT Planners Meeting April 25, 2012.
Advertisements

Interim Guidance on the Application of Travel and Land Use Forecasting in NEPA Statewide Travel Demand Modeling Committee October 14, 2010.
Travel Time Estimation on Arterial Streets By Heng Wang, Transportation Analyst Houston-Galveston Area Council Dr. Antoine G Hobeika, Professor Virginia.
Transit Signal Priority Applications New Technologies, New Opportunities Peter Koonce, PE APTA BRT Conference – Seattle, WA Wednesday, May 5, 2009 Technology.
MBTA Key Bus Route Improvement Program Joanne Haracz, AICP responsive client solutions since 1976 Pennsylvania Public Transportation Association April.
Waheed Uddin, PhD., P.E. Professor and Director, CAIT Center for Advanced Infrastructure Technology Department of Civil Engineering The University of Mississippi.
Geometry information from Liufang Ave. North in Beijing Green phase (s): 99,77,66,75,60 Dwell time distribution: N (30,9), N (27,7), N (24,6) Maximal bandwidth:
Transit Signal Priority Work Group Report 7/30/13
The INTEGRATION Modeling Framework for Estimating Mobile Source Energy Consumption and Emission Levels Hesham Rakha and Kyoungho Ahn Virginia Tech Transportation.
Transportation Data Palooza Washington, DC May 9, 2013 Steve Mortensen Federal Transit Administration Data for Integrated Corridor Management (ICM) Analysis,
TRAFFIC SIGNAL MANAGEMENT. PURPOSE Purpose: Foster understanding through development of educational outreach materials Illustrate benefits and basic techniques.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
The City of Gdynia City rights in 1926 With Sopot and Gdańsk forms the Tri-City agglomeration It has inhabitants Port city, employment structure:
TRB’s National Cooperative Highway Research Program (NCHRP) Project Guidance on Quantifying Benefits of Traffic Incident Management Strategies 31.
Spring INTRODUCTION There exists a lot of methods used for identifying high risk locations or sites that experience more crashes than one would.
Lec 24, Ch.19: Actuated signals and detectors (Objectives) Learn terminology related to actuated signals Understand why and where actuated signals are.
Advanced Public Transit Systems (APTS) Transit ITS CEE582.
2015 GDOT PowerPoint Title Page
Gainesville Area Traffic Management System. Traffic Management System  In 1984, the original Traffic Signal Master Plan was developed for the Gainesville.
2015 Traffic Signals 101 Topic 7 Field Operations.
2015 Traffic Signals 101 Topic 11 Emergency Vehicle Preemption (EVP) and Railroad (RR) Preemption.
RT-TRACS A daptive Control Algorithms VFC-OPAC Farhad Pooran PB Farradyne Inc. TRB A3A18 Mid-Year Meeting and Adaptive Control Workshop July 12-14, 1998.
15 th TRB Transportation Planning Applications Conference Tuesday, May 19 th, 2015 – Atlantic City, NJ Integrating Travel Demand Models & SHRP2 C11 Tools:
Applied Transportation Analysis ITS Application SCATS.
Evaluating Robustness of Signal Timings for Conditions of Varying Traffic Flows 2013 Mid-Continent Transportation Research Symposium – August 16, 2013.
Reggie Chandra, Ph.D., P.E., PTOE Operation Green Light Manager of Traffic Operations, MARC.
Project 5: Ramp Metering Control in Freeway System Team Members: Faculty Mentor: Isaac Quaye Dr. Heng Wei Junior GRA: Emma Hand Kartheek K. Allam Sophomore.
Intersection Control Evaluation (ICE). Outline  Background  ICE Process  Impacts  Current Status.
TRB Transportation Planning Applications Conference Houston, Texas May 2009 Ann Arbor Transportation Plan Update-- Connecting the Land Use & Transportation.
Intelligent Transportation System (ITS) ISYM 540 Current Topics in Information System Management Anas Hardan.
Transit Signal Prioritization (TSP) and RTS RTS Transit Signal Priority Work Group A Path to Successful Implementation 1 July 16, 2013.
Center for Risk Management of Engineering Systems University of Virginia, Charlottesville 26 Schedule.
USDOT, RITA RITA: Oversight of USDOT’s R&D programs  University Transportation Centers $100M  UTC Consortia $80M  UTC Multimodal R&D $40M  Intelligent.
Accessibility project in Denmark Phase 1 - Collect data, define congestion, establish methods to estimate congestion and the marginal congestion costs.
Transit Priority Strategies for Multiple Routes under Headway-based Operations Shandong University, China & University of Maryland at College Park, USA.
Integration of Transportation System Analyses in Cube Wade L. White, AICP Citilabs Inc.
WORK ZONE SAFETY & MOBILITY Meeting the Federal Rule Jim Allen Safety Implementation Engineer ATSSA Illinois Chapter Meeting.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 16, 2009.
Chapter 20: Actuated Signal Control and Detection
Managed Lanes CE 550: Advanced Highway Design Damion Pregitzer.
Southwest Washington ITS Traffic Data Collection & Analysis: A Tale of 3 Projects Jill MacKay ITE Traffic Simulation Roundtable October 4, 2012.
November 15, 2005 Dr. Robert Bertini Dr. Sue Ahn Using Archived Data to Measure Operational Benefits of a System-wide Adaptive Ramp Metering (SWARM) System.
Connected Vehicle Program – Dynamic Mobility Applications Highlights for Tech Scan Scrum.
Is Transportation Sustainable?. Objectives By the end of this unit, students will be able to: 1.Examine and prioritize transportation project impacts.
September 25, 2013 Greg Davis FHWA Office of Safety Research, Development and Test Overview of V2I Safety Applications.
Transit Signal Priority (TSP). Problem: Transit vehicles are slow Problem: Transit vehicles are effected even more than cars by traffic lights –The number.
Transit Signal Priority (TSP): Deployment Issues and R&D Needs as Identified by Practitioners Hallie Smith Brendon Hemily.
Transportation leadership you can trust. presented to Safety Data Analysis Tools Workshop presented by Krista Jeannotte Cambridge Systematics, Inc. March.
Strategic Highway Research Program 2 Project L07 Identification and Evaluation of the Cost- Effectiveness of Highway Design Features to Reduce Nonrecurrent.
Line 22 BRT: Summary Santa Clara Valley Transportation Authority May 2003.
1 Federal Highway Administration, USDOT The Final Rule on Work Zone Safety and Mobility Updates to 23 CFR Section 630, Subpart J Presented by Tracy Scriba,
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
Use of HITL in Bus Priority Design Kevin Balke, Ph.D., P.E. TransLink ® Research Center Director Texas Transportation Institute Hardware-in-the-Loop Symposium.
Transit Signal Priority: Managing Expectations Kevin N. Balke, Ph.D., P.E TransLink ® Research Center Director Texas Transportation Institute Transportation.
ENERGY AND ENVIRONMENTAL IMPACTS OF ROUTE CHOICE DECISIONS Kyoungho Ahn and Hesham Rakha Virginia Tech Transportation Institute, VPI&SU, Blacksburg, VA.
Abstract The City of Portland, in collaboration with TriMet (Portland’s regional transit service provider) and the Oregon Department of Transportation,
Transportation Research Board Planning Applications Conference, May 2007 Given by: Ronald T. Milam, AICP Contributing Analysts: David Stanek, PE Chris.
Transit Signal Priority: The Importance of AVL Data David T. Crout Tri-County Metropolitan Transportation District of Oregon (TriMet) Presented at Transportation.
05/16/2008 Improved Traffic Signal Efficiency in Rural Areas through the use of Variable Maximum Green Time Aswini Rajagopalan.
SCATS Congestion Improvement Program. The Scope of the SCATS Congestion Improvement Program.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
MOVA Traffic Signal Control Trial
Emergency Vehicle Preemption (EVP) and Railroad (RR) Preemption
Applied Technology and Traffic Analysis Program(ATTAP) MIDCAP & MUID
* Topic 7 Field Operations
Transit Signal Priority: Evolution
Transit Signal Priority: The Importance of AVL Data
Lourens de Beer; Supervisor: Prof. C Venter
Module 6 A 21st Century Transportation Network
Presentation transcript:

Guidelines for the Planning and Deployment of EVP and TSP Presented by: Hesham Rakha Associate Professor, Civil and Environmental Engineering Director, Center for Sustainable Mobility Virginia Tech Transportation Institute

Slide 2H. Rakha Overview What is EVP? Emergency Vehicle Preemption (EVP) entails: –Preempting a traffic signal controller by providing a green phase for an emergency vehicle Conditional on the absence or completion of pedestrian phases May involve either green extension or red truncation Ignores traffic signal coordination requirements (maintaining cycle length)

Slide 3H. Rakha Overview What is TSP? Transit Signal Priority (TSP) entails: –Providing preferential treatment to transit vehicles to facilitate their flow TSP requests may be conditional on: –Absence of a pedestrian phase –Presence of a green interval –Prescribed level of transit vehicle occupancy –Degree of bus lateness –Level of congestion at signalized intersection

Slide 4H. Rakha Planning Institutional Issues Institutional issues include: –Identification of important stakeholders –Assessment of local EVP and TSP needs –Formulation of local EVP and TSP objectives and requirements –Compile a document that provides a structured approach to aid in addressing these institutional issues and local needs

Slide 5H. Rakha Planning Pre-Deployment Impact Analysis Stakeholders should conduct a local impact analysis –Assess the anticipated consequences of alternative EVP and TSP strategies under consideration –Consequences may be the impact on traffic flow and vehicular and pedestrian safety Empirical analyses and the use of microscopic traffic simulation –CORSIM, INTEGRATION, VISSIM, Paramics, & AIMSUN2

Slide 6H. Rakha EVP Evaluations State-of-Art Evaluations EVP can produce significant savings in emergency vehicle travel times –Response times reduced by 14-23% in Denver, Colorado (1978), 50% in Addison, Texas (BRW, 1997), 16-23% in Houston, Texas (Traffic Engineers Inc., 1991)

Slide 7H. Rakha EVP Evaluations State-of-Art Evaluations System-wide impacts: –Increase non-EV vehicle delay by less than 3% along Route 7 (Bullock et al., 1999) –Multiple preemptions result in significant delay increases (Nelson and Bullock, 2000) –Travel time increases decrease from 12.2% over normal travel times after 15 minutes to 3% over normal travel times 60 minutes later (McHale and Collura, 2001)

Slide 8H. Rakha EVP Evaluations State-of-Art Evaluations Between 1994 and 2000: –More than 643 EV crashes involving one or more fatalities nation-wide (USDOT, 2002) EVP can decrease the number and severity of crashes: –70% reduction in accident rate at 285 traffic signals in St. Paul, MN between 1969 and 1976 –Louisell et al. developed a conflict analysis tool to quantify the likelihood of crashes

Slide 9H. Rakha EVP Evaluations State-of-Art Evaluations

Slide 10H. Rakha Transit Priority Evaluations Route 1 Network Configuration US Route 1 arterial in Fairfax, Virginia –8.1 mi over 27 signalized intersections –Total demand of 16,000 veh/peak period –Fixed-time time-of-day signal timings

Slide 11H. Rakha Transit Priority Evaluations Field Evaluation Results The findings of the field evaluation study are summarized as follows: –The study demonstrated that a WAAS-enabled GPS receiver is an effective technology in the evaluation of TSP. –The study found that dwelling times are not affected by TSP operation. –Green-extension TSP may reduce delay to transit vehicles at intersections (3 to 6% reductions but were not statistically significant). The benefits provided by TSP are highly dependent on the level of congestion and can be maximized under moderate-to- low levels of congestion.

Slide 12H. Rakha Transit Priority Evaluations Modeling Evaluation Results TSP has no impact on transit vehicle travel times, system- wide travel times, and side street queues. An increase in Route 1 demand results in increases in system-wide dis-benefits of TSP. –Maximum system-wide increase in delay is minimal (less than 1.37%). An increase in the side-street demand does not result in any statistically significant system-wide disbenefits. An increase in transit vehicle frequency results in reductions in bus delays by up to 3.20%. –No system-wide benefits are observed when TSP is operated. TSP operations are impacted by the location of bus stops: –Near-side bus stops result in a 2.85% increase in delay, –Far-side bus stops result in network-wide delay savings of 1.62%.

Slide 13H. Rakha Transit Priority Evaluations Columbia Pike Network Configuration Columbia Pike arterial in Arlington, Virginia –1.2 mi arterial carrying 26,000 vehicles per day –16 SCOOT and 5 fixed-time intersections N

Slide 14H. Rakha

Slide 15H. Rakha Transit Priority Evaluations Summary Results Impacts on prioritized vehicles: –Delay, stops, fuel consumption, and emission reductions for all strategies considered –No clear impact on travel time variability Impacts on general traffic: –AM peak: Negative impacts due to high congestion at a few intersections –Midday: Negligible negative impacts as a result of spare signal capacity –Increasing negative impacts with increasing number of prioritized buses –Difficult for traffic along prioritized routes to benefit from priority due to differences in traffic and transit behaviors

Slide 16H. Rakha Transit Priority Evaluations Summary Results Effect of adaptive traffic signal control –Transit vehicles: similar benefits under all types of signal control strategies –General traffic: less negative impacts under adaptive control as system is able to automatically adjust to temporary queuing or congestion caused by transit priority No TSPTSP Fixed-time Adaptive

Slide 17H. Rakha TSP General Conclusions Rakha and Zhang (2004) concluded the following: –Generally, TSP provides benefits to transit vehicles that receive priority. –Traffic demand increase results in larger system-wide dis-benefits. –Bus frequency increase results in larger system-wide dis-benefits. –Bus arrivals on heavily congested approaches may result in system-wide benefits if conflicting approaches are not congested. lightly congested approaches may produce significant system- wide dis-benefits if conflicting approaches are heavily congested.

Slide 18H. Rakha TSP General Conclusions –Transit vehicle arrivals during the early phases produce minimum disruptions to the general traffic –The system-wide benefits of TSP are highly dependent on the optimality of the base signal timings. –Transit vehicle dwell times at near-side bus stops can have significant system-wide impacts on the potential benefits of TSP.

Slide 19H. Rakha Implementation Recommendation Economic and Financial EVP and TSP projects may: –Have short life span, lower upfront costs, and higher operating costs than traditional physical infrastructure projects Traditional B/C may not be appropriate: –Multi criteria analysis should be used (Leviakangas and Lahesmaa, 2002).

Slide 20H. Rakha Implementation Recommendation Procurement Identification of system objectives –A clear understanding of the project scope can reduce future misunderstandings RFP preparation –A single integrator should be responsible for the design, procurement of components, system integration, installation, testing, and user training

Slide 21H. Rakha Implementation Recommendation System Installation These systems have 3 major components: –In-vehicle subsystems Emitter, power system, and microprocessor May also include GPS and APC devices –Road-side subsystems Detectors mounted in the vicinity of traffic signals, microprocessors, and communication systems –Center subsystems Contractor should be responsible for quality control of all subsystems

Slide 22H. Rakha References References: –Ahn K., Rakha H., and Collura J. (2006), Evaluation of Green Extension Transit Signal Priority Strategies using Portable GPS Receivers, Transportation Research Board 85th Annual Meeting, Washington D.C., CD-ROM [Paper ]. –Rakha H. and Zhang Y. (2004), Sensitivity Analysis of Transit Signal Priority Impacts on Operation of a Signalized Intersection, Journal of Transportation Engineering, Vol. 130(6), pp –Dion F., Rakha H., and Zhang Y. (2004), Evaluation of Potential Transit Signal Priority Benefits Along a Fixed-Time Signalized Arterial. Journal of Transportation Engineering, Vol. 130(3), May/June, pp –Chang J., Collura J., Dion F., and Rakha H. (2003), Evaluation of Service Reliability Impacts of Traffic Signal Priority Strategies for Bus Transit. Transportation Research Record 1841, pp Electronic documents: