Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Advertisements

RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Manual Flo-tap Installation Instructions
Compression Fittings Internal nut type. Compression fittings Rugged and durable. Firm joint using all brass construction For use with plastic and metal.
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
"AIR COOLER" Heat Exchanger
STOPKIT Test - Ø14” & Ø6” Pipe Spools Set up 14”Ø Pipe 6mm Hole at Plain Pipe6”Ø Elbow 4mm Hole at Weld Heat Affected Zone Note:- Both pipe spools were.
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Non-welded Window Option Edgar L. Black IIT August 15,2003.
TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
Stator Plan & Schedule Chris Booth 2 nd March stators to construct for mid-April. One complete coil assembly recovered from ISIS drive. Coils recoverable.
Status of the MuCool Cavity Prototype Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 21, 2005.
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
Improvements for next parts PIMS production meeting February 2013 Rolf Wegner.
Aluminum bellows for experiments
ENGINEERING DESIGN AND FABRICATION OF PETS V. Soldatov¹, D. Gudkov¹, I. Syratchev², A. Samoshkin¹, G. Riddone², A. Olyunin¹, S. Atieh² 1 – JINR, Dubna,
First TBL PETS prototype tank development D. Carrillo, E. Rodríguez, F. Toral, CIEMAT N. Chritin, S. Doebert, I. Syratchev, CERN CERN, 24/01/2008 Courtesy.
MICE Target Mechanical Design l Contents »Status of modelling and drawing »Work being undertaken at RAL on shaft and bearing prototypes »Procedure for.
Office of Science Coupling Coil Status S. Gourlay August 1, 2012.
PETS EuCARD. Present status and precision assembly L. Sánchez, F. Aragón, J. Calero, J.L. Gutiérrez, E. Rodríguez, F. Toral, CIEMAT 26/10/2011.
RFQ Fabrication Plan, Schedule and QC PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Steve Virostek - Engineering Division Lawrence Berkeley.
Engineering Department ENEN Status of TCSP manufacturing Collimation Working Group (CWG) 24 June 2013 A. Dallocchio, A. Bertarelli, F. Carra, L. Gentini,
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
1.3GHz Input Coupler for ILC
NEW FAST WIRE SCANNER Manufacturing review Emilien Rigutto
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
Manufacturing process, validation and factory test
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
SWRI C13 Filter base mods for aux cooling system Stand Photo J McCord April 1, 2005.
Task List for Phase II Rotatable Collimator Project at SLAC 30 January 2007 CERN/LARP Video Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
 =1 cavity: parameters Dimensions for cavity fabrication before any chemical polishing and at room Temp. outer ½ cell pick-up side inner ½ cells outer.
ELENA EXTRACTION LINES W. Bartmann, D. Barna, M. Fraser, J. Jentzsch, R. Ostojic ELENA Commissioning discussion, 23th November, 2015.
S. Atieh EN-MME Manufacturing R&D for SPL β =1 cavities at CERN on behalf of the SPL cavities mechanical design and manufacturing team.
TD26CC PLANS FROM CIEMAT Laura Sánchez on behalf Electrical Engineering Group of CIEMAT.
HiLumi-LHC/LARP Crab Cavity System External Review – May Work partly supported by the EU FP7 HiLumi LHC grant agreement No and by the.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
ESS DTL: Prototyping M.Comunian - F. Grespan – P. Mereu Lund– 10/04/2013F.Grespan.
MICE Prototype Coupling Coil Cooling Circuit Design Dan Cheng Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Internal Guide : Batch No : 4 Mrs.Punyavathi Madam
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
Fabrication of LHC cavities at CERN N. Valverde Alonso, G. Favre,T. Tardy, F. Pillon, R. Claret, S. Mastoura, E. Rigutto,J. Geisser
Engineering of the power prototype of the ESRF HOM damped cavity* V. Serrière, J. Jacob, A. Triantafyllou, A.K. Bandyopadhyay, L. Goirand, B. Ogier * This.
SPS High Energy LSS5 Thermal contact & cooling aspects
Results of short module and qualification strategy
Stator Plan & Schedule Chris Booth 2nd March 2009
Grzegorz Wrochna, PIMS kick-off CERN
Service channels between Tracker and PP1
MICE Target Mechanical Design
Quality Control in Straw Production
Complementary ISTC Projects #3888, 3889p
Teleconference ACS – FREIA 18th April 2017
Flexible lines production and planning
Cryostat design Mechanical design: Thermal screens: Specifications:
Flexible lines assembly
TIDVG-4 TIDVG-4 Dump assembly, welding and installation Process sector BA1 February 2017 J. Humbert, (EN/MME) 06/02/2017 J. Humbert, EN-MME.
Far Detector Activities Late 2017 – Early 2018
Update on development of consolidated insulation system and procedures C. Scheuerlein, 4th DISMAC meeting,
HIE-LINAC status report
Phase II Collimators : design status
Challenges and Deadlines for Production
UPPSALA UNIVERSITY_GERSEMI PROJECT
SC1R Cold Box PDR Assembly Sequence
Presentation transcript:

Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS prototype

Tuesday, November 16, 2010G. Favre EN/MME2 Construction sequence for standard rings type 3

Tuesday, November 16, 2010G. Favre EN/MME3 Table 1: Construction sequence for standard rings type 3 (1/2) pieces p. cav. drawing numbersequenceresponsibility/task sub parts 4SPLACPMT0001Tuner port machining (this part integrates a backing support designed to receive the welding root) IPJ - task 1 4SPLACPMB0037Flange rough machining, stabilization, final machining IPJ - task 1 4SPLACPMT0002Vacuum brazingIPJ - task 1 main parts 4SPLACPMT Ring rough machining (+1 mm)IPJ - task 1 2. Milling of port apertures according to the requirements by FZJ IPJ - task 1 3. CleaningIPJ - task 1 4. Packing and transport of rings and port tubes to FZJ IPJ - task Welding of port tubesFZJ - task 2 6. Leak test of portsFZJ - task 2 7. Packing and transport to IPJFZJ/IPJ - task 2

Tuesday, November 16, 2010G. Favre EN/MME4

Tuesday, November 16, 2010G. Favre EN/MME5

Tuesday, November 16, 2010G. Favre EN/MME6

Tuesday, November 16, 2010G. Favre EN/MME7 + 2 mm - 2 mm Rough machining: oversize + 1 mm

Tuesday, November 16, 2010G. Favre EN/MME8

Tuesday, November 16, 2010G. Favre EN/MME9 pieces p. cav. drawing numbersequenceresponsibility/task main parts SPLACPMB Port backing support machiningIPJ - task 3 9. X-ray testingIPJ – task Leak test of portsIPJ - task 3 SPLACPMB Ring final machiningIPJ - task CleaningIPJ - task Metrological reportIPJ - task Packing and transport to CERNIPJ - task 3 Table 1: Construction sequence for standard rings type 3 (2/2)

Tuesday, November 16, 2010G. Favre EN/MME10

Tuesday, November 16, 2010G. Favre EN/MME12 Construction sequence for pick-up rings

Tuesday, November 16, 2010G. Favre EN/MME13 Table 2: Construction sequence for pick-up rings (1/2) pieces p. cav. drawing numbersequenceresponsibility/ tasks sub parts 2SPLACPMT0001Tuner port machining (this part integrates a backing support designed to receive the welding root) IPJ - task 1 2SPLACPMB0037Flange rough machining, stabilization, final machining IPJ - task 1 2SPLACPMT0002Vacuum brazingIPJ - task 1 2SPLACPMT0003Pick-up port machining (this part integrates a backing support designed to receive the welding root) IPJ - task 1 2SPLACPMB0038flange rough machining, stabilisation, fine machining IPJ - task 1 2SPLACPMT0002, SPLACPMT0004 Vacuum brazingIPJ - task 1

Tuesday, November 16, 2010G. Favre EN/MME14

Tuesday, November 16, 2010G. Favre EN/MME15

Tuesday, November 16, 2010G. Favre EN/MME16

Tuesday, November 16, 2010G. Favre EN/MME17

Tuesday, November 16, 2010G. Favre EN/MME18

Tuesday, November 16, 2010G. Favre EN/MME19

Tuesday, November 16, 2010G. Favre EN/MME20 Table 2: Construction sequence for pick-up rings (2/2) pieces p. cav. drawing number sequenceresponsibility/ tasks main parts 21. Ring rough machining (+1 mm)IPJ - task 1 SPLACPMT Milling of port apertures according to the requirements of FZJ IPJ - task 1 3. CleaningIPJ - task 1 4. Packing and transport of rings and port tubes to FZJ IPJ - task Welding of port tubesFZJ - task 2 6. Leak test of portsFZJ - task 2 7. Packing and transport to IPJFZJ/IPJ - task 2 SPLACPMB Port backing support machiningIPJ - task 3 9. X-ray testingIPJ – task Leak test of portsIPJ - task 3 SPLACPMB Ring final machiningIPJ - task CleaningIPJ - task Metrological report (the ring shall be unclamped to carry out the measurements) IPJ - task Packing and transport to CERNIPJ - task 3

Tuesday, November 16, 2010G. Favre EN/MME21

Tuesday, November 16, 2010G. Favre EN/MME22

Tuesday, November 16, 2010G. Favre EN/MME23 Construction sequence of central ring type 4

Tuesday, November 16, 2010G. Favre EN/MME24 Table 3: Construction sequence of central ring type 4 pieces p. cav. drawing numbersequenceresponsibility Sub parts 1SPLACPMB0025square flange: rough machining, stabilization, final machining IPJ - task 1 1SPLACPMB0026tube machiningIPJ - task 1 1SPLACPMB0027pick-up tube machiningIPJ - task 1 1SPLACPMB0028fitting elbows machiningIPJ - task 1 1SPLACPMB0029nipples machiningIPJ - task 1 1SPLACPMB0037flange rough machining, stabilisation, final machining IPJ - task 1 1SPLACPMB0038flange rough machining, stabilisation, final machining IPJ - task 1

Tuesday, November 16, 2010G. Favre EN/MME25

Tuesday, November 16, 2010G. Favre EN/MME26

Tuesday, November 16, 2010G. Favre EN/MME27

Tuesday, November 16, 2010G. Favre EN/MME28

Tuesday, November 16, 2010G. Favre EN/MME29

Tuesday, November 16, 2010G. Favre EN/MME30

Tuesday, November 16, 2010G. Favre EN/MME31

Tuesday, November 16, 2010G. Favre EN/MME32 Table 3: Construction sequence of central ring type 4 pieces p. cav. drawing numbersequenceresponsibility Main parts 1SPLACPMT Ring rough machining (+1 mm)IPJ - task 1 2. CleaningIPJ - task 1 3. Stabilisation (heat treatment)IPJ - task 1 SPLACPMT Ring rough machining (+0.5 mm)IPJ - task 1 5. CleaningIPJ - task 1 6. Stabilisation (heat treatment)IPJ - task 1 SPLACPMB Ring final machiningIPJ - task 1 8. CleaningIPJ - task 1 9. Metrology (the ring shall be unclamped to carry out the measurements) IPJ - task 1 SPLACPMB Brazing of ports, fitting elbows, nipples and square flange IPJ - task Leak testIPJ – task Water pressure testIPJ – task MetrologyIPJ – task Packing and Transport to CERNIPJ - task 3

Tuesday, November 16, 2010G. Favre EN/MME33

Tuesday, November 16, 2010G. Favre EN/MME34

Tuesday, November 16, 2010G. Favre EN/MME35

Tuesday, November 16, 2010G. Favre EN/MME36

Tuesday, November 16, 2010G. Favre EN/MME37

Tuesday, November 16, 2010G. Favre EN/MME38 Construction sequence of central disc type 1, type 3 and & disc type 3

Tuesday, November 16, 2010G. Favre EN/MME39 Table 4: Construction sequence of central disc type 1, type 3 and & disc type 3 pieces p. cav. drawing numbersequenceresponsibility 21. Disc rough machining including coupling slots (all +1 mm) IPJ - task 1 2. Drilling of cooling circuitsIPJ - task 1 3. Installation of temporary threaded plugs to protect cooling circuits during final machining and cleaning IPJ - task 1 4. Final machiningIPJ - task 1 5. CleaningIPJ – task 1 6. Leak test of cooling circuitsIPJ – task 1 7. Pressure test of the cooling circuitsIPJ – task 1 8. Metrology control (the disc shall be unclamped to carry out the measurements) IPJ - task 1 9. Packing and Transport to CERNIPJ - task 3

Tuesday, November 16, 2010G. Favre EN/MME40 Rough machining: oversize + 1 mm

Tuesday, November 16, 2010G. Favre EN/MME41 Rough machining: oversize + 1 mm