ATF2 quads status 22Nov05- Cherrill Spencer 1 Status Report on the Design and Fabrication of 29 quads for ATF2 By Cherrill Spencer, SLAC, for ILC-BDS weekly.

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

IHEPTrip Cherrill Spencer 12/20/05 1 Report on my December 2005 Trip to IHEP, Beijing to Monitor Fabrication of ATF2 Quads By Cherrill Spencer, SLAC, for.
UPDATE of RFCC MOUDLE Derun Li, Steve Gourlay Lawrence Berkeley National Laboratory MICE MICO Meeting December 21, 2011.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
1 Warm Magnets Work Package Status J. Bauche, TE-MSC Technical Meeting, 9th January 2014.
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
TD/MSD TORUS CMM PRODUCTION: OVERVIEW G. Velev Clas12 Torus CCM Production Readiness Review –Dec 4, 2013.
INTRODUCTION to the DESIGN and FABRICATION of IRON- DOMINATED ACCELERATOR MAGNETS Cherrill Spencer, Magnet Engineer HOMEWORK PROBLEM for Lecture # 2 of.
Ans Pardons 30/11/2006CNGS Reflector Technical Review CNGS reflector: Status Work remains to be done… 30/10 Introduction Drain connection Event analysis.
ATF2 Magnets Summary of the Session on Magnets, Movers and Magnet Installation. ATF2 5 th Project Meeting, at KEK Cherrill Spencer, Magnet Designer and.
Magnet designs for Super-FRS and CR
ATF2 Magnets ATF2 Magnets 21 Mar 2007Cherrill Spencer, SLAC. Progress & Plans: ATF2 Magnets 1 Progress Report & Future Plans for the ATF2 FD Quads, FF&FD.
ATF2 Magnets ATF2 Magnets KEK, 19 Dec 2006Cherrill Spencer, SLAC ATF2 Mag Design & Production 1 Design and Production Status of New ATF2 Magnets Cherrill.
Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status Paul Brindza January 26, 2009.
ATF2 Magnets ATF2 Magnets 3rd July 2007Cherrill Spencer, SLAC. Info on top of FD ATF2quad for D. Urner 1 Information on top of the QC3 style quads that.
ATF2 Magnets ATF2 Magnets 11Mar '08, Weekly MtgCherrill Spencer Status Report ATF2 FD quads 1 Status Report on the ATF2 “Final Doublet” quads being made.
DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17,
M. Gilchriese - April 2001 Disk Sector Status. M. Gilchriese - April Technical Status Three prototypes to current dimensions(8-sector disks) except.
ATF2 Magnets ATF2 Magnets 22 May 2007Cherrill Spencer, SLAC. Progress on New ATF2 Magnets 1 Progress Report on ATF2 New Magnets 22 nd May 2007 Cherrill.
ATF2 Magnets ATF2 Magnets 27/28 Feb 2007Cherrill Spencer, SLAC. Info for QC3 machining discussion 1 Information for discussion about how to enlarge the.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
ATF2Quad Fab & Measurement Status Cherrill Spencer 02/28/06 1 Brief Status Report on Fabrication & Measurement of ATF2 Quads and Spencer’s Trip to IHEP,
STATUS REPORT ON DIPOLE MAGNETS FOR TRANSFER LINE-2 FOR CTF3 22 Jan 2008 S.S. PRABHU, A. K. JAIN & V. C. SAHNI RRCAT, INDORE (INDIA)
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
ATF2 Magnets etc. 1. Magnets 2. Power supplies 3. Magnetic field measurement 4. Movers and supports R. Sugahara May 30, 2005.
A Presentation On Construction Of Turbo Generator
Hi-Lumi Conductor Procurement A.Ballarino, B. Bordini, L. Oberli HL-LHC/LARP International Review of Superconducting Cable for the HL-LHC Inner Triplets.
Long Quadrupole – G. Ambrosio 1 LARP Collaboration Meeting – FNAL, Oct , 2008 BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio LARP Collaboration.
19 Dec 2007Water manifolds for FD magnets 1 Installation Questions abut the cooling water manifolds for the FD quads& sextupoles. Questions for Araki,
Cherrill Spencer, SLAC. MDI Workshop Jan '05 1 Impact of Crossing Angle Value on Magnets near the IP Overview of several unusual quadrupole designs that.
SBS Magnet and Support Status Robin Wines June 2013.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
IHEP 打ち合わせ (7/5-7/6) 報告 7/18 ATF2-mag-all への菅原メールより適当に抜粋 7/20 増澤(菅原代理) [IHEP]Jiang Wang, Jiuqing Wang, Cai-tu Shi, Zhaosheng Yin, Xuwei Dai, Yucheng Liu.
ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 1 Status Report on the ATF2 “Final Doublet” magnets: 2.
LARP Collaboration Meeting Racetrack Coil Fabrication
ATF2Quad Fab & Measurement Status Cherrill Spencer 01/31/06 1 Brief Status Report on Fabrication & Measurement of ATF2 Quads By Cherrill Spencer, SLAC,
ATF2 Magnets ATF2 Magnets 2 Oct 2007Cherrill Spencer Info for ATF2 magnet alignment discussion 1 Information on Alignment Issues for ATF2 magnets: for.
MQXFS Coil V1 Fabrication Status -Winding and Curing Miao Yu
Magnets Attilio Milanese Doing Business with CERN
ATF2 Magnets ATF2 Magnets 14 Sep 2007Cherrill Spencer, SLAC. Cooling Solid Wire Sextupoles 1 Report of the effort to cool an old FFTB solid wire sextupole.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
Update: Puck and Gun Magnet March 1, Magnetized Gun 2 K 2 CsSb Preparation Chamber HV Chamber.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
Magnetized Beam LDRD: Design Tasks February 19, 2016.
DDBA magnets Chris Bailey Low emittance rings Sept Frascati.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
Yingshun Zhu Design of Small Aperture Quadrupole Magnet for HEPS-TF
S-BPM Support Issues to be discussed with LAPP and KNU
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
QXF Coil Fabrication & Tooling Reaction / Impregnation
PANAGIOTIS FARANTATOS(TE/MSC-MNC)* WP3, ESR 4: New Magnet
Coil Design and Fabrication
Procurement, Measurement and Installation of 2 Octupoles for ATF
CSP 25th November 2010 Technical agreement number 3: overview
Complementary ISTC Projects #3888, 3889p
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
LARP Phase II Secondary Collimator RC1
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Status of ATF2 FD Magnets and Info on their FFTB supports & mover
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
MICE Coupling Coil Update
Brief Status Report on Fabrication of ATF2 Quads
III. Correction Dipoles MDG Accessories for all Magnets V. Summary
LARP Rotatable Collimators for LHC Phase II Collimation
CNGS horn / reflector in 2005: The story of the glass ring insulator
Budker Institute of Nuclear Physics,
ESS MEBT Quadrupole magnets
Polarized 3He target installation
Presentation transcript:

ATF2 quads status 22Nov05- Cherrill Spencer 1 Status Report on the Design and Fabrication of 29 quads for ATF2 By Cherrill Spencer, SLAC, for ILC-BDS weekly meeting on 22 nd November 2005

ATF2 quads status 22Nov05- Cherrill Spencer 2 ATF2 quadrupoles : QEA-D32T180 Activity from June – September 2005 Are 8 quadrupoles in the extension of the ATF extraction line Are 6 quads in matching section of ATF2 beamline Are 14 quads in final focus section of ATF2 ( aside from QF1&QD0) Decided back in June these 3 sets could all be made from same design. Decided an existing KEK quad called the TOKIN 3390 (“QB4” style) would be basis of the design for the 28 ATF2 quads listed above. Contract signed in early July with the Magnet Shop of the Institute of High Energy Physics (IHEP) in Beijing, China to make new drawings and fabricate 29 quads (1 spare) by March 31 st In July: Spencer wrote very detailed specifications for this quad, new name: QEA- D32T180. Defined precisely the type of materials to be used, the fabrication processes to be followed and the tolerances to be met. Used USA and Japanese standards. Sent some top assembly drawings of TOKIN 3390 to IHEP. August-September: IHEP drew new drawings for all parts and assemblies. IHEP and Spencer negotiated substitute Chinese materials to be used where Spencer could qualify them to her satisfaction.

ATF2 quads status 22Nov05- Cherrill Spencer 3 ATF2 quadrupoles : QEA-D32T180 Activity from September- December 2005 Late September: new drawing package released by IHEP for review. Formal review held by marathon video-conference on 29/ 30th Sept. See examples of new drawings (not yet final) on next slides. October-November : Spencer continues negotiating changes in fabrication processes and materials to accommodate capabilities of IHEP magnet shop and availability of materials, so tight schedule can be met. Mid-Late October: IHEP designing and fabricating coil winding forms October-Late November: IHEP machining first magnet’s 4 steel core pieces Late November: hollow copper conductor due to arrive from Finland Early December: Wind and pot first 4 coils Early Dec.: finish machining 1 st magnet’s poletips with Electric Discharge Machine December 8 th – 14 th Spencer will visit Magnet Shops at IHEP to observe coil winding, potting, core assembly and first magnet’s full assembly. Core will be measured with CMM and other QC tools to check tight tolerances are met. Coils will be tested. December onwards: if 1 st magnet passes all tests Spencer will allow rest of magnets to be fabricated. Magnetic measurements will start in mid-January.

ATF2 quads status 22Nov05- Cherrill Spencer4 3 ). Detail of coil 3. Coil manufacturing NOT FINAL COIL DRAWING: DO NOT USE

ATF2 quads status 22Nov05- Cherrill Spencer5 1). Overview of general assembly: QEA-D32T General Assembly NOT FINAL DRAWING. DO NOT USE 32mm bore 180mm core length 47 turns per water cooled coil Max gradient 55 T/m

ATF2 quads status 22Nov05- Cherrill Spencer6 5. Flow Chart for Manufacture Inspection/measure Manufacture Special procedure Core Cutting Magnetization Anneal Painting Core machining Core Assembling Appearance inspection Size inspection Electric connection Coils assembling Gap inspection Water pressure test Assembly electric test Magnetic measurement Drain water by blow N2 Label and mark polarity and package Delivery/Shipment Outside lead insulation Welding for conductors and water connector blocks and thermal interlock mounting blocks. Conductor cleaning Pre-winding insulation Winding Ground insulation Size inspection Electric measure Impregnation Size inspection& Electric measure Lead Bending Ball test for water route Cleaning Leakage test Coil