'Coal: Least Cost Option for Power Generation in Pakistan‘ Date: 22 nd OCTOBER 2011 Location: INTERNATIONAL COAL CONFERENCE, SHERATON HOTEL, KARACHI. ©

Slides:



Advertisements
Similar presentations
Pakistans Power Sector Need for Reforms By Kalim A. Siddiqui President-Petroleum Marketing Byco Petroleum Paksitan Limited 4 th International Power Generation.
Advertisements

Leaders in the design, implementation and operation of markets for electricity, gas and water. Portfolio Generation Investment Under Uncertainty Michael.
National Town Meeting on Demand Response Session A – Estimate It, Measure It, Verify It Demand Response Coordinating Committee (DRCC) Renaissance Washington.
版权所有: CMC 1 Sonda-Jherrukh Coal Mine& Power Plant Project.
© 2013 Sri U-Thong Limited. All rights reserved. This presentation has been prepared by Sri U-Thong Limited and its holding company (collectively, “Sri.
IMPORTANT READ CAREFULLY BEFORE USING THIS PRODUCT LICENSE AGREEMENT AND LIMITED WARRANTY BY INSTALLING OR USING THE SOFTWARE, FILES OR OTHER ELECTRONIC.
Hedge fund flows on pace to nearly double 2012
Lignite Project By Ramic, Haris. GLOBAL OUTLOOK FOR ENERGY World energy consumption is projected to increase at about 1.8%/year between 2000 and 2030(driven.
Responding to the Electricity Challenges: Five Point Plan Overview 19 December 2014 Confidential 1.
Key Factors in the Introduction of Hydrogen as the Sustainable Fuel of the Future John P Blakeley, Research Fellow Jonathan D Leaver, Chairman Centre for.
PAKISTAN POWER SECTOR BACK-GROUND, PRESENT SITUATION & FUTURE PLANS.
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
FINANCING LNG PROJECTS. Contracting for and financing LNG assets April 2006.
Community Energy Opportunities Jon Bell Business Development Manager Mosscliff Environmental Ltd.
Golden Mile Transport Meeting 22 April The next evolutionary step for greentomato 2 The greentomato group provides a variety of goods and services.
IS THERE AN ENERGY CRISIS? David Brewer, BA., ACMA Director General Confederation of UK Coal Producers Presented to RICS Minerals and Waste Management.
1 Framework Required to Ensure Long-term Sustainability - Environmental and Socio- cultural concerns.
Sound Practice Guidance update Glasgow, 7 th November 2014 IOR Scottish Chapter The Institute of Operational Risk Brian Rowlands FIOR ©
WORLD ENERGY INVESTMENT OUTLOOK
Financing new electricity supply in the UK market with carbon abatement constraints Keith Palmer 08 March 2006 AFG.
Cheap Affordable Coal? Case Study: Tata Mundra Justin Guay, World Bank AGM, 2013.
NUNAVUT TUNNGAVIK INCORPORATED Lands Policy Advisory Committee Draft Uranium Policy.
You currently have no control over ever rising electricity prices Electricity costs have doubled over the last 10 years* What will your electricity bill.
Gas Development Master Plan Scenarios for the GDMP Capacity Building Workshop Bali, 1-2 July 2013.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
The role of waste management and energy from waste in a circular economy- SITA UK’s proposed Severnside development Sept 2009 Stuart Hayward-Higham.
Mike Zenker Barclays Capital Research (415) November 12, 2007
International LPG markets and LPG pricing outlook
Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 24 – 25, 2014 Gas Well Deliquification Breakout Session Managing Large Number.
Wood for Energy Experience of Coillte to date Presentation to the Oireachtas Joint Committee on Marine, Communications and Natural Resources George McCarthy.
International Energy Markets Calvin Kent Ph.D. AAS Marshall University.
1 IEA Energy Scenarios for India for 2030 Lars Strupeit Malé Declaration: Emission inventory preparation / scenarios / atmospheric transport modelling.
Solar-Powered Fuel Stations
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
Sustainable Energy options for Northern Ireland European Studies Project.
Natural Resource Partners L.P. SMH Capital Investor Growth Conference New York, NY November 8-9, 2007.
World Bank Energy Sector Lending: Encouraging the World’s Addiction to Fossil Fuels Heike Mainhardt-Gibbs Bank Information Center – March 2009.
10 th June 2008 Workshop on Clean Coal Technologies Regional Office of Silesia in Brussels.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Wholesale Electricity Market – Western Australia APEx Conference 2008 – Sydney Allan Dawson 13 October 2008.
World Energy Outlook 2006 Scenarios for the World and the European Union Presentation to European Wind Energy Conference Milan, Italy, 7-10 May 2007.
DEVE LOPING A SUCCESSFUL GEOTHERMAL INDUSTRY IN INDONESIA, CHARTING THE WAY TO A GREEN ENERGY ECONOMY THROUGH FISCAL POLICY REFORMS ( ROLE FOR MINISTRY.
1 Economics of The European 2020 Climate Goals Torben K. Mideksa Center for International Climate and Environmental Research - Oslo April 18, 2009 The.
L Click to edit Master text styles l Second level l Third level l Fourth level l Fifth level Energy Efficiency: Progress and Way Forward European Climate.
International Coal Conference nd October 2011 Coal – the Way to achieve energy security for Pakistan By Mohammad Younus Dagha Secretary Coal &
Weathering the Change Action Plan 2 ACT Climate Change Council 8 November 2011.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
Geothermal Fields On the Ring of Fire Prospect Developed Fields.
ENERGY SECURITY AND ENERGY UNION PERSPECTIVES FOR COUNTRY October/20/2015 CSF, Brussels BETTER RESEARCH, BETTER POLICY, BETTER REFORM
Post combustion capture of CO 2 Nick Otter International Workshop on “Power Generation with CCS in India” Ashok Hotel, New Delhi, India 22 nd January 2008.
ENERGY MARKETS DIVISION Factors Affecting Resource Investment Decisions in ERCOT June 30, 2011.
The Hub Power Company Ltd. China-Pakistan Economic Corridor Power Projects Round Table on Energy Serena Hotel, Islamabad September 29 th -30 th, 2015 Nazoor.
Infrastructure planning in the UK – old and new stories November 2010.
14 June 2011 Global economic recovery: From a surging start to a softer patch? Rob Dobson.
Carbon Abatement Technologies – A new Strategy Brian Morris Head Cleaner Fossil Fuel Technologies Unit.
Economic Assessment of Implementing the 10/20 Goals and Energy Efficiency Recommendations – Preliminary Results Prepared for : WRAP, AP2 Forum Prepared.
National Grid - Key Challenges Beijing 24 October 2005 Alan Smart Optimisation & Risk Manager UK Transmission.
EnergyTour November Copenhagen Energy Summit Energy Tour District Heating in Denmark Mr Jan Elleriis, Vice President, Metropolitan Copenhagen Heating.
The Energy Issue America faces a major energy supply crisis over the next two decades. The failure to meet this challenge will threaten our nation's economic.
Market Failures Chapter 7 Sections 2 and 3 Economic Solutions to Global Warming.
Pennsylvania Electric Supply GHG Forecast 1 Victoria Clark Stockholm Environment Institute - US Center 5/29/09.
UTC STUDY OF DISTRIBUTED GENERATION AND RECOMMENDATIONS Presentation for the Washington Future Energy Conference October 19, 2011.
Markit PMI James Kwan \ ***DATE*** The Science of Finance.
Connectivity to bank and sample account structure
Allington Waste Management Facility
NS4960 Spring Term 2018 Nuclear Rebound?
Energy sector activities and Plans in the DPRK
Coal – security of coal supply considerations of EURACOAL
© 2013 Sri U-Thong Limited. All rights reserved
Presentation transcript:

'Coal: Least Cost Option for Power Generation in Pakistan‘ Date: 22 nd OCTOBER 2011 Location: INTERNATIONAL COAL CONFERENCE, SHERATON HOTEL, KARACHI. © SRK Consulting (UK) Ltd All rights reserved. Presented: NIGEL PICKETT, PRINCIPAL CONSULTANT, DUE DILIGENCE

Take Away Statement Rising energy demand Significant energy shortage. Power generating mix out of step with world norms Continuing long term trend of rising oil prices Natural gas demand exceeding supply Very large untapped potential source of power generation fuel in Thar Lignite Deposit The following 2 slides are drawn from a presentation by the Sindh Government to the Standing Committee to the National Assembly of Pakistan Key energy issues facing Pakistan The energy challenge for Pakistan is very significant in terms of its future growth © SRK Consulting (UK) Ltd All rights reserved.

Demand & Supply Gap Projection for Pakistan Current Installed Capacity (MW) Project Demand Gap (MW) YearMW 19, ,4746, ,21718, ,35936, ,56662, ,69595,798 Future Energy Demand Supply Gap is Alarming! Source: Pakistan Electric Power Company (PEPCO) 3 3www.sindhcoal.gos.pk

World Power Generation fuel Mix WorldPakistan A Comparison of Power Generation fuel Mix Hydro 16% Gas 20% Oil 6% Coal 41% Others 2% 4www.sindhcoal.gos.pk

Take Away Statement J.P Morgan in a January 2011 review of the demand for Coal noted  Oil and Gas increasingly costly to produce from diminishing reserves  Coal remained the fasting growth fuel in the World for the 6 th consecutive year in 2008  Coal fired industrialisation is expected especially in India and China Source: EIA, World Energy Projections plus noted:  Coal will have an increasingly dominant role in Power generation over the period 2006 –  Natural Gas and Renewable Energy will double in in generating output over the same period, equalling each other  Coal will also double in generating output over the same period but will be equal to the combined output of Natural Gas and Renewable Energy FUTURE CHANGES IN ENERGY DEMAND THE ENERGY GAP FOR THE CURRENT PAKISTAN GENERATING MODEL CAN ONLY GET WORSE © SRK Consulting (UK) Ltd All rights reserved. THE ENERGY MIX FOR PAKISTAN IS OUT OF STEP WITH BOTH CURRENT & FUTURE ENERGY MODELS

Take Away Statement Pakistan will need to consider a model which addresses the following:  Imported Oil increasingly costly in the face of future demand and diminishing reserves, with consequent reduction in use in Power Generation  Need to carry out further exploration for gas deposits in Pakistan to maintain existing model level, or face reduction in use of Gas for Power Generation  The current renewables element of the model is largely composed of Hydro – consideration should be given to further Hydro developments  With the high levels of natural sunlight,Pakistan could consider the potential for light industrial power supply in more remote areas, via Photo Voltaic energy sources  Increasingly major companies are developing propositions in this field, i.e. SunEdison  With its massive Lignite reserves the country should consider a move to Coal for base load power generation  Countries with major Lignite deposits produce a high % of their electricity from lignite fed power stations i.e. Germany, Poland  Other such as Indonesia are increasingly switching from hard coal to soft coal (lignite) as the generating power source and keeping their hard coal deposits for export. A FUTURE ENERGY MODEL FUTURE GROWTH OF THE ECONOMY REQUIRES A CHANGE IN THE POWER GENERATING MODEL © SRK Consulting (UK) Ltd All rights reserved.

Take Away Statement Pakistan will need to consider the following:  Ensuring the development of lignite mining operations by pro-active support to possible mine developers.  Need to encourage existing Power Generators to draw up plans for conversion of power stations from oil and back to coal.  We understand that in a number of cases the power stations were originally coal fired and so conversion back from oil to coal may not be too onerous a task.  The above also offers a low capital cost solution in the short term, but does have transportation challenges for Lignite.  If the conversion route is followed the rail routes from Thar to the power stations may need overhaul.  This may require dedicated train sets established for the operation along with rapid loading and offloading facilities LIGNITE SOURCED POWER GENERATION LIGNITE A MEANS TO GENERATING FUTURE GROWTH OF THE ECONOMY © SRK Consulting (UK) Ltd All rights reserved.

Take Away Statement Pakistan will need to consider the following:  Ultimately Power Generation Plants will need to be constructed on site in Thar.  This will minimise the coal transportation costs and optimise the coal and power production processes.  It will follow a well established World Model of Lignite Power Generation  However in order to achieve low cost production and possible avoidance of operating subsidies, such as is used in Western Countries, i.e. Germany and Poland, a different production model will be required.  The model is based upon an avoidance of technical complexity and high Capital Cost LIGNITE SOURCED POWER GENERATION LIGNITE POWERING THE NATION © SRK Consulting (UK) Ltd All rights reserved.

Take Away Statement Pakistan will need to consider the following:  At least in the first ten years of production, the production model, in the opinion of SRK, should be for:  Low capital cost, truck, shovel and bulldozer operations for both stripping operations, mining of coal, and waste dump handling.  Minimise coal handling and processing by feeding directly to mine site power stations.  Consider use of expert mining contractors to bring the required expertise not currently located in-country.  This should be supported by development of training facilities to develop both local expertise and a local labour pool. LIGNITE SOURCED POWER GENERATION LIGNITE THE LOW COST MEANS TO POWER GENERATION SUPPORTING GROWTH OF THE ECONOMY © SRK Consulting (UK) Ltd All rights reserved.

Take Away Statement COPYRIGHT AND DISCLAIMER Copyright (and any other applicable intellectual property rights) in this document and any accompanying data or models is reserved by SRK Consulting (UK) Limited ("SRK") and is protected by international copyright and other laws. This document may not be utilised or relied upon for any purpose other than that for which it is stated within and SRK shall not be liable for any loss or damage caused by such use or reliance. In the event that the recipient of this document wishes to use the content of this document in support of any purpose beyond or outside that which it is expressly stated or for the raising of any finance from a third party where the document is not being utilised in its full form for this purpose, the recipient shall, prior to such use, present a draft of any report or document produced by it that may incorporate any of the content of this document to SRK for review so that SRK may ensure that this is presented in a manner which accurately and reasonably reflects any results or conclusions produced by SRK. The use of this document is strictly subject to terms licensed by SRK to its client as the recipient of this document and unless otherwise agreed by SRK, this does not grant rights to any third party. This document shall only be distributed to any third party in full as provided by SRK and may not be reproduced or circulated in the public domain (in whole or in part) or in any edited, abridged or otherwise amended form unless expressly agreed in writing by SRK. In the event that this document is disclosed or distributed to any third party, no such third party shall be entitled to place reliance upon any information, warranties or representations which may be contained within this document and the recipient of this document shall indemnify SRK against all and any claims, losses and costs which may be incurred by SRK relating to such third parties. © SRK Consulting (UK) Limited 2011 © SRK Consulting (UK) Ltd All rights reserved. Take Away Statement