January 26, 2012. Key Themes from User Groups 01.16.12.

Slides:



Advertisements
Similar presentations
AGENDA – PUBLIC FORUM July 9, Welcome and backgroundRod Lehnertz 2.Flood Task Force UpdateGregg Oden 3.Site Selection StudiesJoe Hibbard 4.Public.
Advertisements

Employee Council Meeting January 2012 Office of the Architect.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 18, 2011 EDUCATE ENGAGE EMPOWER 1.
Friday, May 21, 2010 v1.0 Bendigo Campus: Masterplan Summary La Trobe University La Trobe University Masterplan Summary Bendigo Campus.
University of Connecticut-Stamford Campus Safety Orientation
FACILITY PLANNING October 1, :00 PM – Raymond School Tour 6:30 PM – Interactive Workshop Raymond Community Workshop.
Campus Master Plan Update University of Colorado at Boulder.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District August 8, 2011 EDUCATE  ENGAGE  EMPOWER 1.
NEW MERCY CENTER. Dramatic 35 foot tall Bright Silver Building entrance cross. Recognition by custom engraved plaque. This Cross will be up lit at night.
Building Plan Presentation The Evangelical Lutheran Church of The Holy Trinity.
RENOVATION & ADDITION OPTIONS TORONTO DISTRICT SCHOOL BOARD NORTH TORONTO COLLEGIATE INSTITUTE REDEVELOPMENT STUDY.
Center Grove High School Addition & Remodeling Schematic Design Phase Faculty Presentation August 27, 2008.
Elements of Expansion Boston Convention & Exhibition Center Presented by Howard Davis, MCCA February 22, 2010.
AGENDA – PUBLIC FORUM October 12, Welcome and Background – Rod Lehnertz 2.Site Evaluation Progress Report – Joe Hibbard 3.Public Discussion 4.Closing.
City of Scottsdale Senior Center at Granite Reef
Institutional Services Human Resources Facilities Maintenance Custodian Services Security Construction Wilmington Campus North Campus.
SCHEMATIC DESIGN PRESENTATION
CHARLESTON GAILLARD CENTER ARTS PRECINCT ARTS PRECINCT … designed to bring the arts into the public realm by creating a civic destination for.
Capital Financial Plan and Physical Design Framework DRAFT Committee on Grounds and Buildings May 2010.
What is a master plan? Creates the long-term vision for the University’s land and physical resources. Lays foundation for development plan, but is not.
1 UAS Campus Masterplan December 2012 Draft. 2 PRIOR WORK - INPUTS –UAS Masterplan 2009 – Accreditation Review 2010 – UAS Strategic & Assessment.
St. Ambrose University Main Campus Planned Institutional District Application December 15, 2011.
University of Minnesota Molecular & Cellular Biology Building June 1999 PROJECT DESCRIPTION l Molecular & Cellular Biology Building (MCBB) for 70 principal.
GEOG 442 Day 19: Commercial and Retail Analysis, and Community Facilities.
Fullerton College Physical Education Project Community Meeting March 11, 2009.
Land Use Study for the Community of Winchester May 21, 2012.
Urban Design Goals: Produce a high quality living environment for all residents. Clarify and enhance the relationship between new housing development and.
Cycle Path Diversion Strategy Catford Stadium Barratt London Aldgate Author P.Willisr.
Riverside Overpass Master Planning Presenters: Sally Swanson & Magdy Abdalla June 11, SALLY SWANSON ARCHITECTS, INC. Riverside Elementary School.
Shireen Abdelrahman Lecture 5. Individual development projects - new construction, expansion, or renovation - can affect the surrounding environment in.
Title Slide. Preliminary Conceptual Development Workshop Integrate sustainable design into new buildings and reduce carbon footprint Create more flexible.
Planning & Community Development Department Hillsides Residential Care and Educational Center Master Plan City Council July 20, 2015.
Jan 31, 2005 Community Update. Jan 31, 2005 Thanks to the voters… Measure R passed with over 63% of the vote $3.87 billion for “the Safe and Healthy Neighborhood.
GROUP MEMBERS: Ramos Ivett # Lugo Valmore #
Safety Aspects of the Disability Empowerment Center.
Building Plans.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
A presentation of The New Georgian Heights Alternative Elementary School for Columbus City Schools Board of Education 2 February 2010.
ENERGY EFFICIENT HOUSE DESIGN UDC, Van Ness Campus Student Architects: Sarah Alexander and Roberto Martin.
1 SCS Building Committee. 2 The SCS Building Committee Members: Guy Blelloch Randy Bryant Sharon Burks Peter Lee Jim Skees Manuela Veloso.
Casey Middle School Boulder, Colorado Middle School, Unbuilt Category RB+B Architects, Inc Exhibition of School Planning and Architecture.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District November 17, 2010 EDUCATE  ENGAGE  EMPOWER 1.
  Provide a library link at an existing campus crossroads and a new face for the combined Deering Library/ University Library complex  Strengthen the.
Calle Real Campus Design Guidelines. Five-Step Process 1999 Board Direction, create a five phase process--- –Phase 1: Determine Space Needs –Phase 2:
Palm Beach MPO Draft Complete Streets Policy Palm Beach MPO Draft Complete Streets Policy Advisory Committees September
City of Suwanee 2030 comprehensive plan. TODAY’S AGENDA Process Update Community Agenda Framework “Compass” Review  Images and Questions  Comp Plan.
Master Plan Update February 4, 2015 Georgetown University Hoya Roundtable Student Engagement.
Focus Areas Learning environments that meet the needs of today’s learners Safe and secure buildings and grounds Improve district infrastructure.
MOORE HIGH SCHOOL.  Drills are a first and important step in keeping schools safe and secure. They are filled with teachable moments!
Return site to its rightful glory with cleaner water and more enjoyable experience Propose appropriate additions and renovations to pool, buildings and.
FACILITIES MASTER PLAN FMP Review October TIME LINE 2014November 2015 February March April May October / November December Education / Facility.
Aquatic Facility Concept Design. “Every Dog has its Day” Park Valley Pool Pool is 28 years old and nearing the 4-9 years of identified life expectancy.
EASTSIDE ACTIVITY CENTER DRAFT MASTER PLAN Board of County Commissioners January 22, 2008.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 6, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 14, 2011 EDUCATE  ENGAGE  EMPOWER 1.
LANDSCAPE ARCHITECTURE. Are you interested in nature and preserving Mother Earth?
Potomac Hill Campus Master Plan Preliminary Planning Principles “Observing the Past, Planning the Future” Campus Master Plan Potomac Hill.
site analysis A2D2 Zoning Changes “Core Downtown” D1 District Assumed 180’ Height Limit 400% FAR 700% FAR with premiums - Green construction - Parking.
Learning the Basics of Recreation Facilities
SAN FRANCISCO INTERNATIONAL AIRPORT CONSOLIDATED ADMINISTRATION CAMPUS SFAC Civic Design Review – Informational Overview February 8, 2016.
1 City of Portland Bureau of Development Services Staff Presentation to the Historic Landmarks Commission Type II Appeal of Approval LU HDZ –
Planning & Community Development Department Olivewood Village Project (530, 535 E. Union St., 95, 99, 119 N. Madison Ave. and 585 E. Colorado Blvd.) Predevelopment.
White Pigeon Community Schools
The City of Colorado Springs Recognized a Unique and Powerful Window of Opportunity: Linking Expansion of its Knowledge and Innovation Capacity (UCCS)
PROJECT PLANNING MEETING
ROOSEVELT CITY GENERAL PLAN 2010
PREPARED BY: JOSHIMA V.M., UNIVERSITY OF NIZWA
254 East Union Street Pre Development Plan Review
Where do you go from here?
N Learning Resources Center To Sim Lab Interior--- Office 115 ELEVATOR
Presentation transcript:

January 26, 2012

Key Themes from User Groups

1) Historic character of the building a. All groups adamant about keeping the building’s historic character and restoring what has been changed (i.e.: windows/natural lighting) 2) Energy efficiency, temperature control and ventilation a. All internal groups had this as a top priority 3) Parking and traffic a. More parking to get students off the streets b. Better traffic patterns around and to campus c. Keep students on campus! Make them want to stay! 4) Food Service/cafeteria a. Need larger seating area to reduce the number of lunch periods b. Keep as many students on campus as possible c. Need a space students want to be in 5) Technology in instruction areas a. Faculty and students recognize the need for technology to be incorporated everywhere in the buildings and not just added on

6) Safe connection between the campuses a. Safety from slippery surfaces b. Protection from the elements c. Protection from vehicles d. Energy consumption from opening doors e. Internal circulation pinch point f. Security-multiple access points 7) Commons and info commons a. With food and beverage b. With connection to technology c. With good restroom facilities d. With display space for student work/accomplishments e. Formal and informal performance spaces 8) Bathrooms and plumbing a. Adequacy in numbers b. Quality

9) Safety and security issues (Architect/ Planner Issues) 1. IT building is in a really bad location a. Building is too small and limited in growth potential b. Pedestrian and vehicular traffic conflict c. Blocks potential N-S pedestrian traffic 2. Campus traffic is completely disorganized a. Pedestrian b. Vehicular 3. No good space for Small Learning Communities (SLC) 4. No good main entrances to building a. Several entrances but not convenient to parking b. The ‘real’ main entrance is buried c. South entrance/exit is jammed at class change d. delivery areas 5. Lighting a. Natural b. Man-made-adequate for the space usage 6. Educational use issues a. Fine Arts b. Industrial technology c. Library d. Culinary arts

Setting Priorities

Infrastructure for existing building oHeat/ ventilation oWindows oTechnology New spaces oCommons oFood service oConnections to south campus Site work / traffic / parking IT building (stay or go?) SLC space creation

Preliminary Information

Scheme A

Scheme A Notes Leaves no large touches to original building (south hallway extension only) Puts commons & food area (noisy) next to other busy/noisy spaces (field house) Ties field house levels together Commons/food areas great overflow for events (field house and auditorium) “Green” roof over commons/food area Minimal visual impact on campus Visual to and from stadium Great outdoor spaces oBetween field house & stadium oGreen roof o(if IT goes) creates a great “mall” on west (main) side of building 4th Ave S utilities must be rerouted Eliminates vehicle/pedestrian cross traffic Opening up 20th Street S takes pressure off 3rd Ave S (focus traffic to the west) Covers up the “ugly” face of Swarthout field house – new construction will be more compatible with original building Use “no man land” to south of field house for future SLC area(s) Parking on north & east sides for faculty and staff only – heavily landscaped and bermed (re: civic center) Uses traffic pattern already defined (from existing hall) (will need to clean up hallway) IT curriculum must be addressed off campus SLC space creation

Scheme B

Scheme B Notes Connects two existing vertical circulation areas (main building elevator/stair and field house/south campus) Simply addressed floor elevation differences Commons/food service areas – great overflow/event space with field house IT building can stay or go (now or later) (a bit awkward if it stays) Connection walkway covers a bit of the west elevation of the main building Good visual connection to/from stadium area Great outdoor spaces for students Stronger visual impact on campus than Scheme A but less than C or D Ties field house levels together Puts noisy/busy areas away from academic/quiet areas Eliminates vehicle/pedestrian cross traffic Multi-level connection to main building possible Does cover up much of Swarthout Building (+ or -) Parking on north & east for faculty and staff only

Scheme C

Scheme C Notes Elevated pedestrian bridge allows use of 4th Ave S Elevated bridge allows existing utilities to remain in street ($savings) Least cost scheme IT must be addressed off campus Repurpose IT building - (makes commitment for the building to stay long-term) Ties field house levels together with new vertical circulation Minimum site impact Greatest visual impact on main building Some visual connection to to/from stadium Not much better connection to outdoor spaces for students Commons/food service not easily used for field house events Commons/food service usable for stadium functions (but only for GFHS?) Could expand underground to north & west for SLC’s/other space needs Opening up 20th Street S and reopening 4th to limited traffic simplifies vehicular traffic

Scheme D

Scheme D Notes Several “touches” to original building – (treat with historic context) Centralize – commons and food service Commons/food service not immediately adjacent for overflows/joint usages Commons/food service not able to be used for field house event overflow Addition between buildings is great academic space growth for traditional or SLC’s (fine arts especially) Larger visual impact on campus (+ or -) Leaves IT building in place for IT (could also add-on if needed) Increased parking close to buildings Ties field house levels together Ties all buildings together with simple traffic pattern 4th Ave S utilities must be rerouted Scheme places commons & food service closer to academic areas (+ or -) Open 20th Street S for cleaner traffic on east side of campus Not good connection to/from stadium With IT building the original building is blocked (view and traffic) Parking on north & east for faculty and staff only - landscaped and bermed Service area on NE corner of campus (not great for vehicle/pedestrian conflicts) Can use “no man land” south of field house (may need to reroute utilities) Utilizes existing pedestrian traffic pattern from main building (south corridor)

Images

Key Themes

KEY THEMES Identified by Stakeholder Groups, Oct 2011 – Jan 2012 Historic Character Energy, Ventilation, Temperature Control Parking and Traffic Food Service / Cafeteria Technology Safe Connection between Campuses Commons Bathrooms Safety and Security