1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II ASAC-2007, April. 23, 2007 NSLSII Footprint F. Willeke, April 23, 07 Accomodation of Extra Long Straights Considerations.

Slides:



Advertisements
Similar presentations
Slide: 1 Welcome to the Non Linear Beam Dynamics Workshop P. Elleaume Non Linear Beam Dynamics Workshop, ESRF May 2008.
Advertisements

Linear Collider Bunch Compressors Andy Wolski Lawrence Berkeley National Laboratory USPAS Santa Barbara, June 2003.
Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II ASAC-2007, April. 23, 2007 Injection System with a Booster in Separate Tunnel T. Shaftan for the NSLS-II team.
Lattice Status SuperB Project Workshop SLAC, October 6-9, 2009 Yuri Nosochkov for the SuperB Lattice Team Major recent updates by P. Raimondi and S. Sinyatkin.
1 BROOKHAVEN SCIENCE ASSOCIATES Considerations for Nonlinear Beam Dynamics in NSLS-II lattice design Weiming Guo 05/26/08 Acknowledgement: J. Bengtsson.
Dr. Zafer Nergiz Nigde University THE STATUS OF TURKISH LIGHT SOURCE.
SuperB Damping Rings M. Biagini, LNF-INFN P. Raimondi, SLAC/INFN A. Wolski, Cockroft Institute, UK SuperB III Workshop, SLAC, June 2006.
CESR-c Status CESR Layout - Pretzel, Wigglers, solenoid compensation Performance to date Design parameters Our understanding of shortfall Plans for remediation.
Damping Rings Baseline Lattice Choice ILC DR Technical Baseline Review Frascati, July 7, 2011 Mark Palmer Cornell University.
Luminosity Prospects of LHeC, a Lepton Proton Collider in the LHC Tunnel DESY Colloquium May F. Willeke, DESY.
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
Crab Cavities in IR1 and IR5 Some considerations on tunnel integration What will be the situation in the tunnel after the LHC IR Phase-1 Upgrade. What.
Yichao Jing 11/11/2010. Outline Introduction Linear lattice design and basic parameters Combined function magnets study and feasibility Nonlinear dynamics.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: the Accelerator System Briefing Conventional Facilities Advisory Committee May 8 - 9, 2007 Satoshi Ozaki Director,
The Overview of the ILC RTML Bunch Compressor Design Sergei Seletskiy LCWS 13 November, 2012.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
E. Karantzoulis - BESSY, June Elettra2.0-The next generation Emanuel Karantzoulis Circumference m 12 fold symmetry Energy 2 (& 2.4 GeV.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: Accelerator System Overview NSLS II Advisory Committees October 18/19, 2006 Satoshi Ozaki.
The Future of Photon Science and Free-Electron Lasers Ingolf Lindau Lund University and Stanford University MAX-Lab and Synchrotron Light Research KTH,
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
November 14, 2004First ILC Workshop1 CESR-c Wiggler Dynamics D.Rubin -Objectives -Specifications -Modeling and simulation -Machine measurements/ analysis.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Office of Science U.S. Department of Energy Containing a.
Insertion Devices: Wigglers and Undulators Session 6 Insertion Devices Group 11/1/12.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
ERHIC design status V.Ptitsyn for the eRHIC design team.
SuperB Lattice Studies M. Biagini LNF-INFN ILCDR07 Workshop, LNF-Frascati Mar. 5-7, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: the Accelerator System Briefing Experimental Facilities Advisory Committee May 10, 2007 Satoshi Ozaki Director,
1 BROOKHAVEN SCIENCE ASSOCIATES Lonny Berman EFAC May 10 th 2007 ID Beamline Optics and Damping Wigglers.
PEP-X Ultra Low Emittance Storage Ring Design at SLAC Lattice Design and Optimization Min-Huey Wang SLAC National Accelerator Laboratory With contributions.
For Layout of ILC , revised K.Kubo Based on following choices. Positron source: Prepare both conventional and undulator based. Place the.
FCC-ee booster: preliminary design study Dmitry Shwartz BINP
Present MEIC IR Design Status Vasiliy Morozov, Yaroslav Derbenev MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
T. Atkinson*, A. Matveenko, A. Bondarenko, Y. Petenev Helmholtz-Zentrum Berlin für Materialien und Energie The Femto-Science Factory: A Multi-turn ERL.
1 BROOKHAVEN SCIENCE ASSOCIATES 1 NSLS-II Lattice Design 1.TBA-24 Lattice Design - Advantages and shortcomings Low emittance -> high chromaticity -> small.
Parameter scan for the CLIC damping rings July 23rd, 2008 Y. Papaphilippou Thanks to H. Braun, M. Korostelev and D. Schulte.
Optics with Large Momentum Acceptance for Higgs Factory Yunhai Cai SLAC National Accelerator Laboratory Future Circular Collider Kick-off Meeting, February.
Optics considerations for PS2 October 4 th, 2007 CARE-HHH-APD BEAM’07 W. Bartmann, M. Benedikt, C. Carli, B. Goddard, S. Hancock, J.M. Jowett, A. Koschik,
HF2014 Workshop, Beijing, China 9-12 October 2014 Challenges and Status of the FCC-ee lattice design Bastian Haerer Challenges.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz IDS- NF Acceleration Meeting, Jefferson Lab,
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Off-axis injection lattice design studies of HEPS storage ring
J-PARC main ring lattice An overview
SLS-2 – Ugrade of the Swiss Light Source
Plans of XFELO in Future ERL Facilities
Options and Recommendations for TL and Dumps
NSLS-II Lattice Design Strategies Weiming Guo 07/10/08
Beam-beam effects in eRHIC and MeRHIC
Large Booster and Collider Ring
First Look at Nonlinear Dynamics in the Electron Collider Ring
Electron Polarization In MEIC
PETRA IV Lattice Studies
Potential Use of PEP-II Magnets by Project X
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
R. Bartolini Diamond Light Source Ltd
Progress of SPPC lattice design
ERL accelerator review. Parameters for a Compton source
XII SuperB Project Workshop LAPP, Annecy, France, March 16-19, 2010
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
Collider Ring Optics & Related Issues
Study on Emittance Reduction with a Robinson Wiggler in HEPS
Negative Momentum Compaction lattice options for PS2
Overall Considerations, Main Challenges and Goals
M. E. Biagini, LNF-INFN SuperB IRC Meeting Frascati, Nov , 2007
Transfer Line for EIC.
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
3.2 km FODO lattice for 10 Hz operation (DMC4)
JLEIC electron ring with damping wigglers
Presentation transcript:

1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II ASAC-2007, April. 23, 2007 NSLSII Footprint F. Willeke, April 23, 07 Accomodation of Extra Long Straights Considerations for Accommodating a possible ERL Upgrade into NSLSII

2 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II ASAC-2007, April. 23, 2007 Outline Extra Long Straights reducing symmetry quasi symmetry preserving solutions footprint preserving solutions Accommodating a possible ERL Upgrade into the NSLSII site Requirements and constraints for an ERL Performance of an ERL using the NSLSII Ring to distribute the Beams A possible Parameter Set Beam Loss and Shielding Considerations which determine S.C. Linac Overall Length A possible Footprint of a NSLSII-ERL Facility Items to be included in present planning to ease later upgrade of an ERL

3 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II ASAC-2007, April. 23, 2007 CD-1 Footprint 15-fold Lattice symmetry 27 Beam lines from Insertion devices 30 Beam lines from bends 3 Utility straight sections 15 of which see hard x-rays from 3-pole wiggler Symmetry will be weakly broken to 3-or-5 fold Because of large aperture dipoles in 3/5 locations

4 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II ASAC-2007, April. 23, 2007 Integrations of Extra-Long Straights Several Possibilities to implement: Reducing the lattice super-periodicity from 15 to 3 or 5 by introducing different achromats with extra long straights Inserting just two long straights optically matched to the achromat with a transparent lattice  x,y = n x 2  Bengtsson   Impact on footprint Extra-Long Straight Motivation: Nano-focussed beam and experiments with inelastically scattered soft X-rays would profit from extra long straight sections with an active undulator lengths of 10m-12m 3-fold or 5-fold symmetry Quasi 15-fold symmetry

5 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II ASAC-2007, April. 23, 2007 A solution based on Transparent Insertion   x =-1.039,  y =-3.01  Total length: m, free length 3 x 5.83 m   x /  y : 1.8/1.4, 3.0/1.3, 1.8/1.4 23m Insert On-Energy Transparent Optics  x,  y = n x 2  Courtesy Guo Wei Ming Requires verification for realistic conditions, (6D-beam, imperfections, ….)  Needs time

6 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II ASAC-2007, April. 23, 2007 A Possible Strategy of Providing extra long Straights Problem: Lattice Design effort has been centered in optimizing the achromatic super-period. Still to do: Integration of the entire ring with damping wigglers and insertion devices and verification of the stability and dynamic aperture Deadline for freezing the foot print: End of May (driven by start of CF Title I design )  There is not sufficient time to work out a well thought through concept of X-long straights, integrate it and assure stability of the entire ring. Desirable to base long straights on solutions which are compatible with the food print of a 15-fold symmetric lattice  Can finalize the symmetric lattice in a timely fashion to start building design and engineering design  Can continue to work on way to implement extra long straights and on assurance of single particle stability without time pressure of CD2

7 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II ASAC-2007, April. 23, 2007 Two examples of implementation of extra-long straights in 15-fold symmetric footprint Shorten Straights Shorten Arcs T = T 0 15  T = T 0 13  T 1 ≈ T0 14 T 1 = T T T T T T 1 h.o ≈ T 0 = T 0 20 =T 0 21 =0=T 0 22 =0=T 0 40 ≠T 0 h.o =T 0 30 =0 Require (breaks symmetry) Decomposition of lattice map in linear, nonlinear and chromatic parts

8 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II ASAC-2007, April. 23, 2007 Making a longer Long-Straights by Shortening two Short-Straights Lengthening long straight = 2 x shortening the short shtraight  Maximum long : 18m

9 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II ASAC-2007, April. 23, 2007 Geometry and Optics Geometry of the Lattice Possible Beam Optics

10 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II ASAC-2007, April. 23, 2007 ERL Integration Considerations (Nota bene: this is no attempt to lay out an ERL)

11 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II ASAC-2007, April. 23, 2007 Requirements and Constraints Ī Beam Losses critical, present Shielding insufficient Should go for significantly larger brightness should plan for higher energy than storage ring Should allow for sufficient Linac length Planning for ERL should minimize the additional effort for NSLSII Bending for returns and injection into the ring should be minimized Preserve an FEL option No planning which modifies the site appearance in an unfavorable way Necessary additional tunnels necessary should stay clear from existing buildings ERL should be planned such, that construction and commissioning can be parallel to NSLSII running Stay clear from road North of the site Stay clear from road West of the site

12 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II ASAC-2007, April. 23, 2007 Beam Losses ERL Beam Energy 4 GeV Beam Current 0.2 A Loss level 1E-6 Power Loss 400 W Particle Loss rate 1.25E12 Hz Storage Ring Beam Energy 3.6 GeV Beam Current 0.6 A lifetime 2 h Particle Loss rate 1.35E9 Hz Ratio off losses 831 Necessary increase in Shielding1.56m

13 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II ASAC-2007, April. 23, 2007 Short Parameter List Energy4 GeV Beam Current200 mA Normalized Emittance0.5  m Energy Spread Bunch Length 0.5 mm Linac gradient10 MV/m Linac Length 723 m

14 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II ASAC-2007, April. 23, 2007 Comparison of Brightness NSLS NSLS-II ERL Energy, GeV Current, mA Emittance X, nm Emittance Y, nm Energy spread, % BetaX, m BetaY, m Dispersion X, m Undulator Period, cm Length, m K

15 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II ASAC-2007, April. 23, 2007 Brightness Courtesy Timur Shaftan

16 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II ASAC-2007, April. 23, 2007 Flux Calculation Courtesy Timur Shaftan

17 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II ASAC-2007, April. 23, 2007 Possible Site Layout Compatible with NSLSII as planned Possible Footprint Vertical cut through the site source Dump Linac I Linac II Return Arc FEL Hall ~7m Scale in [m]

18 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II ASAC-2007, April. 23, 2007 Detail Footprint Commissioning loop FEL Exp Hall Possible Injection Scheme Horizontally separated vertical bends Lambertson septa s s D Scale in [m]

19 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II ASAC-2007, April. 23, 2007 What needs to be done now: Include a small radial vault underneath the Eastside of the Ring Rotate the facility footprint clockwise by ~25 Degree 25degree

20 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II ASAC-2007, April. 23, 2007 Conclusions Due to a compressed schedule and limited resources it might not be possible to include extra long straights in a timely fashion in the NSLSII footprint  Intend to base a later upgrade to extra long straights on a footprint with 15-fold lattice symmetry need to select potential positions soon, because we need - to enlarge the tunnel at these locations somewhat - to build-in some flexibility into the ratchet wall In order to ease the later integration of an ERL/FEL driven by a superconducting LINAC as a major upgrade project, some small modifications of the NSLSII footprint appear to be advisable: A small clockwise rotation A small piece of tunnel underneath the East-side of NSLSII shielding issue cannot be resolved, would have to be addressed in a different way