Customer: Fermin Reyegadas, Fundacion Cantaro Azul Faculty Mentor: Sarah Brownell Background: Cantaro Azul is a non-profit dedicated to helping people.

Slides:



Advertisements
Similar presentations
Getting Started with the EELD601 After you remove your EELD601 from the box, check to make sure you have all accessories shown below. Click here for next.
Advertisements

Engineer Training XL1200 Pneumatics. Engineer Training XL1200 Pneumatics Confidential 2 Working Concept Overview: The Pneumatic System is comprised of:
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
Engineer Training XL1200 Ink System. Engineer Training XL1200 Ink System Confidential 2 Ink System The XL1200 Ink System consists of the following elements:
HYDRAULICS & PNEUMATICS
Unit Ten Directional Control Valves
Getting Started Product Description Setting Parameters How does it work Wiring Diagram.
Heating Control Devices
Trouble - Shooting ELR - Electric Latch Retraction.
Experiment 8 : Minor Losses
Power-Fill Operation Demonstration Power-Fill Operation Demonstration (See Installation and Operation Manual for detailed instructions)
AccuMax Single Point Injection Operation (See Installation and Operation Manual for detailed instructions)
Copyright © by Circle “B” Inc All Rights Reserved
Definition and choice system for maintenance with water the population of small village Submitted by: Pavel Kostyuk Student, WR227 December 6, 2004 (
By Dr. Ahmed Mostafa Assist. Prof. of anesthesia and I.C.U.
Actuators.
Electrical Power Systems
2001, 2002 & 3012 Series Operation 2001, 2002 & 3012 Series Operation (See Installation and Operation Manual for detailed instructions)
Abstract In 2008 President Geoffrey introduced the Live green program which called for environmentally conscious living. In light of this initiative, it.
Gas Furnace Controls Part 2.
AccuMax Multi-Point Injection Mechanics
Hydronic Mechanical Controls
Hydraulics For The Long Term
Series Operational Training. 2 Water Tank Water Pump Multiple Discharges 2000 Series Line Strainer Foam Tank Electronic Direct Injection Proportioner.
Overview of the 1.
Electro-Pneumatics Module 1
HVAC523 Circulator Pumps.
INDUSTRIAL ELECTRONICS CONTROL EET425/4 Lecturers Indra Nisja School of Electrical System Engineering Northern Malaysia University College of Engineering.
Burners TRAining CEntre. RESIDENTIAL GAS BURNERS R D B R D B series GOALS: KEEP STRONG OUR POSITION ON RESIDENTIAL GAS BURNERS DEDICATED TO OEM’s MARKET.
Your Connectivity Partner. Locations Main Office: High Tech Products Lallio, Italy USA Office: HTP Connectivity Parsippany, NJ.
Balancer Operation Intelift Operation Installation Troubleshooting Preventive Maintenance Preventive Maintenance OVERVIEW.
Engineer Training Pneumatic System Overview. Engineer Training Confidential 2 Working Concept Overview: The Pneumatic System is comprised of:  Y Pistons.
Welcome to Electric Dept. Rajkot Division. How MCB works.
Experts in Chem-Feed and Water Treatment beta Metering Pumps 1.
HYDRAULICS & PNEUMATICS
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
18240 Element two - Components INPUTS OUTPUTS PURPOSE TYPICAL USE.
Circuits and components Unit 45 Dr. Hatem Elaydi Engineering Technical English Islamic University of Gaza April 6, 2016.
Moisture Controlled Irrigation System Team Members: ECE - Aaron Beekman, Adrian Fletcher, and Derek Thomas CECS – Jacob Schreiver.
National Diploma Mechanical and Electrical Services Construction Cold Water Supplies.
INTRODUCTION TO ELECTRONIC INSTRUMENTATION Chapter 11 INTC 1305 – 01 CONTROL VALVES AND REGULATORS Vern Wilson.
Double Acting Cylinder
OBJECTIVES Explain how the noncompressibility of liquids is used in brakes Explain how hydraulic force can be used to supply high pressures to each individual.
Electronic Control Systems Week 3 – Switches and Sensors
PNEUMATIC CIRCUITS.
Unit 45: Circuits and components Dr
Circuits and components Chapter 45
Unit 45: Circuits and components Dr
Light Detection Circuit
Logic Functions Pneumatics Module 7.
Hemodialysis Lecture 3.
OBJECTIVES Describe the operation of a pressure-differential switch and a brake fluid level sensor switch. Describe the operation of a residual check valve.
PRESENTATION ON SUMMER TRAINING PROGRAM
Staying in Compliance: Spill and Overfill
Actuators & Directional Control Valves
FIGURE 22-1 Bulbs that have the same trade number have the same operating voltage and wattage. The NA means that the bulb uses a natural amber glass ampoule.
FIGURE 22-1 Bulbs that have the same trade number have the same operating voltage and wattage. The NA means that the bulb uses a natural amber glass ampoule.
T-6B On-Board Oxygen Generation System (OBOGS)
Industrial Electronics
Slip-in Cartridge Valves
Hanmer Springs Water Supply
Flotection: Building Main Shutoff System
Active Reciprocating Compressor Valve Assembly P16452
Unit 45: Circuits and components Dr
Hydraulic Ram for Fuel-free Water Lifting
Actuators & Directional Control Valves
Introduction to Electro-pneumatic
T-6B On-Board Oxygen Generation System (OBOGS)
FOAMPRO 2001 / 2002 Pump Panel. FOAMPRO 2001 / 2002 Pump Panel.
Presentation transcript:

Customer: Fermin Reyegadas, Fundacion Cantaro Azul Faculty Mentor: Sarah Brownell Background: Cantaro Azul is a non-profit dedicated to helping people in Mexico access safe drinking water. They provide a community scale ultraviolet disinfection system called the Kiosko Azul to communities in need of water treatment. Problem: The purpose of this project is to create a system that will first detect failure in the UV chambers. Then signal a safety valve to stop the gravity fed contaminated water supply while simultaneously signaling the operator, both visually and audibly, that the system has suffered that failure. Concept Selected: -A photo-diode was installed in each chamber to detect the level of UV output, see Figure 7 -If the UV output falls below an acceptable threshold the safety system is triggered -The electro-mechanical valves chosen are Weathermatic 12024E-10-H irrigation valves, see Figure 2 -The valves seal by the use water pressure on a diaphragm -Once solenoids are activated the pressure is released, see Figure 2 for exploded view -Valves fail closed and are relatively low cost -The warn operator system consists of LEDs and sirens for multiple sense warning -These will be mounted in a high visibility location, see Figure 3 -Red LED and speaker: System has failed, see Figure 5 -Green LED: Failure has been fixed ready for system restart, see Figure 5 -For the operators convince, switches are installed to deactivate the sirens once they realize the system has failed -The ball valves, shown in Figure 2, are a operator interface to prevent premature flow while the UV bulbs heat up to a germicidal UV output Figure 2: Dual irrigation valve assembly: “Safety Valve System” Major Constraints: -For proper sterilization, the water must be exposed to the UV irradiance, on average for 20 seconds, this yields a volumetric flow rate of liters per minute -Mechanical controls consist of pipe diameter (1/2” PVC) and overall head (~1.5 meters) -Correlation between UV output and voltage output form photo-diode -Use of long life parts or parts that would be available at a local hardware store. -UV chamber independence -If one chamber fails it should not impede the actions of the other chamber Test Rig/Procedure: -Figure 3 illustrates the test rig created to simulate the kiosk used in Mexico -The “Contaminated water supply” simulates the reservoir on the roof of the kiosk in Figure 1 -The water is gravity fed, approximately 5 ft, to the “Safety Valve System” -The flow is split, (see Figure 2), since this is a dual chamber system, to test chamber independence -Figure 6 illustrates the cross-section of the solenoid -Activated: the electro-magnet retracts the piston, releasing water pressure -Deactivated: a spring extends piston, preventing pressure release -The water ascends and enters the top of the UV chambers; for a more controlled flow through the chambers -The chambers then empty into the “Clean water exit” -A push button/dimmer switch was installed at the very back of the test rig to control the PCB and UV chambers -Push Button: simulates power outage and incomplete circuit related failures -Dimmer: simulate a typical brown-out Figure 3: Kiosk simulating test rig Results: -Valves do not impede volumetric flow of treatment system -Flow is 4.5 liters per minute with a tank depth of 10 inches and overall height difference of 4 feet, which is within the constraint of L/min -PCB successfully cuts power to the solenoids and activates the alarm system which is highly noticeable to the operator -Brown outs were deemed negligible since a brown out has little effect on the UV lights -A ballast is used to supply consistent power to the UV bulb as long as there is sufficient energy inputs, if not the bulb is deactivated -Once the operator realizes the system failure they must close the manual ball valves located just before the irrigation valves -This is to ensure that when power is restored, the UV bulbs have sufficient time to heat up to proper UV output before contaminated water is allowed through the chamber again -To allow for chamber independence a separate PCB, power supply and valve system is needed for each UV chamber Figure 4: Printed Circuit Board (PCB) Figure 6: Solenoid cross-section ( ex.cfm?page=Downloads) Team from left to right: Tyler Josselyn (ME), Evan Hall (EE), Phil Floroff (EE), Matt Switzer (ME, Team Lead). Figure 1: Kiosk in Mexican village Figure 5: Operator interface with alarm Figure 7: Photo-diode position in UV chamber