Trip Report from CERN and Wendelstein W7-X October 6 – 13, 2007 Michael Viola; Steve Raftopoulos; Bill Sands October 6-10 CERN Geneva, Switzerland October.

Slides:



Advertisements
Similar presentations
An Axtrusion Based Lathe
Advertisements

Access BDD Survey School
C2 to C5 fit up review-R41 Review of MC Type C to C assembly clearances with C2 to C5 shell surface interface details 12/19/06 Rev 4.
RockOn! Canister Integration RockOn! 2009.
Weld Geometry A-B Flange:A Possible Alternate to the Extended Shim/ Double Fillet Weld For welds with overlaps – consider the above to make TIG welding.
Mig Welding Presentation, Pictures, Graphics and Content Produced by: Terrance K. Orr M.Ed. Assistant Professor Collision Repair Technology Utah Valley.
Reduced Vertical Separation Minimum (RVSM)
MTF SLIT COMPONENTS Adjusting Blocks and Mounting Plate Steel Blocks
Pre-alignment solutions applied to girders 1/19 Sylvain GRIFFET, 06/07/2010.
Build a Thermometer Screen Design and Technology – Thermometer Screen Project Name___________ Date ___________.
Prepared using support of U.S. Department of Energy under Contract No. DE-AC02-76SF00515 by the Stanford Linear Accelerator Center, Stanford, California.
Metrology for NCSX Steve Raftopoulos and the NCSX Metrology Team.
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
Weld Types – Butt Joint with Backing
Chamber Calibration Bench Status Barrel Muon Alignment Group 9 April 2003, J MocholíWorkshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy.
Bilan du contrat Renco Piping contract F467 TS workshop Archamps Mai 25 th 2005 R. Principe TSCV.
S D Laser Scanning of Acropolis of ATHENS. 3D scanning of the Wall and the Rock of Acropolis Athens and 3D model creation.
EMDM Monolithic suspension development Activity plan Piero Rapagnani Detector meeting
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
The PowerPoint covers the effects of setting a machine to suit a metal thickness. Note other factors also come into play: TATRO CHSE 2012.
Photogrammetry at WENDELSTEIN 7-X Unternehmung WENDELSTEIN 7-X Max-Planck- Institut für Plasmaphysik Torsten Bräuer1Meeting with NCSX, Greifswald,
© 2012 MISTRAS GROUP, INC. ALL RIGHTS RESERVED. DISSEMINATION, UNAUTHORIZED USE AND/OR DUPLICATION NOT PERMITTED. TankReporter 2.0 A Step by Step Example.
1 Stage 3 Peer Review October 26, 2006 T. Brown. 2 Field Period Assembly (FPA) 1.Make sure the requirements for the tooling is well defined (including.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
TPO Lap Splicing Lap Splicing Lap splicing on a TPO system is defined as joining two separate sheets, by way of heat welding, into one monolithic sheet.
1 Dimensional Control for the National Compact Stellarator Experiment R. Ellis, A. Brooks, T. Brown, W. Reiersen, S. Raftopoulos, B. Stratton Presented.
PETS EuCARD. Present status and precision assembly L. Sánchez, F. Aragón, J. Calero, J.L. Gutiérrez, E. Rodríguez, F. Toral, CIEMAT 26/10/2011.
1 NCSX Modular coil winding pack To shim or not to shim? NCSX WBS 1 Engineering Meeting July 7, 2004 What is requirement? What is baseline winding pack.
Comments from Rob Durham’s Visit September 24-25, 2007.
Status of the Alignment 17/12/04 Dario Autiero. Measurements taken so far: 13/9 TT8 On the mounting arch 12/11 TT7 Standalone in the target 19/11 TT7.
Shear Problem Defined There are no bolts on the inboard side of the coil structure to account for shear forces. Bottom Line: friction alone will not prevent.
NCSX VACUUM VESSEL PL Goranson Thermal Insulation Final Design Review July 31, 2006 WBS12 NCSX.
Metrology Milestones Metrology Task Force –Vacuum vessel manufacture - P. Goranson –Mod. Coil Form manufacture - D. Williamson –Mod. Coil winding- S. Raftopoulos.
Commodity Node Procurement Process Task Force: Status Stephen Wolbers Run 2 Computing Review September 13, 2005.
CLIC survey and alignment 1 CLIC CES meeting STARTSLIDE CLIC SURVEY AND ALIGNMENT Hélène MAINAUD DURAND.
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
NCSX Field Period Assembly (FPA) Operations, Cost and Schedule, Staffing, and Metrology Utilization Mike Viola Field Period Assembly Manager NCSX FPA Peer.
11/2/2005Mike Viola1 November Lehman Review November 2, 2005 NCSX VVSA NCSX Vacuum Vessel Fabrication Major Tool and Machine – S F 3 120° segments.
Financial Management and Budgeting The Details. What Is a Budget? A useful tool for keeping track of funds. A useful tool for keeping track of funds.
1 NCSX WBS HANDLING/SUPPORT UPDATE PLG 7/23/03 STATUS Study is for 120 degree VVSA field period assembly. Vessel Installation Support Concept.
NCSX Field Period Assembly (FPA) Operations, Cost and schedule, staffing, and metrology utilization Mike Viola Field Period Assembly Manager NCSX FPA Peer.
NCSX NCSX Trim Coil Peer Review 11/6/07 1 Tom Brown Art Brooks Raki Ramakrishnan Mike Kalish NCSX Trim Coil Peer Review.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
SC Project Review of NCSX, April 8-10, 2008 NCSX Field Period Assembly Mike Viola NCSX Field Period Assembly Manager NCSX Project Review April 8-10, 2008.
Photogrammetry Review Raphael Goudard Visit Nov 27 – Nov 30.
SC Project Review of NCSX, April 8-10, 2008 NCSX Machine Assembly E. D. Perry.
1 Stellarator Core Metrology issues NCSX WBS-1 Meeting April 2, 2003 What are we measuring? When? How do we take the measurements? How do we correlate.
1 Assembly Tooling PU Workshop on NCSX Cost & Schedule Princeton Plasma Physics Laboratory Princeton, NJ Mar 1-4, 2007 T. Brown Princeton Plasma Physics.
DRAFT Cost and schedule, staffing, metrology utilization 10 AM October 12, 2006 Mike Viola Field Period Assembly Manager.
Thanks to Tom Bockman, of Prescott, Arizona who created this slideshow.
NUMI MINOS MINOS Far Detector Installation & Commissioning Jeff Nelson MNHEP DoE Visit September, 2002.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
12/19/2006Mike Viola1 December Lehman Review December 19, 2006 Mike Viola Field Period Assembly Manager NCSX Field Period Assembly + + =
1) News on the long scale length calibration 2) Results of the two surveys performed on plane 7 Set 1: morning of 12/11/2004 Set 2: morning of 19/11/2004.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
Service channels between Tracker and PP1
VELO Metrology CERN Metrology Lab (EST/MF)
Control Blade Design and Fabrication Improvements using Laser Welding
Weld Types – Butt Joint with Backing
Torsten Bräuer and the Metrologyteam
Welds in the magnet system
On the accuracy of port assembly at Wendelstein 7-X
Robert Pushor, Catherine LeCocq, Brian Fuss, Georg Gassner
University of Wisconsin at Madison
Simplified Procedure Draft
Presentation transcript:

Trip Report from CERN and Wendelstein W7-X October 6 – 13, 2007 Michael Viola; Steve Raftopoulos; Bill Sands October 6-10 CERN Geneva, Switzerland October Wendelstein W7-X, Greifswald Germany

CERN Paparazzi Metrology – “Bill Sands” Discussed Metrology Met with Christian Lasseur and Raphael Goudard –Photogrammetry improves with increased number of pictures taken with less than 60 degree field of view –Should fill Frame with target but not to edge –Must cover at least 10 pixels of the CCD –Should turn camera on side and upside down often to allow software to compensate aberation errors. –Should take absolute minimum of 9 photos –Should have 1/3 overlap –Distance between camera stations 2/3 of the recorded distance –If b = 2/3 * 2.8 * 2.1 then uncertainty ~ mm Best achievable is.23 mm (offset of.019 mm) –Choice of reflectors center sizes 12, 15, 40 mm

Metrology

CERN Discussed Welding –Met with three: Gil, Stefano, Michelle –MIG is far better for distortion –Weld from center to outside of each stringer –Weld alternate from center then left right; right left

CERN Discussed Welding –An example of a 10mm plate is to the left with three passes of MIG. Note little distortion and excellent fusion

CMS

W7- X Welding

Wendelstein W7-X Welding Welding Equipment –MIG with active CO2 cooling of surface –NEW patented narrow gap weld tip for MIG –PT Drive improves feed Procedure –Weld from center to outside –Alternate from center out –Narrow GAP technique –Adjust weld to allow for narrow gap head Comments –Our TIG procedure: Way too many passes as a result of too small wire –.4mm (3/32”) = 7 passes –Should use 1.6 mm wire = 3 passes (much less heat) –Check opportunity for pre-deforming or clamping along longitude if possible –Distortion realized is >75% from root weld and complete when 50% of weld is finished

Wendelstein W7-X Welding Welding Recommendations Equipment –MIG with active CO2 cooling of surface –PT Drive improves feed –NEW patented narrow gap weld tip for MIG Procedure –Weld from center to outside –Alternate from center out –Narrow GAP technique –Adjust weld to allow for narrow gap head Comments –Use very experienced and well qualified welders. –It takes two 3 week periods to qualify even a good welder to perform reasonable Stainless steel MIG welds. –Distortion realized is >75% from root weld and complete when 50% of weld is finished –Welds configuration must be qualified with samples and pull tests 5 mm 6 mm 11 mm

Wendelstein W7-X Metrology Photogrammetry –Torsten, head of W7-X metrology and Bob Brade head of JET metrology. –Presentation compares difference between LTD and Photo LTD –R=40 m –ADM provides 10 microns + 50 microns –No loss for ADM really since encoders dominate error Photo –R=5 m –Uncertainty 0.2 mm

Wendelstein W7-X Metrology Laser Tracker Used for most of the work –Take three complete for each measurement After scans they then pick best one of the three to use.

W7- X

W7- X Metrology

Wendelstein W7-X NCSX Status review General comments W7-X metrology grew in 2 ½ years Karl’s Assembly control division had three planners at top for Status review Are shims qualified? Was flexibility of the coils a recent find? Having shims and bushings are overkill and raise cause for suspicion of design and questions. Add the risk of tooling not working after commissioning Tooling for installing ports from underneath –can Ports be installed with vessel supports in place TF Coil installation and stability of field period assembly as we add components TF and PF supports will likely cause distortion. –How is it compensated? Guys are so busy doing day to day tasks that there isn’t time to design the future needs The design of station 5 and 6 is of done so how can a review say confidently that the design cost and schedule can be met?

Wendelstein W7-X NCSX Status review Status review Once you do a bottom up estimate, you must make milestones based on final date back Did we meet all milestones to date? Contracts –How long did it take to provide similar structures? –Why should review team believe that new contracts are shorter [sanity check of similar tasks.] All prototyping must use same materials; same configuration; same procedures Have the design all been well defined (Stations 5 and 6) – wave of hand that it is just simple is not enough !!Station 5 and 6 are too rough!! Talk about the risks in the technique and have a plan B Understand all risky operations and have them accounted for. A technical review needs to dissect the assembly steps Formulate work to deal with remaining risky activities –Design, material, interferences, schedule –Allow for repairs Knoxville planning showed too many tasks in parallel responsible by same people. Must also provide an explanation of plan B for either risky tasks OR not well defined work If station 3,5,6 additional time were based on station 2 actual experience it would be more convincing. Allow for don’t know problems or missing designs Promote pessimism