Enhanced Vapor Recovery Amendments Workshop September 9, 2002 Air Resources Board California Environmental Protection Agency.

Slides:



Advertisements
Similar presentations
Environmental Protection Commission of Hillsborough County Rule Revision Update June 28, 2012.
Advertisements

Enhanced Vapor Recovery Workshop October 1, 1999 FPerformance Standards and Performance Specifications. FIncreased stringency of pressure integrity of.
November 14, 2003 Aboveground Storage Tank Enhanced Vapor Recovery.
Georgia Environmental Protection Division Stage II Vapor Recovery Decommissioning Testing 1. Test Notification & Protocols 2. Test Procedures.
Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board AST EVR WORKGROUP MEETING July 23, 2002.
Public Workshop Proposed Modifications to the Clean Fuels Regulations Regarding Clean Fuel Outlets March 18, 1999 California Environmental Protection Agency.
MICHELLE WILSON ARIZONA DEPARTMENT OF WEIGHTS AND MEASURES SEPTEMBER 17, 2013 Stage II Vapor Recovery Update.
California Air Resources Board Enhanced Vapor Recovery.
MassDEP Stage I Vapor Recovery Program
Unihose Dispenser Workshop June 16, 2004 Monitoring and Laboratory Division Air Resources Board California Environmental Protection Agency.
Mobile Source Control Division November 13, 2002 Planning and Technical Support Monitoring and Laboratory Division California Air Resources Board Proposed.
OTC Mobile Source Committee OTC Committee Meeting September 2009 Buffalo, New York 1.
California Air Resources Board December 12, 2002 Enhanced Vapor Recovery Technology Review.
12/25/2009 Pleasure Craft Proposal Draft Pleasure Craft Evaporative Emissions Regulation and Standards.
Gasoline Dispenser Hose Permeation Workshop November 13, 2003 Monitoring and Laboratory Division Air Resources Board California Environmental Protection.
Georgia Environmental Protection Division Stage II Gasoline Vapor Recovery Decommissioning Workshop June 11, 2014 EPD Tradeport Training Room.
Implementing the New Reliability Standards Status of Draft Cyber Security Standards CIP through CIP Larry Bugh ECAR Standard Drafting Team.
Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency.
Enhanced Vapor Recovery Workshop January 19, 2000 Enhanced Vapor Recovery Workshop January 19, 2000 FNew Test Procedures Spillage(TP-201.2C) “Dripless”
1 ENHANCED VAPOR RECOVERY An Update Presented by Laura McKinney at the Petroleum Equipment Institute’s CONVEX2000 October 2, 2000 California Environmental.
1 Public Hearing to Consider Proposed Amendments to the Emission Inventory Criteria and Guidelines Regulation for the AB 2588 Air Toxics “Hot Spots” Program.
Vandenberg Air Force Base E-85 Fueling Facility California Air Resources Board E-85 Workshop Presented by Stu S. Webster Metcalf & Eddy 02 February 2006.
California Air Resources Board Workshop November 3, th Street, Room 202 1:30 - 3:30 p.m. Aboveground Storage Tank Enhanced Vapor Recovery.
Portable Fuel Container Public Workshop California Air Resources Board Monitoring and Laboratory Division October 20, 2004 Understanding Spillage.
PA Department of Environmental Protection Continuous Source Monitoring Manual (Manual, Revision 8)
Proposed Amendments to Enhanced Vapor Recovery Regulations November 18, 2004 Monitoring and Laboratory Division Air Resources Board California Environmental.
Monitoring and Laboratory Division April 25, 2002 Planning and Technical Support Division Mobile Source Control Division California Air Resources Board.
E85 Fuel Dispensing at LBNL CARB E85 Workshop, February 2, 2006 Slide # 1 Berkeley Lab’s Involvement in the California Air Resources Board’s Research and.
Inventory Needs and Legal Requirements Martin Johnson Emission Inventory Workshop Air Resources Board March 13, 2006.
Comprehensive Asset Protection Each school district shall develop, implement, and maintain a comprehensive asset protection plan for every school building,
Rulemaking for Central Florida Coordination Area Coordinated Rulemaking by the South Florida, St. Johns River and Southwest Florida Water Management Districts.
Inspection Directions: An EMS Approach to Inspecting for Section 608 and 609 Compliance.
Monitoring and Laboratory Division July 2, 2003 California Air Resources Board Small Off-Road Engine Workshop Evaporative Emission Program.
Cargo Tank Program Emissions and Regulation Development Public Workshop March 2, 2005 ARB, MLD 1st Floor Conference Room th Street Sacramento, CA.
March Why is MassDEP proposing new UST regulations? DFS’s regulation: standards for tanks construction, installation, O&M, decommissioning and.
MLD - Proposed TP Proposed Vapor Recovery Test Procedure TP DYNAMIC PRESSURE PERFORMANCE Public Workshop, June 20, 2001 CALIFORNIA AIR RESOURCES.
Vapor Recovery Requirements for E85 Dispensing Facilities Meeting to Discuss Vapor Recovery Requirements for Facilities that Dispense E85 February 2, 2006.
13/3/2010 Spark-Ignition Marine Engine Draft Proposal.
Brad Miller Anna Kelley. National Ambient Air Quality Standard Update New Sulfur Dioxide Non-Attainment Area – Effective October 4, 2013 Ozone Secondary.
Update on Methane Regulations Affecting Landfills Pat Sullivan Senior Vice President SCS Engineers Nov. 10, 2015.
Mobile Source Control Division September 25, 2003 Monitoring and Laboratory Division Board Hearing California Air Resources Board Control Measure to Reduce.
1 Public Hearing for Amendments to Rule 2020(Exemptions) Rule 4621(Gasoline Transfer into Stationary Storage Containers, Delivery Vessels, and Bulk Plants)
Portable Fuel Container Spillage Control Project Monitoring and Laboratory Division June 28, 1999 California Environmental Protection Agency Air Resources.
Enhanced Vapor Recovery Workshop November 9, 1999 Enhanced Vapor Recovery Workshop November 9, 1999 FNew and/or Revised Test Procedures Volumetric Phase.
BY: Winston G. Smith Environmental Engineer UST/PCB & OPA Enforcement & Compliance Section EPA Region 4.
Joe Stapinski Senior UST Inspector (317)
Portable Fuel Container Public Workshop California Air Resources Board Monitoring and Laboratory Division November 19, 2003.
Engineering Evaluation Unit Monitoring and Laboratory Division California Air Resources Board (916) ABOVE GROUND STORAGE TANK (AST) VAPOR RECOVERY.
Proposed Carbon Pollution Standard For New Power Plants Presented by Kevin Culligan Office of Air Quality Planning And Standards Office of Air and Radiation.
Refueling Spillage Control For Small Off-Road Engines Air Resources Board August 6, 1998 Dean Bloudoff.
Presented at the Fifth Annual California Unified Program Conference February 6, 2003 Enhanced Vapor Recovery Cindy Castronovo Air Resources Board Cal-EPA.
California Integrated Waste Management Board Workshop July 9, 2009 AB 2296 Consulting Group Financial Assurances Phase II Rulemaking AB 2296 Consulting.
Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board AST EVR WORKGROUP MEETING April 17, 2002.
 To discuss MassDEP’s draft revisions to the following regulations:  Stage II – 310 CMR 7.24(6)  Stage I – 310 CMR 7.24(3)  Definitions – 310 CMR.
1 Public Workshop to Discuss Amendments to the AB 2588 “Hot Spots” Emission Inventory Criteria and Guidelines Regulation California Air Resources Board.
Garry Kaufman Air Pollution Control Division.  Background on Oil and Gas Air Regulation in Colorado  Basis for Additional Air Quality Requirements for.
Phase II Enhanced Gasoline Vapor Recovery and In-Station Diagnostics
1 Proposed Amendments to the Verification Procedure for In-Use Diesel Emission Control Strategies August 23, 2012 California Environmental Protection Agency.
1 Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board Aboveground Storage Tank Enhanced Vapor.
1 Public Workshop to Discuss Proposed Amendments to the AB 2588 Guidelines Regulation July 27, 2006 California Environmental Protection Agency Air Resources.
FIRE PROTECTION CONTRACTS Workshop on Senate Bill 239 (Hertzberg) July 21, 2016 Nevada LAFCo – Presented by P. Scott Browne, Counsel.
The Florida Energy and Climate Commission (FECC)
Final Rulemaking Nonattainment Source Review 25 Pa. Code, Chapter 121
Petroleum Storage Tanks – Program Updates
July 13, 2016 Department of Environmental Quality Proposed Amendments to UST Rules 15A NCAC 02N and 02O Ruth Strauss.
September 8, 2016 Department of Environmental Quality Proposed Amendments to UST Rules 15A NCAC 02N and 02O Ruth Strauss.
GTEC 2017 Annual UST Management & Compliance Assistance Seminar
Methane Emission Standards for Crude Oil and Natural Gas Facilities
Enforcing the NAAQS Case Study Sean Taylor
Larry Bugh ECAR Standard Drafting Team Chair June 1, 2005
Presentation transcript:

Enhanced Vapor Recovery Amendments Workshop September 9, 2002 Air Resources Board California Environmental Protection Agency

2 Agenda Introductions Discussion of Comments Received since June 18th Workshop EVR System Certification Status Proposed EVR Amendments EVR Technology Review Cost-Effective Analysis Update Schedule

3 EVR Comments Received between June 18th and July 31st See App. 1 of EVR Tech Review Report EVR Certification EVR Implementation EVR Emission Reductions EVR Cost Analysis

4 Phase I Non-System-Specific Components Comment: Make System-Specific Phase I Components Non-System-Specific Response: No Why: 1) Need to define Phase I system 2) Components that may seem interchangeable have different requirements Example: Different torque settings for Phase I adaptors

5 Phase I Non-System-Specific Components Testing Comment: Allow less than 180 day operational test for non-system-specific components to increase equipment availability Response: No Why: 1) Intent of non-system-specific is to allow use of components on multiple systems without full testing on EACH system 2) All components must successfully pass at least one operational test of at least 180 days

6 EVR Phase II for Unihose and “Six-pack” Dispensers Comment: Can any EVR Phase II system be used on both unihose and six-pack dispensers? Response: Yes Why: The full EVR certification testing will be conducted using either unihose or six-pack dispensers. Field compatibility testing will be done using the alternate dispenser to allow the EVR Phase II system to be certified on both types of dispenser.

7 EVR Phase II Systems with Conditional ISD Certification Comment: ARB proposes to allow limited term certification of systems with failures identified by ISD. The proposed limited term of 4 years for these certifications should be removed. Response: Yes, we will remove. Why: EVR certifications are already reviewed every four years. If deficiencies are identified, system cert will not be renewed.

8

9 Use of EVR Nozzles on Pre-EVR Phase II Systems Comment: Will EVR nozzles be compatible with my existing dispensers? Response: Nozzles are expected to be compatible. However, if replacement nozzles are not compatible with the existing system, then a nozzle that was certified with the original system may continue to be used.

10 Adding ORVR Compatibility to Pre-EVR Phase II Systems Comment: Can I add ORVR compatibility to my existing Phase II system so I can use until 2007? Response: Yes, if your system has demonstrated ORVR compatibility through ARB certification. Pre-EVR Phase II systems can seek Section 19 certification for ORVR compatibility until April Phase II systems obtaining Section 19 certification for ORVR compatibility may remain in use until April 2007.

11 Upgrade of Pre-EVR Phase II Systems Comment: Will upgrading pre-EVR Phase II systems to be ORVR Compatible trigger EVR via major modification? Response: Not in most cases. Phase II major modifications are defined in D-200 as occurring when dispensers are replaced or 50% of buried vapor piping is added, replaced or removed.

12 EVR for Districts in Attainment Areas? Comment: Districts in ozone attainment areas have vapor recovery to reduce benzene exposure. If EVR goals are ROG emission reductions, is EVR necessary for districts that meet the state ozone standard? Response: Will propose EVR exemption for existing installed systems in districts in ozone attainment, except for ORVR compatibility. New installations and facilities with major modifications must meet EVR standards.

13 Agenda Introductions Discussion of Comments Received since June 18th Workshop EVR System Certification Status Proposed EVR Amendments EVR Technology Review Cost-Effective Analysis Update Schedule

14 EVR Certified System Update One certified EVR Phase I system No certified EVR Phase II systems with ISD No certified EVR Phase II systems without ISD

15 EVR Phase I System Status 19 applications received 10 tests terminated 3 systems under test 3 systems waiting to start testing 2 applications withdrawn 1 system certified* * second system by end of Sept. 2002

16 EVR Phase II System Status 5 system applications 0 test sites sealed 0 systems currently on test

17 Pre-EVR ORVR-Compatible Phase II System Status 3 system applications 1 test sites sealed 1 system currently on test 3 systems certified prior to EVR program (2 Healy and SaberVac)

18 Agenda Introductions Discussion of Comments Received since June 18th Workshop EVR System Certification Status Proposed EVR Amendments EVR Technology Review Cost-Effective Analysis Update Schedule

19 Proposed EVR Amendments Rigid piping definition “Dripless” nozzle standard Other CP-201 revisions Test procedure changes ISD-based maintenance during certification testing

20 Rigid Piping Already required in CP-201 Proposed definition: any piping material with a bend radius that exceeds six feet as determined by TP-201.2G. Similar to proposed UL standard for marina fueling systems

21 “Dripless” nozzle standard Currently “1 drop per refueling” Only EVR standard determined not to be feasible in tech review 3 drop average with 10 drop max proposed on June 18, 2002 Current proposal: 3 drop average

22 ISD Exemption Throughput Currently 160,000 gallons/yr based on average throughput of GDF 1 facilities Propose increase to 300,000 gallons/yr to include all facilities in GDF1 category

23 Nozzle Standard Effective Dates Change the effective dates from April 2001 to April 2003 for: –Liquid retention –Nozzle spitting –Spillage Aligns with “dripless” nozzle and Phase II

24

25 Processor HC rate Propose: “maximum hydrocarbon feedrate from to the processor shall not exceed 5.7 lbs/1000 gallons”

26 Hand pump specifications Deleted hand pump references from CP-201 Spill container requirements regulated by State Water Resources Control Board

27 Dispenser standard Dispenser vapor piping for balance systems already designated as a non-system-specific component Propose to remove “balance” to allow all dispenser vapor piping to be non-system-specific

28 Daily high pressure Clarify calculation in CP-201 Intent: –Calculate the average pressure reading for each hour. –Identify the highest one-hour pressure average over a 24 hour period. This is the daily high pressure. –Compute rolling 30-day average of daily high pressures - may not exceed +1.5 inches water.

29 Certification process changes innovative system throughput for sixpack dispenser system-specific and non-system- specific certify ISD by system type ISD-based maintenance

30 Innovative system Intent was to allow flexibility for systems which emit much less than allowed by current standards In practice - viewed as way to avoid compliance with some EVR requirements Language to be modified to better reflect intent

31 Test site throughput for sixpack dispensers Unihose: Minimum throughput of 150,000 gal/month Six-pack: Minimum throughput of 150,000 gal/month for one grade of gasoline

32 System-Specific Components Pass all tests on system that is or becomes certified. Some components may then be certified on other systems after field compatibility, performance and efficiency tests. Example: Phase I adaptors (if identical performance and installation).

33 Non-System-Specific Components Operational test of at least 180 days on a certified system. May be certified on other certified systems after field compatibility and performance tests if meets all the system specifications. Example: Phase II Hose.

34 ISD Certification Process ISD system type certification will be proposed in the EVR amendments

35 ISD-based maintenance during certification testing ISD benefit is immediate identification of system failures We recognize that ISD will make it harder for Phase II systems to pass operational test Provide limited repair of failures identified by ISD during certification

36 ISD-Maintenance Criteria No failure for 90 days ISD-based maintenance included in maintenance manual Maximum 5% of allowable downtime for ISD-detected failures Manual field test failures are grounds for test termination

37 ISD Certification Options If ISD-detected failure occurs during certification: Phase II system certification will require use of ISD system If no failures during certification: Phase II system may be certified for use both with and without ISD

38 Revisions to Phase I Test Procedures

39 Revisions to Phase II Test Procedures

40 Proposed New Test Procedures

41 TP Phase I Efficiency Current procedure assumes volume of vapor returned to cargo tank is same as volume of gallons dispensed Revised procedure measure vapor volume directly using meter to improve accuracy

42 Update of Other Phase I Test Procedures TP-201.1B: Adaptor static torque TP-201.1C:Drop tube/drain valve leakrate TP-201.1D:Drop tube overfill prevention device leakrate Improve equipment specifications Clarify test procedure steps

43 TP-201.2B Component leakrates Current procedure for P/V valve leak measurement uses rotameters Revised procedure allows option for mass flow controller to improve accuracy Removed TP-201.2B Appendix to create TP-201.1E

44 TP-201.2D Dripless nozzle 15 drops/ml to be changed to 20 drops/ml to be consistent with spillage procedure Modifications suggested to improve method consistency and conduct fueling similar to average customer

45 Change time nozzle in vehicle from 10 to 5 sec

46 Nozzle Spout Horizontal, Not Upside Down for Drip Count Adopted TP-201.2D Proposed TP-201.2D

47 TP-201.2F Pressure-related fugitives Current procedure has missing equations Change time for pressure decay from 20 minutes to 5 minutes

48 TP-201.2J: Balance component pressure drop New procedure Bench test to determine pressure drop for balance components

49 TP-201.7: Continuous pressure monitoring New procedure Describes equipment and procedure for pressure monitoring required for operational tests during certification

50 TP-201.2I: ISD Performance Describes certification tests to determine compliance with ISD standards

51 Agenda Introductions Discussion of Comments Received since June 18th Workshop EVR System Certification Status Proposed EVR Amendments EVR Technology Review Cost-Effective Analysis Update Schedule

52 Tech Review Direction from March 2000 Resolution Feasibility of standards with future effective or operative dates Comprehensive, thorough and rigorous Evaluate practical alternatives Hold workshops Complete tech review by April 1, 2002 Submit final report to Board for consideration at a public meeting

53 EVR Amendments Propose changes to EVR regulation based on tech review findings Improve certification process Revised and new test procedures General clean-up and clarification

54 EVR Tech Review Report Will be finalized by early October Issued as attachment to ISOR for EVR Amendments Last chance to submit comments for EVR Tech Review Report - September 16, 2002

55 Agenda Introductions Discussion of Comments Received since June 18th Workshop EVR System Certification Status Proposed EVR Amendments EVR Technology Review Cost-Effective Analysis Update Schedule

56 EVR Cost Analysis Updates to cost analysis since tech review report Current cost-effectiveness

57 Summary of Cost Changes from June 18th Workshop Corrected annual equipment cost for cost-effectiveness calculation Reduced projected number of certified EVR systems Increased “worst case” ISD system cost Revised ISD emission reductions

58 Annual field test costs for balance systems Existing balance system Executive Orders require testing every 5 years EVR systems will require annual testing Added costs associated with balance system increased testing Estimated $800 (SCAQMD rule)

59 Other Cost Analysis Updates Adjusted ISD costs to 1999 dollars 1999 gasoline throughput Revised emission reductions –ISD: changed from 6.6 to 8.5 –ORVR: changed from 6.3 to 4.5 Included annual maintenance costs in EVR total cost

60 Feb 2000 EVR Costs 33 million annually

61 June 2002 EVR Costs 88 million annually

62 September 2002 EVR Costs 91 million annually

63 EVR Total Equipment and Installation Costs

64 Overall Cost-Effectiveness as of September 2002 $91,050,000/yr 1 ton 1 yr 25.7 tons/day 2000 lb 365 days = $4.85/lb

65 EVR Cost Effectiveness as of September 2002 *Overall Cost-Effectiveness = $4.85/lb

66 EVR Cost Effectiveness Development ($/lb)

67 Enhanced Vapor Recovery

68 Schedule for EVR Regulation Amendments Preliminary comments by September 16, 2002 Notice and ISOR release on October 25, 2002 (start of 45-day comment period) Board meeting on December 12-13, 2002

69 EVR Contacts EVR Amendments - Cindy Castronovo (916) In-Station Diagnostics - Joe Guerrero (916) EVR Certification - Laura McKinney (916)