Matching Shovels ©Dr. B. C. Paul 2000 revised 2008 Note – Matching procedures depicted in these slides are widely understood among those schooled in the.

Slides:



Advertisements
Similar presentations
Biosphere 3: Energy Look at how MANY panels there are for just those few small living spaces! Tahoma Jr. High 8th Grade Science Maple Valley, WA.
Advertisements

Excavating and Lifting Part 1
Running MSOPIT for Assignment #6 These Slides are Base on MS3D version 4.6 which was current in Sept. of 2009 Note – These slides contain concepts also.
Picking a Suitable Truck © Dr. B. C. Paul 2000 Revised 2009 Hi!
Loading and Hauling Part 2
Lecture 4 Excavating and Lifting
Types of Loaders ©Dr. B. C. Paul 2000 Modified 2009 Note – These slides contain drawings copied from the book Surface Mining Equipment.
Production Capacity of Truck and Loader Teams ©Dr. B. C. Paul 2003.
Lecture 7 Loading and Hauling
Front End Loader Costs ©Dr. B. C. Paul 2000 Start Detailed Economic Comparison of 3 machines l Strategy Go Through Each Machine and Figure the Cost Compare.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Chapter 10 Trucks and Hauling Equipment.
Front shovel, back hoe and loader. Group member: Lam Wai Kei Hui Tan La
Excavating and Lifting Hmwk Ch 2 # 1,2,5,8 Ch 3 #2,4,6,10.
Handling Solution in a Heap Leach ©2009 Dr. B. C. Paul.
TRUCKS THE MOST COMMON HAULING EQUIPMENT USED FOR MILITARY CONSTRUCTION SITE ARE 2 1/2, 5, AND 20 TON DUMP TRUCKS. THE HAUL CAPACITY CAN BE EXPRESSED.
Matching An Excavator to Our Trucks ©2009 Dr. B. C. Paul Note – These Slides contain tables and information found in the Caterpillar Performance Handbook.
Excavating and Lifting Part 2
CEE 404 Winter Productivity Refresher. CEE 404 Winter Excavator Cycle Time.
Bell Work: Becky reduced the size of the image on the computer screen by 40%. By what percent was the area of the image reduced?
Pumps for Slurry © 2012 Dr. B. C. Paul Note – These slide illustrate a solution approach using Sysel, a program developed by GIW and contain screen shots.
Truck Fleet Costs ©Dr. B. C. Paul 2000 Revised 2008, 2009 Note – This presentation includes screen shots from the Caterpillar Performance Handbook, Catapillar’s.
Tire Heating – The TMPH Rating ©Dr. B. C. Paul 2000 revised 2008 Note- These slides demonstrate the use of the FPC computer program developed by the Caterpillar.
Adjusting a Mine Cost Service Model. A Note About MSOPIT Compatibility Mine Cost Service Expressed Mining Costs as Costs Per tonne of Ore Mined MSOPIT.
Using FPC to Size Truck and Loader Fleets ©2012 Dr. B. C. Paul Note – This presentation demonstrates fleet sizing using Caterpillar’s FPC program and.
Checking for Traction Problems ©Dr. B. C. Paul 2000 revised 2008 Note – The methods outlined here are common practice in industry and can be found in.
Checking for Traction ©2009 Dr. B. C. Paul Note – These slides contain material from slides dating back to 2000 as well as information and screen shots.
Loading Considerations © 2000 Dr. B. C. Paul revisions 2009 Note These slides include screen shots from the Caterpillar Performance Manual Edition 29.
GPS Surveying ©2010 Dr. B. C. Paul Note – The techniques shown in these slides are considered common knowledge to surveyors. Figures in the slides may.
Checking for Tire Heating ©2009 Dr B C Paul Note – These slides contain material from slides dating back to 2000 and also contains screen shots from the.
Step 5 Truck Fleet Costs ©Dr. B. C. Paul 2000 Revised 2008 Note – This presentation includes screen shots from the Caterpillar Performance Handbook, Catapillar’s.
Entering My Haul Road Profile ©2009 Dr. B. C. Paul Note- This presentation draws on previous notes developed as early as 2000 and contains numerous screen.
Getting Cycle Times ©2009 Dr. B C Paul Note – These slides contain material from slides dating back to 2000 and also contains screen shots from the program.
Obtaining Information From the Geologic Block Model
SHOVELS.
Developing Haulage Profiles (Part of Getting the Truck Cycle Time) ©Dr. B. C. Paul 2000 revised 2008 Note – The instructor prepared the basic steps and.
Steps in Fleet Selection ©Dr. B. C. Paul 2000, revised 2008 Note- General steps and methodologies found in these slides roughly follow material found.
Class Introduction Surface Mining ©2007 revised 2011 Dr. Bradley C Paul.
Computer Aided Mine Design Part III Cut-Off/Equipment Interactions ©Dr. B. C. Paul 2000 ©Dr. B. C. Paul Summer 2003.
Next Part of Step II Determining Peak Speed ©Dr. B. C. Paul 2000 revised 2008 Note – The methods outlined here are typical of widely known published engineering.
8-10 Scaling Three-Dimensional Figures Course 3 Warm Up Warm Up Problem of the Day Problem of the Day Lesson Presentation Lesson Presentation.
Step #1 Matching ©Dr. B. C. Paul 2000 revised 2008 Note many of the ideas expressed in these slides can be found in Surface Mining Manuals, the Book Surface.
Cable Shovel Costs ©Dr. B. C. Paul 2000 Do the Cable Shovel l Have a 12 yard P+H Examine Cable Shovel Cycle Time Chart Predicted 26 seconds.
Make a Great Map of Your Engineering Building Traverse ©Mar Dr. B. C. Paul Note – This presentation contains screen shots from the Mine Sight and.
Design of Belt Conveyors Step #3 Checking Out the Power ©2012 Dr. B. C. Paul Note – Material in these slides include screen shots from the program “Belt.
Handling Multiple Loaders ©Dr. B. C. Paul 2000 Revised 2008 The Binomial Formula is widely published in works on statistics. These slides contain screen.
Entering Your Traverse Data In MineSight ©Feb 2009 Dr. B. C. Paul Note – the following presentation includes screen shots an operating suggestions for.
FPC Assignment 1. Go to Your Project and Fire-Up MSOPIT.
Basics of Building a Truck and Loader Fleet ©Dr. B. C. Paul 2000, revised 2008,2009 Note- General steps and methodologies found in these slides roughly.
Week 10 ©2012 Dr B C Paul. Copper Your initial road moves have been questioned. –You have drawings showing the end of each stage –Between two of your.
RCLayout User note January Do product layout.
Entering Our Choices into FPC ©2009 Dr B C Paul Note – This slide series contains screen shots of the computer program FPC developed by Caterpillar Equipment.
Types of Loaders ©Dr. B. C. Paul 2000 Loading Equipment l Four Basic Types of Loaders Cable Shovel Hydraulic Front Shovel (also called hydraulic excavator)
Hydraulic Excavator Costs ©Dr. B. C. Paul 2000 Economics of Hydraulic Excavator l Has about same cycle time as Cable Shovel - about 25 seconds Need to.
A Heap Leach Plan. My Concept I’ll build one great big pad I’ll fill it in with rows of material about 40 feet high I’ll then fill in between the rows.
My Papaw is a coal miner, and he told me all about just where he goes with his hard hat and lunch pail when he goes out.
The 2007 Class Project ©2007 Dr. B. C. Paul. The 2007 Project A copper/moly porphyry deposit located near Eureka Utah –Ie (hard rock deposit) Deposit.
Click your mouse for next slide Dreamweaver – Synchronizing your Site to a Network Drive In the first lesson we defined our site and we associated a root.
Obtaining Moving Cycle Times ©Dr. B. C. Paul 2000 revised 2008 Note – The methods shown in these slides are adapted to use FPC, a program produced by.
Checking On Production ©2009 Dr. B. C. Paul Note – These slides contain material from slides dating back to 2000 and also contains screen shots from the.
Excavation and lifting Excavator: Power driven digging machine Types 1. Hydraulic excavator 2. Cable operated excavator 3. Shovel 4. Draglines 5. Hoes.
8-10 Scaling Three-Dimensional Figures Warm Up Problem of the Day
Triple Beam balance zero, adjust, and read the triple beam balance.
Contractor Safety Forum Submission January 16, 2018
Designing your dream bedroom
CONSTRUCTION METHODS & TECHNOLOGY
Lecture 7 Excavators TSP-308 MPK Ferdinand Fassa.
CONSTRUCTION EQUIPMENT MANAGEMENT
Lecture 5 Dozer TSP-308 MPK Ferdinand Fassa.
8-10 Scaling Three-Dimensional Figures Warm Up Problem of the Day
Splash Screen.
Presentation transcript:

Matching Shovels ©Dr. B. C. Paul 2000 revised 2008 Note – Matching procedures depicted in these slides are widely understood among those schooled in the subject and can be found in many handbooks or manufactures literature. These slides include reproductions from the Caterpillar Performance Handbook and equipment literature from P+H. Also included are screen shots from the FPC computer program by Caterpillar Equipment Company.

Match Up a Hydraulic Front Shovel As with FELs we want a shovel that Fills the truck in a logical integer number of passes Can get the material over the edge of the truck Center the load in the truck For Material Easy Load stockpile 1 to 1.1 Average 0.95 to 1 Rather Difficult 0.9 to 0.95 Difficult 0.85 to 0.9 Note Hydraulic Front Shovel get better fill and have better bucket maneuvering

Zoom in on a Bucket Size l About a 0.93 fill is quite safe to guess l 102/0.93*#of passes = bucket size 3 passes yd^3 (pretty big) 4 passes yd^3 5 passes yd^3

Go Shopping for a Front Shovel Cat’s Front Shovels are Somewhat limited (we will Use them in our example) Hitachi and others have some Excellent offerings. Only the 5230B is in the Size range we are looking For with a 22.2 yd^3 bucket

Buckets Limited in Front Shovel Configuration Fill Factor = 102/(5*22.2) = – ie about 92% Reasonable for our material and matches the truck with an Integer number of passes

Checking on Loading Height and Reach Over 36 feet up – ya that Will load a 16 ft high truck Well over 12 feet Extension definitely Reaches the center of the truck Just in case we are not Sure it shows the dimensions Of a 785 truck

Note This l Even a big front end loader struggles with lift and reach l Hydraulic Front Shovels really have almost no challenge if they are sized anywhere close to right

Time to Input into FPC I will create a 2 nd Fleet for comparison Click Add New Fleet Input name and description

Input My Same Truck Info Now we will Select a loader

Pick My 5230B Front Shovel Select Cat Standard Machines Select Hydraulic Excavators Pick the 5230B from The list Click Ok

Check Out Cycle Time l The Cat program defaults to single truck loading 0.7 for the truck exchange 0.05 to dump first bucket 0.48 min for each subsequent pass (4) Total 2.67 minutes l 20 minute truck cycle / 2.67 loader cycle One loader can handle 7.5 trucks Pick 2 loaders

Adjust My FPC inputs 2 loaders 85% availability 92% Fill Factor

Try Matching a Cable Shovel l Cable Shovels Favor Larger Sizes l Their buckets are called dippers l Their Dippers are rated on struck- not heaped capacity

Fill Factors by Material Constraint l Cable Shovels have more limited motion than a hydraulic front shovel l Easy - Sand and Gravel get about 0.95 to 1 l Medium - Unconsolidated - some boulders 0.90 to 0.95 l Hard - Well Blasted - has void space (Limestone) 0.8 to 0.9 l Very Hard - Interlocking Chunks 0.7 to 0.8

If We Estimate Fill Factor at 0.93 l Size Dipper = Truck Volume/(#passes*fill factor) 102 cubic yard truck volume limit l 3 Passes 36.6 cubic yard l 4 Passes 27.4 cubic yard l 5 Passes cubic yard

Cat Handbook Limitation l Cat Does not make cable shovels They do put P+H products in their program

Lets Fish a Little with the Program I created a 3 rd fleet And put in my 10 cat 785s When I selected a Loader I picked Cat Standard Machines (even though P+H is Not Cat) Picked Power Shovel List shows 2300 and 2800 are my size

Checking Out the Choices l 2300XPA has a 27 cubic yard standard dipper 4 Pass load 102/(27*4) = still in range of medium material 3 Pass load – 2800XP 102/(39*3)= this will probably be limiting fill by truck size Lets pick the 2800XP

Information Goes In Now we need some Number and availability Adjustments Cable Shovels are Rugged and very Available – usually 0.9 We also back calculated Our fill factor at 88%

Input the Easy Pickens 88% Fill 90% availability Now we need to Estimate how many Loaders.

Cycle Time For Loading a Truck l 0.7 minutes truck change out l 0.05 minutes for first dump l 0.5 minutes for each of 2 remaining l Total = 1.75 minutes l Truck Cycle 20/ 1.75 = 11.4 trucks Lets go with just 1 loader

What if I Want to Check Loading Height Etc. Go to My Courses Web Site Pick the Reading Room.

In the Reading Room Scroll down to Surface Mining

Scroll Down to Electric Mining Shovels Pick the PDF file for A P+H2800

Pick off the Manufactures Specs You Need to Check