Grand Canyon National Park Remediation and Restoration of Firing Ranges
South Rim – Before Work
North Rim – Before Work
Using a Metal Detector to Test Berm for Lead – South Rim Site
Testing Soils for Depth of Lead- South Rim Site
South Rim Range Excavation
Vibratory Lead Screener and Stone Separator – South Rim
Stone Separator – South Rim
Lead Fragments Recovered for Recycling
Forms, rebar for Backstop – North Rim
Concrete Pour for Backstop – North Rim
Berm Leach Block and Sacon Walls – North Rim
Support Berm – North Rim
Soil Cement Range – South Rim
Redevelopment Complete – North Rim Range
Redevelopment Complete – South Rim Range