UED ASTA Mechanical Mechanical Design Status Eric Bong 20 May 2014.

Slides:



Advertisements
Similar presentations
PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Advertisements

MICE RF Cavities and RFCC Module Update Derun Li Lawrence Berkeley National Laboratory MICE RF Workshop Daresbury Laboratory, UK April 17, 2012 April 17,
University College London, Optical Science Laboratory bHROS Progress bench-mounted High Resolution Optical Spectrograph bHROS bHROS Progress General.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
EDM Collaboration Meeting, October 5-7, 2006 Valve R&D Steve Williamson UIUC.
Justification  The Observatory Automation project required the Dome Drive System to be remotely operated and provide monitoring capabilities Conduct.
Far Detector Assembly Block Pivot Table Design Review WBS Dave Pushka April 2 nd 2008.
Eric Bong LCLS FAC Injector-Linac October 27, 2005 Injector Design / Diagnostics / Gun & Linac RF Design E. Bong LCLS FAC.
Update on Be Wall Cavity Steve Virostek Lawrence Berkeley National Lab MTA RF Workshop November 15, 2010.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
Eric Bong LCLS FAC Injector-Linac System October 27, 2005 Injector –Linac System Overview E. Bong LCLS FAC October 27, 2005.
D Walters Undulator System June 17, Undulator System Components Status Dean Walters.
Ventricle Chamber Valve Imaging Chamber ECG Machine Aortic Compliance Chamber Buffer Chamber Secondary Compliance Chamber Flow Meter Pressure Sensors DAQ.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Compressor status AWAKE Technical Board meeting 19 May 2015.
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
February 17-18, 2010 R&D ERL James Jamilkowski R&D ERL Controls Larry Hoff James Jamilkowski February 17-18, 2010 Controls.
PEEM III Endstation Design Review
Facility Upgrade Status at SSL, UCB Small Prototype Systems – 33mm Demountable Detector Body Parts arrived, cleaned. – 33mm Demountable Detector Test Flange.
E. Beebe LEBT & Ion Injection EBIS Project Technical Review 1/27/2005 LEBT and External Ion Injection Ed Beebe Preinjector Group Collider-Accelerator Department.
F.E.T.S. Mechanical Engineering Update by P. Savage 13 th August 2008.
CMS Radioactive Source Driver Systems Status and Action Items Paul Debbins University of Iowa October 14, 2005.
COMPRES 2007 Annual Meeting COMPRES Gas Loading System at APS Progress Report June 2007 Mark Rivers.
Bubble Chamber Installation Kick-Off Meeting May 28, 2014, Grames Let’s discuss two jobs between the cryounit and injector gate. Bubble chamber (5D) New.
TITAN EBIT MCP Detector Assembly Cecilia Leung Undergrad summer student 2007 TRIUMF Summer Student Symposium Tuesday, July
CHEDS Experiment Title…… o Experimental Staff and contact information: Example:  Principal Investigator (PI)  Co-PI  Staff Scientist  Post Doc  Graduate.
1 1. Systems and Software Development 1.1 The Systems Life Cycle.
Installation issues - update, July 2006A.Fabich1 MERIT installation: Update July 2006 A.Fabich CERN AB-ATB July 2006.
Compressor status AWAKE Technical Board meeting 19 August 2015.
G5 Beam Instrumentation D. Gassner, E. Pozdeyev 4-09.
27-28 March, CERNFP420m Brainstorming on Mechanics1 FP420m DETECTOR MECHANICS Jaak Lippmaa HIP, Helsinki University Mikk Lippmaa ISSP, Tokyo University.
TM0 components inventory and procurement schedule In LAB testing facility A. Bartalesi.
TCLDA Design status Collimation Upgrade Specification Meeting L. GENTINI.
Spectrometer Solenoid – Quench Analysis The LBNL version of the quench model has been further refined - Heng Pan is finishing various quench scenarios.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
MICE RF Cavities and RFCC Module Update Allan DeMello and Derun Li Lawrence Berkeley National Laboratory MICE CM32 at RAL, UK February 9, 2012 February.
Pascal’s Principle: More Practice. Fluid Systems: Student Success Criteria I can describe common components used in hydraulic and pneumatic systems.
1 Status of Vacuum Process Facilities at SSL 16 October 2009 Sharon R Jelinsky Space Sciences Laboratory, UC Berkeley.
Christoph Gabor, ASTeC HIPPI—Meeting (WP 5) 26 th – 28 th September 2007 Non—destructive transverse emittance measurement device The Front End Test Stand.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
ASTA Accelerator Directorate Review Project Plan and ES&H Carsten Hast May 20, 2014.
Modify Existing Scanning Electron Microscope (SEM) SEM FE Probe Surface Science Study L. Laurent, S. Tantawi, R. Kirby *This research is funded by the.
Summary of RIKEN visit. Chamber Top plate Bottom plate Middle cylinder.
7/06/20111 Linac4 Ion Source Review Design and production D. Steyaert – G. Favre Linac4 Ion Source Review Design and Production New LINAC4 Front end Chamber.
Ch. Vuitton – BE/BI Presented by R. Veness – BE/BI 18th October
Experimental Setup and FEL Interface Will Williams and Zheng-Tian Lu Argonne National Lab.
BPM for Spectromety development status A. Lyapin.
Beam Wire Scanner for PS/SPS/PSB Current status and Schedule Dmitry Gudkov BE-BI-ML.
Feedthroughs & HV supplies Sven Vahsen 4/1/2015. HV supplies: quotes KV CAEN HV supplies are to pricey (~$25k for 8 channels of 15kV) So, I want.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
Design for a New Optical Table of the Shintake Monitor Takashi Yamanaka The University of Tokyo ATF2 weekly meeting 2007/9/26.
Linac4 BCC 14/10/2010 Linac4 Measurement and Dump Lines BCC on the Linac4 Transfer Line Status.
RFCC Engineering Status and Plans Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Meeting March 6, 2012 March 6, 2012.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
1 SLAC RC Status Report 19 July 2010 LHC Collimation Working Group Meeting Jeff Smith/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 Vacuum Components Undulator System SH Lee, J Morgan, and D Walters.
IRC 2009 OVERALL. SITE PLAN PROPERTY LINES LOCATION OF BUILDING GRADES STREETS.
IT 210 Week 2 Individual Application-Level Requirements To purchase this material link
Introduction to hydraulics
Design of the Injection Can
Production and commissioning of the 2nd BGC
TM0s and TM1 components inventory and procurement schedule
X-ray Pump-Probe Instrument
PBC Method Flat Mirror Gas Mixture Dielectric Mirror Pump Window PM
XFEL Collimation and Beam Switchyard Vacuum Issues
XFEL Bunch Compressor BC1 and BC2 Vacuum Issues
Motion Control on ESS Test Beam Line
Computer-Aided Design (CAD)
Presentation transcript:

UED ASTA Mechanical Mechanical Design Status Eric Bong 20 May 2014

UED ASTA Layout 3D Solid Model CAD Layout

UED ASTA Lab Components Floor Girder Plates Detectors Experiment Chamber Diagnostic Chamber Differential Pumping Chamber Laser Tables

UED ASTA Component Postions

UED Experiment Chamber

UED Experiment Chamber Detail Quote Received From Vendor Purchasing Process Initiated Delivery 8 Weeks ARO

UED Diagnostics and Differential Pumping Chambers Commercial pneumatic pop-in actuator for phosphor screen & faraday cup Commercial motorized linear actuator for multi- hole collimator Choke-gasket brazement on input and output flanges limits conductance for differential pumping

UED Mechanical To Do List Place Experiment Chamber Order (In Process) Order Exp Chbr Turbo, Laser Windows & Electrical Feed-throughs Detail Exp Chbr Support Plates, Elbow and Fabricate Release Girder Floor Plate Drawings and Fabricate Order Diagnostic Crosses & Bellows (Already Have Actuators) Design Multi-Hole Collimator Flag Design Diagnostic Cross Support Adapt Existing Phosphor-Screen/Faraday-Cup Design to Actuator Detail Differential Pumping Chamber Choke & Fabricate Modify BNL Detector Design to Use Standard Crosses & COTS Actuators Already Have Mirrors & Actuators Layout Inside of Experiment Chamber Thanks to Margery Morse Mechanical Modeling & Design