Cable Rehabilitation at Oncor by Richie Harp – Distribution Standards Data provided by Mark Darilek – Maintenance Planning SWEDE 2009 – Tulsa, OK – Thursday,

Slides:



Advertisements
Similar presentations
Filing a Warranty Claim On-Line Claim Filing. 1.Upon successful login, the screen to the right appears. 2.To start a new warranty claim or check the status.
Advertisements

2 November 2005 Fall ICC1 In Service Performance Of EPR Cables Installed In The MLGW Electrical Distribution System Insulated Conductor Committee Educational.
…your final connection. Mine Cable Services Corporation. Cable Repairs: Vulcanized Splices.
APS Underground Distribution Cable Replacement Project
Underground Cable – Replacement & Rejuvenation Presented by John Gilkey May 7, 2009.
Electrical Installation
Basic Electricity.
Fault Locating Overview
EPA Pesticide Container and Repackaging Regulations, Flow Chart 2: Can I fill this large portable refillable container (greater than 119 gallons)? (end.
FoamPro 1600 Series Fully automatic Class A foam ONLY
OSHA Region IV Electrical Outreach Construction Industry Photos 29 CFR 1926 Regulations.
Presented by: Alex Hageman ( Accelerated Production Services, Inc.) May 15 th, 2013 Multiple Stage Hydraulic Jet Pump Presented to ALRDC.
Stray Current Investigations A Method of Troubleshooting Stray Current on Underground Residential Distribution (URD) Loops Stacey Mighty Malcolm Distribution.
Cameras on Buses: Our Experience CAMBUS. Cameras Today-Standard Equipment Cambus was somewhat late in implementing camera systems Concerns –Cost (waiting.
Major Underground Design John Perez. Underground Engineering Design Practices Three Phase Circuit –Infrastructure: Ductbanks & Manholes All three phase.
FIRE PUMP ELECTRICAL CONFIGURATIONS UNDER 600 VOLTS.
Startup Training – TPS3 15. Siemens TPS3 Startup Training 2 Topics Covered  Visual Inspections  Verify environmental requirements are met  TPS3 15.
Electrocution 44% Rigging Failure 15% Load Handling 14% Operator Error 7% Overload 7% Dismantling Boom 5% Wire Rope Failure 3% Miscellaneous 3% Struck.
Conductors and Insulators
New Product Overview Homac STORM SAFE™ Connector Systems Presented by: Presented by: Roy Jazowski - Director of R&D Mark Hammer – Director of Marketing.
EET Electronics Survey Chapter 9 - Circuit Conductors & Wire Sizes.
Electrical Power Systems
URD Cable Rehabilitation Program SWEDE 2009 Tulsa, OK May 7, 2009 B. Shawn Cobb, P.E.
+ -. Methode Connector  This is the standard USGS connection for the DCP.  Some manufacturers do not recommend using a methode connector. However, we.
PROGRAMMING In Lesson 5. RECAP  Complete the starter activity.
Electrical Principles and Wiring Materials
Electricity. whether two charges attract or repel depends on whether they have the same or opposite sign unit of measurement for charge is the coulomb.
Copyright 2005 Ted "Smitty" Smith Two Minute Drill Number Three Improving your skill in code Look Up Increasing Speed Drill.
Domina PLUS B WORKING DIAGRAMS TROUBLESHOOTING INTERNAL VIEWS WIRING DIAGRAMS INSTALLATION 03 PREVIOUS MODEL.
HW1. Due back on Thursday, December 5. From the text book: Q: 1.28, 1.32, 2.4, 2.11, 3.8 and In addition: Based on the following definitions, data.
Two Minute Drill #8 Copyright 2005 Ted "Smitty" Smith Practice Code Look Up.
Electrical Principles and Wiring Materials. Principles of Electricity n Electricity is a form of energy that can produce light, heat, magnetism, chemical.
Total System Reliability Program for Underground Electrical Distribution Networks Essay Shu, Ph.D Winnipeg, MB Sep
Electrical Principles and Wiring Materials Unit #31.
Grounding, bonding, and ground fault currents
Cable Rehabilitation Program By Lee Maurer Maintenance Planning SWEDE Conference April 26, Bastrop, Tx (Second Responder Cable Treatment Program)
Conversion of Pegasus and Folders to GroupWise Presents UNIVERSITY OF FLORIDA ~ HEALTH SCIENCE CENTER.
Utility Engineers, PC.  Generation  Transmission  Distribution.
WIRE REPAIR Chapter 4.
Daily Lesson Electrical Conductors Prepared by: Brian Alexander This lesson is from Virginia Tech and has not been edited by the Georgia Curriculum Office.
UNDERGROUND CABLE.
Top Ten Misunderstandings Regarding Over-Voltage Protection Mike Tachick Dairyland Electrical Industries Inc. SIEO, Jan 2016.
2014 NEC C ODE C HANGES C LASS P ART II Ted “Smitty” Smith 8/15/2014 E Light Electric Services, Inc.
Safety Around Irrigation Systems
 Nonmetallic sheathed cable: copper or aluminum wire covered with paper, rubber, or vinyl for insulation  Armored cable: flexible metal sheath with.
Starting Residential Wiring.  The most important element in wiring. Safety is proper grounding.  Grounding is the connection of all parts of a wiring.
CMTF GROUNDING FOR PIP-II K. Carlson PXIE Electrical Coordination Meeting December 19 th, 2013.
Terms Wiring WVAOhm’s Law Misc. FR.
RFQ Installation Status 10/27/2015 October 27, 2015 Jim Steimel & Curtis Baffes.
Chapter 3 PHYSICAL INJURY AND CONTROLS 3.2 Electrical Safety
CNOOC SES Subsea Cables Study, Rejuvenation and Maintenance Plan Prepared in August 2011.
Electrical Conductors
Electricity on the Move
2011 Changes Two Minute Drill
Local communities and municipalities
Circuit Breakers & Reclosers
Electrical Principles and Wiring Materials
Electrical Principles and Wiring Materials
CASTLE Need to Know.
Maser Cable Training Level 1
Smitty’s Two Minute Drill #1: Feeders and Branch Circuits
EET 323 – Electrical System Design Lecture 9: Grounding
The Safe Use of Electricity
EET 323 – Electrical System Design Lecture 6: Conductors and Over-Current Protection Radian Belu, PhD.
Review of Distribution Network Protection
Piping Flow Maintenance
ST800 Service Tester, 800 Amps.
CPS Energy URD Primary Cable and Splices
Fluid Power System Electrical Control
Presentation transcript:

Cable Rehabilitation at Oncor by Richie Harp – Distribution Standards Data provided by Mark Darilek – Maintenance Planning SWEDE 2009 – Tulsa, OK – Thursday, May 7, 2009

Cable Rehabilitation Overview  Rehabilitated cable  Cable repairs to facilitate future rehabilitation  Oncor requirements for rehabilitation  Further considerations  2 nd Responder process  Another technology

Amount of Rehabilitated Cable  Began in 1995  420 cbl-mi rehabilitated  8,000 cbl-mi in service – Pre-1993 cable  22,000 cbl-mi total cable

Amount of Rehabilitated Cable  URD  Cable size – Less than #4/0 AWG (#2 and #1/0 AWG, and minimal amount of #2/0 AWG)  Began in 1995  405 cbl-mi rehabilitated  17,000 cbl-mi in service  2% of URD cables

Amount of Rehabilitated Cable  Feeder  Cable size – #4/0 AWG and larger (up to 1000 kcmil)  Began in 2008  15 cbl-mi rehabilitated  3,400 cbl-mi in service  0.4% of feeder cable

Cable Repairs  Standard cable (Began purchasing in 1990)  #1/0 Al 19-Strands  Strand-filled conductors  25 kV, 260-mil TRXLPE  16-#14 AWG Concentric Neutral Wires (Full neutral)  Jacketed

Cable Repairs (Cont)  Only for cable repairs (2-ft pieces) for future injection  #1/0 Al 19-Strands  Strands not filled  25 kV, 260-mil TRXLPE  8-#14 AWG concentric neutral wires (1/2 neutral)  Unjacketed  On 1000-ft composite reel

Oncor Requirements for Rehabilitation  Do not rehabilitate:  Cable installed in conduit  175-mil or 220-mil cable operating at 14.4 kV  Butyl rubber cable  Cable with tape conductor shield  Corroded concentric neutral

 Do not rehabilitate cable if…  Corroded center conductor  Loss of insulation shield conductivity  Insulation shield with no adhesion  Failures due to dig-ins or debris in trench  There is a chance the cable will be converted to 14.4 kV in the future Oncor Requirements for Rehabilitation (cont)

Other Requirements  There must be more than 25% concentric neutral remaining.  There cannot be more that one joint per 100 feet of cable.  The faulted cable section must not have been de-energized more than six months.

Comments:  We tried to rehabilitate some open loops that had been de-energized for up to 2 years  Very little success  We quit rehabilitating open loops that had been de-energized for more than 6 months.

More comments:  2006 and 2007 Processes  Left URD loops open after failures (direct buried cables)  Only repaired cable to get customers’ lights back on.

More comments:  Dec 2007 Process  Began repairing failed loops again.  Caught up with open loops (Feb 2009) – Inject cables or – Replace cable if not able to inject

More comments:  Dec 2008 Process Change  Install joint to repair cable  Try to inject the cable  After the repair, if the cable is not able to be injected, then just leave energized.  Defer replacement of the cable until the next fault.

2 nd Responder Process  System-Wide Process  Repair failures on direct buried cable (not in conduit)  Must be able to switch around to get lights back on.  Not normally feeder exits (Only non-critical cables)

2 nd Responder Decision Process Flow Chart  Available by request

2 nd Responder Process  1868 sections of failed cables came through the process since 2008  749 sections of cable were injected  1119 sections were not able to be injected  922 due to process requirements  197 not related to the process (already energized when arrived, in conduit, etc.)

2 nd Responder Process – Injected/Not Injected

2 nd Responder Process  12 cause codes for not being able to inject the 1119 sections of cable  Age of fault (> 6 months)  Could not flow (Blocked strands or joints)  Inaccessible fault or joint location  Deteriorated neutral (< 25% remaining)  Previously injected, non-warranty or other  Previously injected, warranty

2 nd Responder Process  12 cause codes for not being able to inject the cable (Cont)  Corroded conductor  Number of joints (> than 1 joint per 100 ft)  Unknown  Cable is in conduit  Already energized upon arrival  Other – These last three represent the 197.

2 nd Responder Process – Causes

Another technology  Different formulations for injection fluid  Formulation tailored to operating environment  Tailored more for feeder cables with higher operating temperatures (»45°C)  No soak tanks required  Put back into service immediately after injection

Another technology (Cont)  Must replace all joints  Higher pressures for injection

Rehabilitated Cable That Is Failing  Feeder  URD