CMMI: PROCESS AND PRODUCT QUALITY ASSURANCE Lieven Lemiengre Thomas Spranghers.

Slides:



Advertisements
Similar presentations
Process and Product Quality Assurance (PPQA)
Advertisements

Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
More CMM Part Two : Details.
For internal use Project Management at a glance - the ‘what’ and the ‘how’ Jørgen Nygaard Nielsen Dan Bandsholm Erensø PMD –
Back to Basics David L. Presuhn Manager Configuration Management and Product Definition Integration Boeing Commercial Airplanes.
Copyright 2005 CMMI and ITIL Alison Adams & Kieran Doyle.
Copyright 2003 CMMI: Executive Briefing Presented by Kieran Doyle
CMMI PMC Group Members Inam ul Haq Sajjad Raza Nabeel Azam
PROCESS AND PRODUCT QUALITY ASSURANCE
Capability Maturity Model Integration (CMMI). CMMI Enterprise-wide process improvement framework Focuses on processes for improved product Process areas:
200209–CSSA0001 – 16/27/ :25 PM CSSA Cepeda Systems & Software Analysis, Inc. GENERIC.
Agile Quality Assurance Reference Model Jacob Sandnes 3/23/15.
Process Area : Requirement Management (REQM) By: Amna Rehmat Maria Habib Sana Ahmed.
ESC/EN Engineering Process Compliance Procedures August 2002.
REVIEW AND QUALITY CONTROL
Understanding (and Untangling) Verification and Validation Requirements ISO 9001 vs. CMMI-Dev 1.2.
CS 4310: Software Engineering
VanQ - January 25, 2007© Josip Pajk 2007Page 1 SW Quality Assurance in CMMI ® VanQ meeting January 25, 2007 Josip Pajk.
Capability Maturity Model Integrated
CMMI Course Summary CMMI course Module 9..
Capability Maturity Model Integration
1 The Continuous Representation. 2 UNIT 2 Topics covered in this unit include Additional terminology Practices – The fundamental building blocks Process.
8. CMMI Standards and Certifications
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
Integrated Capability Maturity Model (CMMI)
COMPGZ07 Project Management Presentations Graham Collins, UCL
PMP® Exam Preparation Course
COMPANY CONFIDENTIAL Page 1 Final Findings Briefing Client ABC Ltd CMMI (SW) – Ver 1.2 Staged Representation Conducted by: QAI India SM - CMMI is a service.
1 The Continuous Representation. 2 UNIT 2 Topics covered in this unit include Additional terminology Practices – The fundamental building blocks Process.
CMMi What is CMMi? Basic terms Levels Common Features Assessment process List of KPAs for each level.
Soft Tech Development Inc. 1 Software Project Tracking A CMM Level 2 Key Process Area Soft Tech Development Inc.
Project Monitoring and Control 指導教授:李健興老師 學生:黃麟凱同學 學號: R 學號: R
1 / x Project Planning CMMI Project Planning Jean-Luc Deprez Robin Leblon.
Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.
1 / x Verification CMMI Verification Hendrik van den Berge Kevin Mets.
10/16/2015Bahill1 Organizational Innovation and Deployment Causal Analysis and Resolution 5 Optimizing 4 Quantitatively Managed 3 Defined 2 Managed Continuous.
Software process improvement Framework for SPI SPI support groups, maturity and immaturity models Assessment and gap analysis Education and training Selection.
Quality Activity Matrix Presented by Sandra Toalston President, SanSeek 1.
Adaptive Processes Overview Adaptive Processes©. Adaptive Processes © Adaptive ProcessesSimpler, Faster, Better2 Objective To provide an over view of.
1/18 CMMI Risk Management Jense Seurynck Daan Van Britsom Risk Management.
Managing CMMI® as a Project
Georgia Institute of Technology CS 4320 Fall 2003.
Everything You Ever Wanted to Know About CMMI in 30 Minutes or LESS CCS TECHNICAL SERVICES (484) CCS TECHNICAL SERVICES (484) William.
Capability Maturity Model Integration Project Monitoring and Control Software Management 2008 – 2009 Alexander Ide Niels Soetens.
SACS-CASI Southern Association of Colleges and Schools Council on Accreditation and School Improvement FAMU DRS – QAR Quality Assurance Review April 27-28,
@2002 Copyright, Itreya Technologies CMMI kick off July 2005.
Project Management Processes for a Project
1 / x CMMI Measurement & Analysis Pieter Cailliau Stijn De Vos Measurement & Analysis.
1 Agenda for measurement r1. CMMI r2. Other thrusts.
1 / 25 IPM CMMI Integrated Project Management (IPM) Dieter De Paepe & Sarah Bourgeois.
1 / x CMMI Technical Solution Rob Vanden Meersche Dieter Van den Bulcke.
Capability Maturity Model Integration Project Monitoring and Control Software Management 2008 – 2009 Alexander Ide Niels Soetens.
Purpose: The purpose of CMM Integration is to provide guidance for improving your organization’s processes and your ability to manage the development,
Guidelines for Process
需求管理 Capability Maturity Model Integrated Author : Softare Engineering Institute Carnegie Mellon University.
Copyright © | Trade secret and confidential Page 1 Innovative, Professional, Fact Based and Eustressed© Maruthi Quality Management Services Ptv. Ltd..,
Space and Airborne Systems Prepared For 3rd Annual CMMI Technology Conference Presented In Denver, CO Tom Cowles November 19, 2003 Peer Reviews For CMMI.
 CMMI  REQUIREMENT DEVELOPMENT  SPECIFIC AND GENERIC GOALS  SG1: Develop CUSTOMER Requirement  SG2: Develop Product Requirement  SG3: Analyze.
Pittsburgh, PA CMMI Acquisition Module - Page M5-1 CMMI ® Sponsored by the U.S. Department of Defense © 2005 by Carnegie Mellon University This.
COMPGZ07 Project Management CMMI Project Planning Lecture 5b Graham Collins, UCL.
CMMI1 Capability Maturity Model Integration Eyal Ben-Ari 8/2006.
MSA Orientation – v203a 1 What’s RIGHT with the CMMI?!? Pat O’Toole
Project Management Strategies Hidden in the CMMI Rick Hefner, Northrop Grumman CMMI Technology Conference & User Group November.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
A Comparison of CMMI & SPICE
CMMI for Services, Version 1.3 Speaker: Business Excellence Date:
Level - 3 Process Areas (CMMI-DEV)
CMMI – Staged Representation
Prepared and Presented By:- Abhishek Rautela
Software Reviews.
Presentation transcript:

CMMI: PROCESS AND PRODUCT QUALITY ASSURANCE Lieven Lemiengre Thomas Spranghers

PPQA is evaluating performed processes and associated work products in order to provide feedback to staff and management. The issue of objectivity is critical. Purpose

SG 1: Objectively Evaluate Processes and Work Products SG 2: Provide Objective Insight Specific Goals

SP 1.1: Objectively Evaluate Processes SP 1.2: Objectively Evaluate Work Products and Services Objectively Evaluate Processes and Work Products SG 1

SP 1.1: Objectively Evaluate Processes  All projects have obligatory review meetings with Professor Gielen and the involved assistants. During this meetings the War Room Lists are evaluated. ↔ overlap with Verification Process Area  Most projects apply agile practices. These practices are evaluated for each iteration.

SP 1.2: Objectively Evaluate Work Products and Services  See SP1.1  Products and services are evaluated simultaneously with the processes.

SP 2.1: Communicate and Ensure Resolution of Noncompliance Issues SP 2.2: Establish Records Provide Objective Insight SG 2

SP 2.1: Communicate and Ensure Resolution of Noncompliance Issues  During follow-up meetings issues about the previous meetings are re-evaluated and discussed.  Communication is conducted by .

SP 2.2: Establish Records  Most projects have reports of their meetings. Sometimes the reports lack detail.

GG 2: Achieve Specific Goals GG 3: Institutionalize a Managed Process Generic Goals

GP 2.1: Establish an Organizational Policy GP 2.2: Plan the Process GP 2.3: Provide Resources GP 2.4: Assign Responsibility GP 2.5: Train People GP 2.6: Manage Configurations GP 2.7: Identify and Involve Relevant Stakeholders GP 2.8: Monitor and Control the Process GP 2.9: Objectively Evaluate Adherence GP 2.10: Review Status with Higher Level Management Achieve Specific Goals GG 2

GP 2.1: Establish an Organizational Policy  None of the projects have an explicitly defined policy.

GP 2.2: Plan the Process  PPQA is scheduled during the review meetings.

GP 2.3: Provide Resources  We haven't seen any evidence that groups dedicate resources to PPQA.

GP 2.4: Assign Responsibility  Most projects have a Quality Manager but his responsibilities aren't well defined. ↔ overlap with the Verification Process Area  Some projects also have a Process Manager to ensure the adherence to predefined process standards.

GP 2.5: Train People  All projects’ team members are self-learning to acquire the necessary knowledge.

GP 2.6: Manage Configurations  No appropriate levels of control are defined.

GP 2.7: Identify and Involve Relevant Stakeholders  No relevant stakeholders are involved.

GP 2.8: Monitor and Control the Process  All processes are monitored and controlled by all team members. Corrective actions are taken when necessary.

GP 2.9: Objectively Evaluate Adherence  Professor Gielen and the involved assistants evaluate the adherence to these process standards during biweekly meetings.

GP 2.10: Review Status with Higher Level Management  All activities are reviewed during the meetings and coaching sessions.

GP 3.1: Establish a Defined Process GP 3.2: Collect Improvement Information Institutionalize a Managed Process GG 3

GP 3.1: Establish a Defined Process  None of the projects have a well-defined description for the PPQA process.

GP 3.2: Collect Improvement Information  Most projects use measurement results to improve their products. It is however unclear how this could related to PPQA, hence no projects devote any time to the PPQA process.

When working agile, problems are quickly discussed (between iterations). So processes are quicker adapted and anomalies are quicker determined. However there is a lack of reporting the PPQA process. Findings

CMMI v1.2 Browser ( Hadra Portal ( Mashedup Portal ( WAFL Portal ( TultiMouch Portal ( References