HiLumi-LHC / LARP Conductor and Cable Internal Review October 16 th and 17 th 2013 H. Felice LARP Short Magnets Fabrication and Test experience relevant.

Slides:



Advertisements
Similar presentations
DOE Review of LARP – February 17-18, 2014 Overview and Responses to Recommendations Giorgio Ambrosio 2/17/14 1.
Advertisements

S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
Outline: Goals for the cable development at CERN. Main parameters of the cable. Cable development work for a cable width of 15.1 mm and for a cable width.
Helene Felice Joint LARP CM20 / Hilumi Meeting April 8 th to 10 th 2013 Napa, CA, USA HQ02 Assembly summary and Next steps.
Superconducting Large Bore Sextupole for ILC
ASC 2012, 10/10/2012Test results and analysis of LQS03 – G. Ambrosio 1 BNL - FNAL - LBNL - SLAC Test Results and Analysis of LQS03 Third Long Nb 3 Sn Quadrupole.
Nb3Sn Cable and Insulation for LARP High-Gradient Quadrupole Magnets
11 Oct , 2013 by Video LBNL Cable Experience for HiLumi HiLumi LARP/LHC Strand and Cable Internal Review Oct , 2013 by Video D.R. Dietderich,
Long Racetrack (LR) strategy – G. Ambrosio 1 LARP DOE review - FNAL, June 12-14, 2006 BNL - FNAL - LBNL - SLAC OUTLINE: LR R&D goals & plans Long Racetrack.
BNL - FNAL - LBNL - SLAC Long Quadrupole Results & Status Giorgio Ambrosio Fermilab Task Leaders: Fred Nobrega (FNAL) – Coils Jesse Schmalzle (BNL) – Coils.
MQXF Design and Conductor Requirements P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
2 nd Joint HiLumi LHC – LARP Annual Meeting INFN Frascati – November 14 th to 16 th 2012 Helene Felice Paolo Ferracin LQ Mechanical Behavior Overview and.
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
F. Borgnolutti November 14 th nd HiLumi Collaboration Meeting Frascati HQ coils: History & Performance.
QXF Cable Status D.R. Dietderich Conductor Working Group Video Meeting, Sept. 17, 2014.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
SC magnet developments at CEA/Saclay Maria Durante Hélène Felice CEA Saclay DSM/DAPNIA/SACM/LEAS.
QXF protection heater design : Overview and status Tiina Salmi QXF quench protection meeting April 30, 2013.
BNL - FNAL - LBNL - SLAC Design and Test of the 1 st Nb 3 Sn Long Quadrupole by LARP Giorgio Ambrosio Fermilab Acknowledgement: many people contributed.
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
ASC 2012Nb 3 Sn IR Quadrupoles for HL-LHC – G. Sabbi 1 Nb 3 Sn IR Quadrupoles for HL-LHC BNL - FNAL - LBNL - SLAC GianLuca Sabbi for the US LHC Accelerator.
DOE Review of LARP – February 17-18, 2014 QXF Design, Fabrication and Irradiation Study Giorgio Ambrosio 2/17/14 1.
Lab Coordination Meeting 3/21/13LHC IR Quadrupole Plan – G. Sabbi 1 LARP Magnet Systems Plan GianLuca Sabbi Lab Coordination Meeting March 21, 2013.
ASC 2014Nb 3 Sn Block Coil Dipoles for a 100 TeV Hadron Collider – G. Sabbi 1 Performance characteristics of Nb 3 Sn block-coil dipoles for a 100 TeV hadron.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
Superconducting Magnet Group Future of HQ coils S. Caspi 8/25/2011.
Helene Felice 11/16/2011 LARP Collaboration Meeting 17 1 st HiLumi Collaboration Meeting CERN Status on HQ Coil Design and Fabrication.
LARP DOE Review, 7/9/2012Magnet Systems Introduction – G. Sabbi 1 Magnet Systems Overview and HQ Program GianLuca Sabbi 2012 DOE Review of LARP SLAC, July.
MQXF Design and Conductor Requirements P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
MQXF support structure An extension of LARP experience Helene Felice MQXF Design Review December 10 th to 12 th, 2014 CERN.
LARP Magnets FNAL contribution to LARP (LHC Accelerator Research Program) FNAL core-program support to LARP DOE Annual Program Review - May 16-18, 2006.
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
Magnet design, final parameters Paolo Ferracin and Attilio Milanese EuCARD ESAC review for the FRESCA2 dipole CERN March, 2012.
LARP Collaboration Meeting, April 26-28, 2006Gian Luca Sabbi HQ Design Study (WBS ) LARP Collaboration Meeting April 26-28, 2006 N. Andreev, E.
MQXF Design Review, 12/10/14R&D basis for MQXF – G. Sabbi 1 IR Quadrupole R&D Program as a basis for MQXF GianLuca Sabbi QXF Design Review CERN, December.
LARP CM17, 11/16/2011Magnet Systems Overview – G. Sabbi 1 Magnet Systems Overview GianLuca Sabbi LARP Collaboration Meeting 17 November 16, 2011 BNL -
Helene Felice HQ Test Results Review Thursday December 16 th Overview of HQ coils and Magnet.
Outline: Strand R&D and strand procurement and inventory. Main parameters of the cable without a core. Results obtained during the cable development without.
S. Caspi, LBNL TQS – Progress and plans Shlomo Caspi LBNL Collaboration meeting FNAL April
10/16/2013QXF Requirements – G. Sabbi, E. Todesco 1 QXF requirements relevant to optimization and selection of conductor and cable parameters GianLuca.
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
QXF protection meeting, 4/29/14HQ High Miits Study – H. Bajas, G. Sabbi 1 HQ02 High MIITs Studies Preliminary findings and next steps Hugo Bajas, GianLuca.
Helene Felice Joint LARP CM20 / Hilumi Meeting April 8 th to 10 th 2013 Napa, CA, USA HQ02 Assembly summary and Next steps.
HQ02A2 TEST RESULTS November 7, 2013 FERMILAB. HQ02 test at Fermilab 2  First HQ quadrupole with coils (#15-17, #20) of the optimized design o Only coil.
TQC03e Test Status  Magnetic measurements at 300 K  Z-scan at ±10 A  Magnetic measurements at 4.6 K (I max up to 6.5 kA)  Quench training and ramp.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
S. Caspi, LBNL HQ Magnet Program Shlomo Caspi LBNL LARP DOE Review FNAL June 1-2, 2011 BNL Jesse Schmalze Mike Anarella Peter Wanderer Arup Gosh FNAL Rodger.
BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio Fermilab Long Quadrupole Task Leaders: Fred Nobrega (FNAL) – Coils Jesse Schmalzle (BNL) – Coils.
LARP DOE Review, 7/9/2012Long Quadrupole – G. Ambrosio 1 Long Quadrupole Program Giorgio Ambrosio DOE Review of the LARP Program SLAC July 9-10, 2011 LQ.
BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio Fermilab Many people contributed to this work, most of all the Long Quadrupole Task Leaders:
MQXFS1 Test Results G. Chlachidze, J. DiMarco, S. Izquierdo-Bermudez, E. Ravaioli, S. Stoynev, T. Strauss et al. Joint LARP CM26/Hi-Lumi Meeting SLAC May.
Answers to the review committee G. Ambrosio, B.Bordini, P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 Quench Protection of Long Nb 3 Sn Quads Giorgio Ambrosio Fermilab.
LHC Performance Workshop 2012Nb 3 Sn IR Magnets – G. Sabbi 1 New Magnets for the IR How far are we from the HL-LHC Target? BNL - FNAL - LBNL - SLAC GianLuca.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
MQXF Design and Conductor Requirements
TQS Overview and recent progress
HQ Mirror Assembly R. Bossert
TQS Structure Design and Modeling
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
the MDP High Field Dipole Demonstrator
New Magnets for the IR How far are we from the HL-LHC Target?
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Long term behavior and high MIITs test in the LARP program
Cross-section of the 150 mm aperture case
Presentation transcript:

HiLumi-LHC / LARP Conductor and Cable Internal Review October 16 th and 17 th 2013 H. Felice LARP Short Magnets Fabrication and Test experience relevant to QXF conductor and cable specifications

What is a successful magnet? A magnet in which every single stage of fabrication has been successful A magnet will be considered successful when I quench > 90 % Iss 10/17/20132 LARP history illustrates the involvement of each of these steps in magnet success and failures… H. Felice Cable Coil Fabrication Assembly - Preload StrandDesign

Successful LARP Magnets 10/17/20133H. Felice Large parameter space covered by short models

From TQS02 series to TQS03 series TQS02c High RRR (>200) 70 microns filament 47 % Cu fraction Jc (12T, 4.3 K) 2925 A/mm 2 Tested at CERN TQS03 High RRR (>200) 50 microns filament 54 % Cu fraction Jc (12T, 4.3 K) 2770 A/mm 2 Tested at CERN 205 – 210 T/m 220T/m Moving from 54/61 to 108/127 improved performances at 1.9 K In TQ 10/17/2013H. Felice4 220 T/m 238 T/m

TQS03 series and stress limit With Lorentz forces at 12 kA 10/17/ tests: TQS03 a, b, c and d performed with variable pre-stress TQS03a: 120 MPa TQS03b: 160 MPa TQS03c : 200 Mpa TQS03d: 120 MPa H. Felice After cool-down

TQS03 training 10/17/2013H. Felice6 TQS03 series demonstrated -Progressive degradation: but only 5 % from a to c -Permanent degradation beyond 200 MPa preload -QXF should have margin Magnet: pole turn (preload) / max midplane stress (excitation) TQS03a: / -190 MPa TQS03b: / -240 MPa TQS03c : / -260 Mpa TQS03d: / -190 Mpa Quench location: Midplane area

HQ series overview HQ01 a-b-c-d-e Magnets with mixed coils Coils => 54/61 Coils => 108/127 Performance (LBNL and CERN) 4 magnets => 70 to 85 % Iss at 4.4 K HQ01e test at CERN => 85 % at 1.9 K HQ02a and a2 Same conductor in all coils Coils => 108/127 Performance (FNAL) 98 % at 4.5 K 89 % at 2.2 K A. Godeke 10/17/2013H. Felice7 2 of each / magnet

HQ series performance overview HQ01 series HQ02 Reached 80% in 2 quenches Good memory What changed? The coil fabrication Cable with Stainless steel core HQM04 97% at 4.5 K 94% at 2.2 K Maxim Marchevsky Guram Chladidze 10/17/2013H. Felice8

Impact of coil fabrication Review of the coil fabrication process and design  High compaction of the winding during fabrication  Tooling and coil design oversight: no margin to allow for cable expansion  Risky end design Suspected to be the cause of conductor degradation in potted coils Main requirement for HQ02 coils: using the same tooling as HQ01 Accounting for dimensional changes and interlayer insulation  Smaller cable with smaller strand => mm diameter strand => 14.8 mm x mm  Axial gap size 4 mm/m Revision of the end parts design 10/17/20139H. Felice Lead end R, Hafalia, S, Caspi

HQ experience applied to QXF conductor Cable dimensional change accounted for in the magnetic design and tooling design 4.5 % in thickness and 2 % in width in ROXIE cross-section Design made with reacted cable dimensions Based on HQ and LQ experimental data Importance to provide actual cable dimensional changes data for QXF cable to magnet designers 10/17/2013H. Felice10

Impact on coil fabrication schedule Last HQ01 coil #9 completed end of 2010 HQ01d and e tested starting April st Mirror test at FNAL HQM01 2 nd Mirror test at FNAL HQM02 1 less turn 91 % Iss at 4.6 K 89 % Iss at 2.2 K 3 rd Mirror test at FNAL HQM04 New end parts New cable HQ02 tested at FNAL To validate compaction theory 09/ / / /2011 Unforeseen change of cable in the case of HQ02 delayed strongly the magnet production QXF 2 nd generation cable should be defined very early to facilitate implementation 10/17/2013H. Felice11

HQ Winding Experience HQ01: 1 st generation of coils 2 pass cable Mechanically stable HQ02: 2 nd generation of coils 1 pass cable to implement the stainless steel core “Easy” popped strands noticed by technicians in some coils Easily fixable HQ02 experience => Learning experience on how to handle less mechanically stable cables 10/17/201312H. Felice D. Dietderich - F. Borgnolutti

Impact of SS core in HQ performance 10/17/201313H. Felice X. Wang, J. DiMarco, M. Marchevsky – Guram Chladidze HQ01 / HQ02 performance Beneficial effect on ramp rate dependence Beneficial effect on field quality

Summary 10/17/2013H. Felice14 LARP short models performance widely influenced by all the production chain Best examples: HQ01 to HQM04 / HQ02 With coil fabrication improvement => performance improvement despite low RRR in coil 15 What to remember from short model program for QXF Cable Beneficial effect of the core cable on field quality and ramp rate dependence let’s keep in mind the potential delay to implement a new cable design Coil fabrication / tooling design: Data for Effective dimensional changes in the design Assembly: Stress level in conductor => TQS03 is a good guideline