CVE 4070 Construction Engineering Shop Drawings Quality Control

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

Construction Contracting
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Project Planning: Assembling a Mortenson “Integrated Work Plan”
Construction Cost Estimating Class #2: Contract Documents Prof. Ralph V. Locurcio, PE.
DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
SUBMITTALS PROCESSING Fall 2008 ARCH 330
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Construction Cost Estimating Class #2: Bidding Process Prof. Ralph V. Locurcio, PE.
“TI” Ohhhh….. (TIO) (No TIO is not a person!) What is it all about?
14.21 Contract Closeout Procedure Update Notice of Completion, Release of Retention and Punchlist Resolution December 8, 2005.
DPW General Conditions Articles 32 through 37. Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate.
CTC-470 Construction Administration Project Management Concepts.
Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL W912DY-08-D-0020 TO 0012 Pre Construction Meeting Pre Construction Meeting.
ARCH 330 Contract Documents to Specifications. Contract Documents: Are defined as the legally enforceable requirements that become part of the contract.
Project Startup Hmwk Due 10/11/ # 1,3,7,8 8.9 #1 9.7 #1,3,4,5, #1,2,3,4,10.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
Project Close Out CTC-470.
Conditions of the Contract for Construction
ESTIMATING By Laith Jacob.
Construction Engineering 221 Drawings and Specifications.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Design & Layout of Foodservice Facilities
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
Construction: Legal Issues. Legal Issues In the Bidding Process Timing of various activities has legal implications. During the bidding process: –A bid.
Standards of Practice Course
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.
CVE 4070 Construction Engineering Test-2 & Review Prof. Ralph V. Locurcio, PE.
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
1 RMS Training RMS BASICS May Before you start RMS Six basic steps to success: 1.Establish offices (enter descriptions of offices) 2.Enter staff.
CVE 4070 Construction Engineering Contract Documents Prof. Ralph V. Locurcio, PE.
Construction Materials and Workmanship. All workmanship, materials, equipment, and articles incorporated into the work are to be of the best available.
CON 2001-CVE 4070 Construction Engineering Project Organization & Stakeholders Prof. Ralph V. Locurcio, PE.
CVE 4070 Construction Engineering Value Engineering Prof. Ralph V. Locurcio, PE.
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
CONSTRUCTION ADMINISTRATION Measurement and Payment Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
1 RMS Training RMS BASICS April Before you start RMS Six basic steps to success: 1.Establish offices (enter descriptions of offices) 2.Enter staff.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
CVE 4070 Construction Methods & Engineering Preconstruction Operations Resume Information Prof. Ralph V. Locurcio, PE.
Chapter 13 Project Management. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Define and give.
Agency Construction Management :CM NOT AT-RISK
11/24/20151 CVE 5074 Leading Construction Operations Team Leadership Part VII – Ethics & Quality.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
Submittals. Submittals key to quality management of project Document or product turned in by construction team to verify that what they plan to purchase,
CON 2001 CVE 4070 Construction Methods/Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
CVE 4070 Construction Engineering Quality Control Value Engineering
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
CVE 4070 Construction Engineering Course Review Prof. Ralph V. Locurcio, PE.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
CVE 4070 Construction Engineering Project Budget & Cost Control Prof. Ralph V. Locurcio, PE.
Project Management Requirements Prof. Ralph Locurcio, PE Dr. Troy Nguyen, PE.
1 RMS Training RMS BASICS July Before you start RMS Six basic steps to success: 1.Establish offices (enter descriptions of offices) 2.Enter staff.
CVE 4070 Construction Engineering HW #6 review Test-2 & Review Prof. Ralph V. Locurcio, PE.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Commissioning HVAC Systems: Lessons learned throughout
Managing Quality with Quality Through the Construction Management Leadership Manual Presented by: Aleksandr Sergek, PE, PMP Allison Justiniano, LEED AP.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
Constructing Recreation Facilities 8 chapter. Groundbreaking Before the construction begins, a groundbreaking ceremony is often held in recognition of.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
Construction Documents
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Quality Management Systems – Requirements
Designers’ Manual Overview and Chapter Contents
CVE 4070 Construction Engineering Class #9: Project Tour
Directed Change Constructive Change
Construction Management Services April 16, 2018
Presentation transcript:

CVE 4070 Construction Engineering Shop Drawings Quality Control Habitat Build Prof. Ralph V. Locurcio, PE

Schedule update

Project Delivery Process… We are here

Project Organization…

Contract Documents… The Agreement or Contract The Specifications The Drawings Important Note: Unless otherwise specified this list is the “order of precedence” of the contract documents

Drawings in standard set… Title Sheet Index Sheet Architectural (A) Civil & site utilities (C) Structural (S) Mechanical (M) Plumbing (P) Electrical (E) Fire protection (FP) Finish schedules As-built/record drawings

The Specifications… Define the “qualitative” requirements of the project that is to be built. Provide a detailed description of the performance features of all components of the project. Describe the nature of the materials and the workmanship & procedures to be followed in constructing the project. Include those aspects of assembly or construction that affect the performance of the components.

The Drawings or Plans… Define the “geometry” of the project and all of it’s components. Include the general form, dimensions and details of all project features that are to be fabricated on site. Show the relationship of all components to each other. May include details, notes and instructions that amplify the specifications.

Specs in Contract Admin… Drawings are never 100%… Drawings show “typical” conditions Field measurements required Do not cover means & methods Need to detail “actual” materials to be used Need to detail “installation” procedures PM must evaluate & respond Requires considerable judgment & experience Shop Drawings fill these voids

Materials used in the contract… AE obligation to ensure that materials & products conform to those specified. Owner may claim negligence if don’t conform Care must be exercised in accepting “alternatives” Be especially aware of new or non-standard materials Builder constantly seeking lowest market price for “acceptable” materials & methods Must prove that all materials used meet spec Must obtain owner’s (representative) approval to substitute May not submit alternatives during bidding process

Shop Drawings & Samples… Function of Shop Drawings Link between design & construction Show details of fabrication, assembly & installation Allow introduction of commercially tested products Show method of accomplishing “special” requirements Contracts usually require approval prior to ordering Approval of Shop Drawings Contract SPs usually specify list of shop drawings Builder must submit schedule of submissions Owner must “approve” submittals for conformance to specs Builder responsible for accuracy, methods & quality Misuse of Shop Drawings May not change requirements or design intent Builder’s responsibility to conform, even if missed by AE/Owner review

Examples of shop drawings Drawings for mechanical, electrical and plumbing components. Ductwork fabrication drawings. Drawings for HVAC piping. Drawings of air handling units. Steel and sheet metal shop drawings. CAD shop drawings. Architectural woodworking shop drawings. Cabinet shop drawings.

Example of Shop Drawings-1

Example of Shop Drawings-2

Example of Shop Drawings-3

Example of Shop Drawings-4

Example of Shop Drawings-5

Example of Shop Drawings-6

Submittal Review… Include: shop drawings, samples, test results, certifications, criteria & standards List is prepared by designer Approval by owner’s rep – verify conformance & suitability Timing of approval is essential Special attention: blasting, excavation, compaction, water control, pile driving, hazmat, cranes

Submittal Review Process…

Dealings with subcontractors… Concept of “one-to-one” authority PM/CM deals solely with the General Contractor. General Contractor is responsible to hire subcontractors Selection includes evaluation of the subcontractor’s competence Responsibility includes all acts & omissions of any sub General Contractor must have effective contracts, admin procedures & management Architect, Owner & PM not responsible for how the Builder subcontracts the work Contractor is responsible for subcontracts

One-to-One authority… PM CM

One-to-One authority…

Part II – Specifications & Administration of Quality

Management of Quality… Definition of Quality Control Definition of Quality Assurance Designer’s responsibility Contractor’s responsibility

Project Organization…

Quality Control Process… Must have a Quality Control Plan… a routine system & schedule of inspections Special considerations: Timing of inspections; preclude delays Protection of work in place Most work is irreversible; i.e.. concrete, foundations Logistical sequencing Follow plans & specifications; changes not authorized Report and correct errors & deviations from spec; documents Three phased inspections system Preparatory inspection Pre-inspection Final inspection QC Staff must be qualified, trained & dedicated

Construction Inspections Three phased inspection system Preparatory inspection – meeting Pre-inspection – on site; prior to construction Final inspection – after completion

Quality Control & Assurance… Quality control vs. quality assurance Inspection & Testing manual Policy matters that govern acceptance Inspection procedures Technical checklists List of testing for materials & equipment Work flow diagrams Required on government contracts

Stopping the work… Work is defective… Unsafe conditions… Owner’s right to stop work that is defective Contract provisions govern Communicate in writing Contractor may dispute Unsafe conditions… Risk of death or serious injury Obligation of Owner’s rep and Builder Follow verbal order with written order Risk of stopping work… Cost incurred for labor & materials Schedule slippage might incur damages Work must be torn out and rebuilt

Project Organization…

End of Part I

Habitat for Humanity Build Organize into teams of 5-10 students Build dates are Wed thru Sat Starting Sept 16 Work on site 800am to 300pm Complete report on construction work I will schedule your build date

Habitat Location

Habitat Project Report Review plans & specs Materials being used Equipment being used Team organization Who is PM Who is superintendent Tasks assigned to each team member Weather conditions Training involved Problems encountered & solved

Alternative = PM case study Read PM case study assigned Write report on case study: Type of construction Materials used Team organization How scheduled Budget controls Problems encountered; how resolved Special techniques used

Scope of tour… Meet key officials Discussion items Construction project manager Resident Engineer Discussion items Individual responsibilities Type of contract used on this job Organization for control of time & cost Coordination of subcontractors Training for this job Degree of experience needed Control of quality

Construction operations… Observe construction progress – homework Turn in at class on 9/17/2007 Homework items Organization & scheduling of work Purchase & flow of materials Use of subcontractors Integration of subcontractors work Workmanship and quality control Problems encountered Correction of deficiencies Safety

That’s it for today…

Going forward… Sept 16… Project tour cancelled Sept 16… Disaster Recovery & Study guide ALL ATTEND ON TUESDAY Class held in 500 OLS – Room 130 Sept 18… Test #1–The Basics–working on a room Sept 23… Begin section on “tools” Project Scheduling Project Budgets Payments Quality Changes Claims

Sep 14 – Construction Tour

Project Tour: Tue Sept 14… Before: 1. Meet at parking lot @ 5:00pm 3. Pick up construction tour homework sheet. 4. Ask questions during the tour to get info you need. 5. No open toe shoes or shorts After: 1. Return to parking lot @ 6:00pm. 3. Tour homework sheet is due @ next class. 4. Next class at regular time & place.