Professional Project Management Service “Bringing It All Together”  The Project Manager is responsible for the overall planning and installation of Qwest.

Slides:



Advertisements
Similar presentations
Wireless Phase 1 Solutions
Advertisements

OUT-OF-BAND SIGNALING
Number Resource Optimization Working Group Report to NANC May 23, 2000 Brian Baldwin, Ameritech Beth ODonnell, Cox Communications Eleanor Willis-Camara,
PANI IMG Report to NANC February 13, 2007 pANI IMG Co-Chairs Don Gray – Martin Hakimdin Natalie McNamer – Bill Shaughnessy.
Copyright : Hi Tech Criminal Justice, Raymond E. Foster Police Technology Police Technology Chapter Seven Police Technology Communications Dispatch.
911 services: wireline, wireless and VoIP
Mobile Number Portability
Digital Circuit Switches CET 533. Communication Systems It is all about interfacing Point-to-point is not efficient Communication networks Sharing resources.
The current System Landline caller The emergency call process starts with a caller dialing (highly simplified) © 2011 Colorado Resource.
E9-1-1 Call Flow Wireline/Wireless/VoIP Andy Nielsen California Emergency Communications Office 05/06/2008.
Next Generation Emergency Services Christian Militeau Intrado,Inc. March 21, 2006.
1 LOCAL NETWORK SERVICES... Lead with Local 06/14/ Selective Routing Denver / Colorado.
What is voice over IP The future of Voice over IP How Voice over IP will affect 911 calls How Voice over IP can be used to assist the 911 Dispatch Centers.
What’s Going on Behind Wireless Public Safety Solutions WELCOME!
9-1-1 and VoIP Where are you calling from? InfraGard Conference April 2, 2008 InfraGard Conference April 2, 2008.
Confidential and proprietary material for authorized Verizon Wireless personnel only. Use, disclosure or distribution of this material is not permitted.
The Ultimate Redundancy System for Voice and Data Communications Land and Air ™
All rights reserved © 2005, Alcatel TR XXX Telecommunications Industry AssociationTR
Scheduling in Wireless Systems. 2 CDMA2000: Overall Architecture Mobile Station.
Signaling System 7 Slide 1 Presenter: Bob Wright Signaling System 7 1. PSTN and TDM 2. SS7 State of the Technology 3. Future Trends in Signaling and Networks.
© 2009 Pearson Education, Inc. Publishing as Prentice Hall 6-1 Raymond Panko’s Business Data Networks and Telecommunications, 7th edition May only be used.
Qwest E Private Switch / Automatic Location
ANGEN UPDATE ANGEN Gulf Coast Conference1.
ANGEN Update 2013 Gulf Coast Conference John R. Ellison - ANGEN Consultant Alabama Board.
ANGEN UPDATE GC911 Conference - October John Ellison, Contractor – Alabama Board.
Alabama Next Generation Emergency Network
NENA’s 11 th Annual Technical Development Conference A proposal to support E911 calls on Voice over IP Networks Martin Dawson – Nortel Networks.
911 services: wireline, wireless and VoIP Prof. Henning Schulzrinne Dept. of Computer Science Columbia University, New York FCC Solutions Summit March.
E9-1-1 Presentation for. Glenn A. Roach, ENP VP – Services.
North American Emergency Services Brian Rosen Emergicom.
 The missing parts in the picture are the interactions between the PCS network and the PSTN.  This section briefly describes how mobile roaming is managed.
 The GSM network is divided into two systems. each of these systems are comprised of a number of functional units which are individual components of the.
Jason Horning, ENP NDACo 6/3/2015 Next Generation Update.
North American Emergency Services Brian Rosen Emergicom.
ANGEN Alabama Next Generation Emergency Network Roger D. Wilson Chairman, Wireless Board Alabama Next Generation Emergency Network.
Alabama Next Generation Emergency Network 2012 Alabama Gulf Coast Conference John Ellison, Contractor, CAT - AUM.
CS 479R Telecommunications
California SMS Text-to SMS Text-to Pilots Pilots in four locations in California Began testing in November 2013 All pilots tested by end.
TDC 461: Basic Telecommunications DePaul University 9 April, 2001 LoriLee M. Sadler.
AITech’s UC Voice Technology for FISPA CLECs and ISPs Welcome to FISPALIVE Atlanta 2014.
Gary D. Brown, Guest Lecturer
Figure 4-1 ADPCM (adaptive differential pulse code modulation) Difference.
Telecom Terms and Concepts Introduction to terms.
Alabama Next Generation Emergency Network AAND Meeting – December 10, 2009 John Ellison, Executive Director, Shelby County
Mobile Communication Common Channel Signaling System No. 7 (i.e., SS7 or C7) is a global standard for telecommunications defined by the International Telecommunication.
TELEPHONE NETWORK Telephone networks use circuit switching. The telephone network had its beginnings in the late 1800s. The entire network, which is referred.
Alabama Next Generation Emergency Network Alabama Chapter of NENA – April 22, 2010.
WIRELESS Who Called WIRELESS PHASE 0 Voice only no location information PHASE I Call Back number of cell phone Carrier name Cell site.
Non-Mobile Wireless and Broadband Connectivity for Work Group (NMW-BBC WG) RICHARD MUSCAT DIRECTOR OF REGULATORY AFFAIRS BEXAR METRO NETWORK.
Telephone Network & Signaling System. 8.2 Telephone Network Major Components LATAs Making a Connection Analog Services Digital Services A Brief History.
Chap 5. IS-41 Network Signaling
Click to edit Master title style Click to edit Master subtitle style Intrado © 2005 V9-1-1 Building a Foundation Matt Wilson 1/1/2006.
California 3 rd Party SaaS Enhanced 911 Presented By Theresa Stockton & Kevin Kito 911 ETC, Inc.
Union Tandem Qwest Tandem Union Wireless Switch Legend Existing Connections Union ILEC Switch Meet Point PSTN CURRENT NETWORK CONFIGURATION TRAFFIC FLOW.
Unit-4 Telephone system
October 4-7, 2004 Los Angeles, CA E9-1-1 In a VoIP World Timothy Lorello SVP, Chief Marketing Officer TeleCommunication Systems (TCS) (410)
Elko County E9-1-1 Project Visual Presentation - Final February 1, 2016 Elko Central Dispatch Administrative Authority Project Mission: To provide the.
Introduction to Information Networks COMT 625 Hans Kruse.
ENP Study Group “Wireless-VOIP”
Technical Standards: Paving the Way to NG9-1-1
Internet Telephony (VoIP)
Circuit Switching and Telephone Network
ENP Study Group “Wireless-VOIP”
Chapter 4 North American Intersystem Operations
Issues with Your D-Link Router; Call D-Link Router Customer Support Number
Lecture 5: TELEPHONE NETWORK
Lecture 5: TELEPHONE NETWORK.
Lecture 3: TELEPHONE NETWORK.
Chapter 6 – Circuit-switching systems and networks
Chapter 2 – Networks and how they link
Presentation transcript:

Professional Project Management Service “Bringing It All Together”  The Project Manager is responsible for the overall planning and installation of Qwest products and services.  The Project Manager’s goal is to make a valued difference for the customer. 4Single Point of Contact 4Focal Point within Qwest 4Manage all Project Tasks and Resources 4Monitor Progress 4Provide a Clear Picture of Project Status

 SS7 Conversion  E9-1-1 Network Build Out  Wireless E9-1-1 Launch North Dakota Association of Counties Project

SS7 Conversion  Install SS7 Software at Fargo and Bismarck Tandem Switching Centers  Redesign Approximately 260 Circuits for SS7 Operation (convert from MF Signaling)  Cutover and Test During Maintenance Window 3Local Exchange Company (LEC) Qwest 30% requiring component changes, scheduled for cut over in mid April 3Independent Local Exchange Company (ILEC) 3Competitive Local Exchange Carrier (CLEC)

9-1-1 Wireless E9-1-1 Network ESRK P ublic S afety A nswering P osition Data Links. Data Connection from PSAP Controller to ALI data base ( 2 per PSAP). Qwest Selective Router CAMA Trunks. Trunks assigned to a DS1 Facility. ESRK + MIN ESRK + Voice Cell Site + MIN ESRK ALI ESRK + Voice EM Trunks. PSAP Voice Trunks. LEGEND MSC - Mobile Switching Center SCP - Service Control Point ALI - Automatic Location Identifier ANI - Automatic Number Identification MIN - Mobile Identification Number ESRK - Routing ANI (AKA) pANI Intrado ALI Host MSC SCP Call Sequence 1) Cell phone dials )MSC sends cell site, sector, and MIN to SCP 3)SCP assigns an ESRK and sends to MSC 4)MSC sends voice and ESRK to Selective Router 5)Selective Router determines PSAP and sends ESRK and voice; at the same time, SCP delivers MIN, cell site, sector, and ESRK to ALI host 6)PSAP controller requests ALI bid with ESRK received from Selective Router 7)ALI record delivered to PSAP

E9-1-1 Network Build Out

Wireless E9-1-1 Introduction  Cell Site Coverage Information Provided to Intrado (Wireless Carriers)  Phase I Location Information Display Determined (PSAP’s)  Routing Recommendations Made (PSAP’s)  Network Recommendations Made (Intrado)  MSC CAMA Trunk Service Orders Placed and Provisioned  E9-1-1 Database Created with Routing Instructions and “Shell” Records  Operational Testing and “Live” Call Handling