Update on tendering for HIC automatic assembly system A. Di Mauro ITS Upgrade Plenary, 01.09.2014.

Slides:



Advertisements
Similar presentations
A Company Overview. Who are KG Enterprises Specialising in Logistics Review – Process Re-engineering – Sub-contract selection & management – Working within.
Advertisements

CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe.
Copyright Kenneth M. Chipps Ph.D.
Electronic Systems Support LV PS Procurement - Status February 28, 2005.
Chapter 3 Project Initiation
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
ICASAS305A Provide Advice to Clients
Project Clarification: Objectives Tree BE 20–Engineering Design with Computer Applications Week 4: 15-September-2004.
Market Validation.
MFT Progress Report Ginés Martínez García for the MFT project ALICE mini-week, Sep 1 st -5 th 2014.
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
IB stave assembly A. Di Mauro, C. Gargiulo, J. Van Beelen ITS-MFT mini-week
Automated HIC assembly A. Di Mauro ITS-MFT mini-week
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
The Lean Sourcing Process
EE x12 Technical Reports Writing Lecture 7
ASPERA-3 Sep. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 9_25/ Page 1 Monthly Status Report Report due 9/25/00 Schedule statused.
ITEC224 Database Programming
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
Hybrid Integrated Circuit
1 © Quality House QUALITY HOUSE The best testing partner in Bulgaria.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Developments concerning the Community Plant Variety Office of the European Union (CPVO) online application system Meeting on the development of a prototype.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
Status of procurement of Module Assembly Machines A. Di Mauro (CERN) 5th ITS, MFT and O2 upgrade Asian workshop, Wuhan,
Antoine JUNIQUE, Gabriele FIORENZA, Satoshi YANO 1 Laser soldering test 11/03/2014.
Test station for ALICE pixel chip Confidential Information COMMENT by Y. Kwon Strategy : make sure commitment can be achieved before main commitment to.
1 Tungsten supply and assembly, test beam setup Market survey on tungsten supply Ideas on the frame design Experimental area Test beam setup Wolfgang Klempt/
CERN Workshop upgrade Rui De Oliveira KOBE WG6 WG6 9/1/20111Rui De Oliveira.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
WP6 meeting 30/07/2013. Status of flex prototypes production New laser soldering tests Discussion on mass production schedule.
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 StaveMarco Kraan Paul Kuijer.
Task AR-07-03: Global Geodetic Reference Frames Report to ADC-4 prepared by Hans-Peter Plag (IAG/GGOS) Nevada Bureau of Mines and Geology and Seismological.
WP6 status report A. Di Mauro (CERN) ITS plenary meeting
Sensor design and mass test system development Y. Kwon (Yonsei Univ.)
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
T. KurtykaLinac4 meeting 12 March 2009 Guidelines from the sLHC Specification Committee 1). sLHC Specification Committee 2). Schedule of tenders for Linac4.
Testing and Evaluating Software Solutions Introduction.
Probe card preparation Y. Kwon (Yonsei Univ.) for EQENG, Notice, & Yonsei.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Personalised Training Systems Marketing and Sales Consultants.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
A. Faus-Golfe, J.V. Civera, C. Blanch and J.J. García-Garrigós whit the help of the CTF3 Collaboration 1 CTF3 meeting Jan-09.
TE-MPE-EM: Subcontracting Raphaël Berberat
WP7&8 Progress Report ITS Plenary meeting, 10 June 2014 LG, PK, VM, JR.
Chip soldering for ALICE ITS upgrade Xiangming Sun Gangjie Wang.
VEA’s proposal of automated assembly system WP6 meeting, 16/01/14.
Chip design and mass test system development Y. Kwon (Yonsei Univ.)
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
COR1000 Telecoms Project UK Link Committee Update May 2013.
JRA1 Meeting – 09/02/ Software Configuration Management and Integration EGEE is proposed as a project funded by the European Union under contract.
Timo Unger Background & Functionality IMDS Analytics.
PROCUREMENT RULES FOR EXPERIMENTS AT CERN Dante Gregorio CERN Procurement Service.
Padova, 10 Febbraio 2014 ALICE ITS Upgrade Visita Referee - Sezione di Padova.
Automatic Test Equipment Development with C-ON Seo Dong Gon Yonsei University.
Switcher (SWB) bumping
Software Configuration Management (SCM)
Sector 002 Assembly status report
MicroMegas Mechanical Meeting --- Cern April 2014
The Lean Sourcing Process
Change Assurance Dashboard
Codification of Flip Chip Knowledge
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Steering Committee, Eurostat, Luxembourg, 4 February 2011
Water Directors’ Meeting Working Group D (Reporting) activities
Item 9 Validation in UOE data collection
Presentation transcript:

Update on tendering for HIC automatic assembly system A. Di Mauro ITS Upgrade Plenary,

01/09/20142 Market survey outcome 7 out of the 19 invited companies replied to the MS: HACKER (DE)PACTECH (DE)UNITECHNOLOGIES (CH)VEA (IT) – BAUMANN (DE), HACKER (DE), INFOTECH (CH), PACTECH (DE), UNITECHNOLOGIES (CH), VEA (IT), VECTA (FR) 5 additional companies replied spontaneously: – DEMCON (NL), IBS (NL), NEITRACO (NL), SCOTLAND EL. (UK), SETTELS SAVANIJE (NL) Analysis of replies in progress: – the majority of companies has provided the required information in Technical Questionnaire – 6 can be considered qualified for the tendering – the other 6 have been contacted for clarifications (missing or wrong information, missing references of similar supplies) HIC automatic assembly green (in green : known companies)

Status of Technical Specifications The document with technical specifications is in preparation, MFT has been included since they will use one of the machines for their HICs Most relevant points for the baseline system: – The ITS Upgrade project will supply the laser head, the work tables (plate with vacuum chuck for chips, soldering mask and lid for vacuum) for IB, OB and MFT, the soldering balls transfer tools (multi- and single-ball), needle probe card system. – Assembly sequence: 1.Automatic chips placement in nominal positions wrt to an external reference on the vacuum chuck with an accuracy of ± 5 µm 2.Manual placement of FPC and soldering mask by the operator in nominal positions defined by locating pinholes, check of alignment between holes and pads by the operator 3.Manual placement of soldering balls using our transfer tools; check by automatic vision system and manual correction of faults using the single-ball tool 4.Manual tightening of lid and vacuum start 5.When P ~ 2x10 -1 mbar, the laser soldering is started by the operator and each interconnection is performed automatically performed in sequence (tolerance on laser positioning of ± 10 µm) – Quality assurance tasks for the vision system: 1.Chips integrity 2.Soldering joints (2D and 3D, data to be processed by us) 3.Metrology of assembled HIC (measurement of chips position using openings on FPC corresponding to markers on chips) – Electrical test of chips using the needle probe card supplied by us (function implemented only in two machines). 01/09/20143HIC automatic assembly

Status of Technical Specifications Options for alternative system: A.Manual chip placement by an operator using a joystick-like control of moving stages and camera assistance. Solution proposed by a company as possible mean of cost reduction since the time constraints are not very tight wrt usual capabilities of automatic assembly systems. Possible issue with homogeneity and quality of distributed production. B.Automatic placement of soldering balls using a system proposed by the bidder. Summary of various required quotations: 1.Baseline system: 1 prototype (CERN) + between 3 and 6 machines for distributed production* 2.Cost for implementation of chips testing with probe card in two machines 3.System with option A (1 proto + 3 to 6 machines) 4.Cost for option B 01/09/20144HIC automatic assembly (* potential sites: China, France, Italy, Netherlands, South Korea, UK, USA; final number decided on the basis of cost)

Timeline Market Survey: clarify all issues and contact reference clients for “doubtful” companies within Sept 10 Tendering: finalize technical Technical Specifications by Sept 3 Meeting with tendering committee after ~ 1 week to validate company selections and Tech. Specs. Send Invitation to Tender on Sept 15 01/09/20145HIC automatic assembly