Joint ICM GTS-WIS MTN & ET-OI 23-26 Sep 2008 1 Joint ICM on the GTS-WIS MTN and ET-OI meeting Kelvin Wong CBS ET – OI Co-chair RTH Focal Point WMC Melbourne.

Slides:



Advertisements
Similar presentations
1 Patricio A. Bernal, Executive Secretary IOC The Indian Ocean Tsunami Warning System : A Progress Report. Intergovernmental Oceanographic Commission.
Advertisements

An outline of the GTS & the Improved MTN project for FWIS By Hiroyuki Ichijo Japan Meteorological Agency ISS/ITT-FWIS 2003 (Kuala Lumpur, October.
International Satellite Communication System – ISCS Systems Transition and STAR 4 Workstation Replacements IMPLEMENTATION - COORDINATION MEETING ON THE.
Status of Implementation at RTH Tokyo By Hiroyuki Ichijo Contents Contents 1. GTS facilities 2. GTS circuits 3. Use of the Internet 4. Collection of SHIP.
1 ICM-MTN AND ET-OI MEETING, GENEVA TH SEPTEMBER 2008 Presented by: Eng. Henry N. Karanja NAIROBI RTH.
STATUS AND UPGRADATION PLAN OF RTH NEW DELHI AND TELECOMMUNICATION NETWORK OF IMD N.K.Pangasa Director RTH New Delhi.
RMDCN-TT report Matteo Dell’Acqua Meteo-France
RTH AND NMC FUNCTIONS FOR GTS INFORMATION EXCHANGE T.K.RAY RTH,NEW DELHI,INDIA E Training Seminar on information and communication.
IMTN and managed data network services Technical Conference on the WIS (Seoul, 6-8 November 2006) Hiroyuki ICHIJO (Japan Meteorological Agency.
1 Role of RTH Beijing in exchanging tsunami-related information and Status of the GTS system at RTH Beijing National Meteorological Information Center,
Current Status of Implementation of MTN at RTH Beijing Li Xiang National Meteorological Information Center, CMA.
Case Study of IMTN Network B with A ET-IMTN 2001 ( Geneva, June 20 to 23, 2001) By Hiroyuki Ichijo Office of International Communications,JMA.
INTERNATIONAL SATELLITE COMMUNICATIONS SUCCESSOR SYSTEM (ISCS)
1 World Meteorological Organization WMO Information System WORLD METEOROLOGICAL ORGANIZATION Weather – Climate - Water J.-M. Rainer, Chief ISS Division.
Managing & Moving Weather, Water and Climate Information in the 21 st Century WMO Information System (WIS) 4 th WCRP Observations and Assimilation Panel.
May 2004Iridium Users Workshop, Seattle National Data Buoy Center’s Experiences with Real-Time Data Retrieval from Remote Stations using Iridium; and Data.
1 WIS in support of Disaster Prevention & Mitigation (DPM) Sue Barrell Australian Bureau of Meteorology & CBS Coordinator for DPM (in collaboration with.
Coupled with the DART 4G system, PMEL is working on the next generation Tsunami Forecast System. New modeling capability will use NOAA supercomputers to.
» Data buoys measure air pressure, temperature (sea-surface & air), ocean current velocity and wind velocity across all oceans. These observations are.
WMO Severe weather in Africa and impact of current telecom capability on Early Warning Systems WMO African severe weather demonstration projects success.
Tsunami Warning System Elements IOC Assessment Mission to Indonesia 29 August-1 September 2005.
Overview of the Improved MTN project Geoff Molloy Communications and Computing Branch Bureau of Meteorology Australia.
Report on the Improved RMTN project Contents 1. Background 2. Status of progress of the improved RMTN 2.1 Implementation of circuits 2.2 Migration to TCP/IP.
CMA’s new GTS system Submitted by YANG Genlu, China
1 1 Japan Meteorological AgencyET-WISC-3, EUMETSAT Germany, Jun.2008 JMA’s Status Report related to WIS Toshikazu NISHIO JMA ET-WISC-III Jun.
1 World Meteorological Organization AR report to ADC May 2008 Presented by David Thomas (WMO) WORLD METEOROLOGICAL ORGANIZATION Weather – Climate.
© Crown copyright Met Office Joint ICT GTS-WIS MTN and ET-GTS WIS OI Chris Little, The Met Office September 2008 Geneva, Switzerland.
© Crown copyright Met Office APSDEU / NAEDEX 2012 Chris Little, Met Office October 2012 Exeter, UK.
The WMO Information System (WIS)
Gianni,José Luis. COUNTRYCITYCIRCUIT TYPESPEEDTRANSFER PROTOCOL EXCHAN GE DATA REMARKS USA Washington (WMC) Leased Line 64K TCP/IP SOCKETS A/N,GRIB T4.
Status of the Global Telecommunication System connected with RTH Tokyo Japan Meteorological Agency Presented by Masahiro Kazumori Eighth Meeting on Asia-Pacific.
Features of the new TCP/IP link between HK and Beijing (Guangzhou) Features of the new TCP/IP link between HK and Beijing (Guangzhou) Justin Waiman MA.
Status on RTH Tokyo (Item 2.1) By Hiroyuki Ichijo By Hiroyuki Ichijo Expert Meeting on the Exchange of Early Warning and Related Information Including.
STATUS OF IMPLEMENTATION AT RTH BEIJING SHI Peiliang, China
Status of the Global Telecommunication System connected with RTH Tokyo Sixth Meeting on Asia-Pacific Satellite Data Exchange and Utilization (APSDEU-6)
Collaboration for Beijing and Tokyo GISC prototypes -- Status of WIS center development and planning -- Submitted by Hiroyuki ICHIJO (Japan) and SHI Peiliang.
STATUS OF RTH MOSCOW (Submitted by Expert (Russian Federation)) ________________________________________________________________ Summary and Purpose of.
Sep 20-22, 2006 APSDEU-7, Honolulu/Hawaii 1 Status of AP-RARS implementation at Tokyo Japan Meteorological Agency Prepared by A. Nakazono, T. Saito, H.
WIS data-communications functions and services, and implementation Progress report on Expert Team on WIS-GTS Communication Techniques and Structure (ET-CTS)
NOAA NWS Telecoms Report & WMO CBS Issues APSDEU-10 BoM - Melbourne, AU Feb 2010 Fred Branski, Intl Requirements and Data Liaison Office of the Chief Information.
RTH NEW DELHI INDIA METEOROLOGICAL DEPARTMENT NARENDRA NIGAM
Training Seminar on ICT for GTS (Bangkok, September 2002) - Slide 1 Organisation principles of the GTS.
1 Development of GTS and Data Exchange in China National Meteorological Information Center, CMA.
WMO Contributions to TWS I.WMO's GTS support to TWS II.Support of Regional Warning Centers III.IOC/WMO/ISDR Assessments IV.Multi-hazard approach to ocean-related.
Lecture Note No. 1 TRAINING SEMINAR ON INFORMATION AND COMMUNICATION TECHNOLOGY ON THE GTS T.K.RAY RTH NEW DELHI, INDIA E mail :
RA5 ISS MEETING WIS-GTS Honolulu, Hawaii 2-5 Dec 2009 Bryan Hodge Observational Network Data Communications Manager.
Status of RTH Tokyo Japan Meteorological Agency Presented by Tatsuya Noyori Expert Team on WIS-GTS Communication Techniques and Structure (TOULOUSE, France,
Status of RTH Tokyo Japan Meteorological Agency Presented by Kenji Tsunoda Joint implementation-coordination meeting on the GTS-WIS MTN and meeting of.
Terena Networking Conference, , Prague examine the performance and delay of 430 tsunami warning stations SEA LEVEL STATION MONITORING FACILITY.
Status of Implementation TCP/IP at RTH Beijing NMIC, CMA.
1 Towards Full GISC Compliance for IMD in
RTH Moscow 1 STATUS OF RTH MOSCOW (Submitted by Expert Russian Federation) ________________________________________________________________ Summary and.
Theme Leader WMO-WIS / Director PMD
GISC Tehran Status Feb, 2016 TT-GISC 2016-Doc18.
Automation of NMCs for GTS operation
WIS Implementation Status in RA II
GISC PRETORIA STATUS REPORT.
Regional Meteorological Telecommunication Network for Region II (Asia)
Outcome of the ET-CTS Meeting (Toulouse, May 2008)
Regional Training Seminar on GTS Techniques and Procedures
Peak speed through Internet
Status Report of GISC Tokyo
WIS overview Submitted by: Secretariat (Doc 02b)
Status of Implementation at RTH Tokyo
Outcome of the ET-CTS Meeting (Toulouse, May 2008)
MeteoFranceMPLS via Toulouse
Status of RA II WIS Implementation Plan
Report from Task Team on GISC (TT-GISC)
GISC New Delhi Status Dr. S. L. Singh
RTH Exeter Status Report – 2014 (Doc 22)
Presentation transcript:

Joint ICM GTS-WIS MTN & ET-OI Sep Joint ICM on the GTS-WIS MTN and ET-OI meeting Kelvin Wong CBS ET – OI Co-chair RTH Focal Point WMC Melbourne Bureau of Meteorology 700 Collins Street Docklands 3008 Victoria Australia Status of RTH Melbourne

Joint ICM GTS-WIS MTN & ET-OI Sep Outline GTS regional MTN circuits (Region V) GTS inter-regional circuits for IOTWS (Frame Relay, MPLS, RMDCN, RETIM) Australian Tsunami Warning System (ATWS) DART buoys and sea level station data communication PMEL DART II data issues Table Driven Code Form and CREX data representation Registered user access to Bureau data and products

Joint ICM GTS-WIS MTN & ET-OI Sep Network migration of WMC Melbourne Singapore Melbourne Tokyo Washington Exeter Indonesia NadiNoumea BT Frame Relay Global Frame Relay DRS 256k 64k 1.5M 256k 64k RMDCN IP VPN MPLS 1M2M TokyoExeter 2M Singapore Indonesia NoumeaNadi Frame Relay Washington 256k

Joint ICM GTS-WIS MTN & ET-OI Sep 2008

Maputo Pretoria Abu-Dhabi Internet 64kbps Kerguelen New Amsterdam FR CIR FR CIR FR CIR MPLS 128kbps Internet 200bps 64kbps Dhaka Internet FR CIR FR CIR 2.4kbps Jakarta Bangkok Melbourne Washington Yangon Kuala Lumpur Singapore Colombo Male Mogadiscio 64kbps 33.6kbps 512kbps 128kbps 64 kbps 100bps 75bps 50bps 64 kbps MPLS 1Mbps MPLS 2Mbps FR CIR Offenbach Cairo Nairobi Dar Es Salaam Mauritius Seychelles Sanaa Karachi New Delhi Tokyo Beijing Tehran Jeddah St. Denis thru Internet thru Internet FR CIR FR CIR FR CIR MPLS 128kbps Internet 200bps 64kbps Dhaka Internet FR CIR FR CIR 2.4kbps Jakarta Bangkok Melbourne Washington Yangon Kuala Lumpur Singapore Colombo Male Mogadiscio 64kbps 33.6kbps 4 M 512kbps 64 kbps 100bps 75bps 50bps 64 kbps MPLS 1Mbps MPLS 2Mbps FR CIR Offenbach Cairo Nairobi Dar Es Salaam Mauritius Seychelles Sanaa Karachi New Delhi Tokyo Beijing Tehran Jeddah St. Denis FR CIR FR CIR FR CIR MPLS 128kbps Internet 200bps 64kbps Dhaka Internet FR CIR FR CIR 2.4kbps Jakarta Bangkok Melbourne Washington Yangon Kuala Lumpur Singapore Colombo Male Mogadiscio 64kbps 33.6kbps 64kbps 512kbps 128kbps 64 kbps 100bps 75bps 50bps 64 kbps MPLS 1Mbps MPLS 2Mbps FR CIR Offenbach Cairo Nairobi Dar Es Salaam Moroni Mauritius Seychelles Sanaa Karachi New Delhi Tokyo Beijing Tehran Jeddah St. Denis MTN circuits RTH NMC Internet FR 1.5 M CIR FR 256 CIR FR CIR FR CIR FR CIR FR CIR MPLS 128kbps Internet 200bps 2.4 kbps 64kbps 2.4kbps Dhaka Internet FR CIR FR CIR 2.4kbps Jakarta Bangkok Melbourne Washington Yangon Kuala Lumpur Singapore Colombo Djibouti Mogadiscio 64kbps 9.6kbps 33.6kbps 64kbps 512kbps 128kbps Internet 64 kbps Internet 64kbps 100bps 75bps 2.4kbps 50bps MPLS 1Mbps MPLS 2Mbps FR CIR Offenbach Cairo Nairobi Dar Es Salaam Antananarivo Mauritius Seychelles Sanaa Muscat Karachi New Delhi Tokyo Beijing Tehran Jeddah St. Denis 64 kbps FR 256 CIR Toulouse Deli Regional or interregional circuits RETIM transmission via Toulouse Additional circuits

Joint ICM GTS-WIS MTN & ET-OI Sep RETIM2000 Satellite Telecom System (Meteo-France)

Joint ICM GTS-WIS MTN & ET-OI Sep Australian Tsunami Warning System Objectives To provide a comprehensive tsunami warning system for Australia by June 2009 To support international efforts to establish an Indian Ocean tsunami warning system To contribute to the facilitation of tsunami warnings for the South West Pacific

Joint ICM GTS-WIS MTN & ET-OI Sep Deep-Ocean Tsunameter Deep-Ocean Assessment and Reporting of Tsunami (DART) buoys Established Iridium RUDICS account for access to Iridium modems on buoys NOAA PMEL supplied software modified and installed at CMSS CMSS receiving data and controlling buoys via Internet

Joint ICM GTS-WIS MTN & ET-OI Sep DART II System & Telecommunication Nodes Tsunameter Surface Buoy Iridium Satellite Network RF link Acoustic link DART II System Iridium Gateway RUDICS Server Internet Browser Web Server CMSS RF link

Joint ICM GTS-WIS MTN & ET-OI Sep DART buoy messages from RUDICS DART U12P D$1I 07/28/ :15: * 3F D$1I 07/28/ :15: * 3E D$1I 07/28/ :15: * 39 D$1I 07/28/ :15: * 3B D$1I 07/28/ :15: * 30 D$1I 07/28/ :15: * 3E D$1I 07/28/ :15: * 33 D$1I 07/28/ :15: * 3A D$1I 07/28/ :15: * 38 D$1I 07/28/ :15: * 31 D$1I 07/28/ :15: * 3B D$1I 07/28/ :15: * 39 DART U12P D$0 07/28/ :05: S E* 45 D$1I 07/28/ :15: * 3C D$1I 07/28/ :15: * 3E D$1I 07/28/ :15: * 3B D$1I 07/28/ :15: * 3E D$1I 07/28/ :15: * 38 D$1I 07/28/ :15: * 3D

Joint ICM GTS-WIS MTN & ET-OI Sep DART buoy bulletins distributed on GTS SZOC40 AMMC DART 55012P D$0 07/28/ :05: S E* 45 D$1I 07/28/ :15: * 3C D$1I 07/28/ :15: * 3E D$1I 07/28/ :15: * 3B D$1I 07/28/ :15: * 3E D$1I 07/28/ :15: * 38 D$1I 07/28/ :15: * 3D SZIO01 KWNB DD23401S D$0 07/28/ :12: N E* NN 00E SZIO01 KWNB DD23401P D$1I 07/28/ :15: * 35 D$1I 07/28/ :15: * 3C D$1I 07/28/ :15: * 33 D$1I 07/28/ :15: * 30 D$1I 07/28/ :15: * 38 D$1I 07/28/ :15: * 3E 00-0NN 00E

Joint ICM GTS-WIS MTN & ET-OI Sep New data representation code forms for more effective data exchange in sea level / DART data PMEL DART II format violated some GTS operational practices end of line uses, GTS uses start of message uses hex ‘1E’, GTS does not allow this character Coordinated with NDBC to use WMO buoy number as station identifier Drafted new CREX templates for sea level data and DART buoys for ET-DRC meeting 1-5 Sep 2008 New descriptors to report multiple sensors for tide gauges Pre-operational implementation with WMO/IOC member states

Joint ICM GTS-WIS MTN & ET-OI Sep Sea Level Station Data Communication Phase 1 Market evaluation & Cost analysis Network architecture & Equipment design Phase 2 Construction Deployment & commissioning Phase 3 Refinement Documentation

Joint ICM GTS-WIS MTN & ET-OI Sep 2008 ATWS Telemetry Requirements Reliable in all transmission conditions Marine hardware/profile (no dishes) Highly reliable engineered solution with demonstrable reliability (target > 99.8) Fixed cost model Access to service provider engineering resources Guaranteed throughput and resources providing 200 bytes at 1 minute intervals Scalable Coverage available in the Indian Ocean, Pacific Ocean and Australia

Joint ICM GTS-WIS MTN & ET-OI Sep 2008 Mobile Network Solution Originally installed as CDMA, network migrated to Next G due to upgrade of network provider Telstra Next G data network –AUD$29 per month on 70 Mbytes plan –Budget for domestic sites $50 per month

Joint ICM GTS-WIS MTN & ET-OI Sep 2008 Mobile Network Solution Telstra Next G Frame link-1 Frame Primary Telstra IP WAN BOM DRS Brisbane internal frame access BOM Primary Melbourne internal frame Next G Data modem/router BOM Weathernet Backup Secondary Message switch Primary Message switch Primary Authenticator Secondary Authenticator

Joint ICM GTS-WIS MTN & ET-OI Sep 2008 Satellite Solution C band product brought to market THISS Technologies StreamSAT Prima system –Budget for international sites AUD$500 per month –AUD $450 per month transmitting 200 bytes per min.

Joint ICM GTS-WIS MTN & ET-OI Sep 2008 THISS Network

Joint ICM GTS-WIS MTN & ET-OI Sep 2008

Australian Baseline Station at Portland, Victoria

Joint ICM GTS-WIS MTN & ET-OI Sep 2008 Typical THISS Installation Honiara, Solomon Islands in South Pacific

Joint ICM GTS-WIS MTN & ET-OI Sep 2008 Satellite Coverage - Current NSS 5 Pacific

Joint ICM GTS-WIS MTN & ET-OI Sep 2008 Satellite Coverage - APSTAR 5 Indian Ocean

Joint ICM GTS-WIS MTN & ET-OI Sep 2008 Satellite Coverage - Proposed migration MeaSat 3

Joint ICM GTS-WIS MTN & ET-OI Sep Registered user access to Bureau data and products on the web

Joint ICM GTS-WIS MTN & ET-OI Sep Registered ftp user access ftp://ftp.bom.gov.au/register/bom102/********/

Joint ICM GTS-WIS MTN & ET-OI Sep Thank You