Increase Atchafalaya Flow to Terrebonne Governor’s Advisory Commission Meeting 7 August 2013 committed to our coast.

Slides:



Advertisements
Similar presentations
By: Richelle DeCuir Title 1 Wetlands Workshop January 15, 2004 Hi, Im Richelle DeCuir from CenLA. Im concerned because Louisiana supplies the largest port.
Advertisements

Feasibility Study Overview Louisiana Coastal Area Ecosystem Restoration 19 September 2000.
Permanent Protection System Opinion of Probable Cost May 2010 Courtesy USACE Photograph Courtesy USACE.
Wetlands Loss in Coastal Louisiana By the year 2050:  600 square miles of marsh will be lost  400 square miles of swamp will be lost  1,000 square miles.
Update on Southwest Louisiana Projects Office of Coastal Protection and Restoration.
Cameron Meadows Marsh Creation and Terracing (CS-66) Julia Wall, E.I. Engineering Division May 6, 2014 committed to our coast Coastal Protection and Restoration.
Restoring Environment- Maintaining Infrastructure; Tradeoffs for Long Term Sustainability Bob Stokes President Galveston Bay Foundation
The Coastal Wetlands Planning, Protection and Restoration Act Presentation for the National Science Teachers Association Meeting New Orleans, LA November.
SUSTAINABLE PLANNING APPROACHES FOR WATER RESOURCES: CASE STUDIES Samuel ASUMADU-SARKODIE Adapted from Spies, 2010.
US Army Corps of Engineers BUILDING STRONG ® Louisiana Coastal Area Modification of Davis Pond Study Overview Governor’s Advisory Commission on Coastal.
Mid-Barataria Diversion - Status Update committed to our coast Andrew Beall Project Manager Governor’s Advisory Commission Meeting December 5, 2012.
Bayou Dupont Sediment Delivery – Marsh Creation #3 (BA-164)
Southeast Louisiana Flood Protection Authority – East (SLFPA-E) and Pontchartrain Levee District Recommendations for Early Emergency Restoration Projects.
Title U.S. Department of the Interior U.S. Geological Survey Probable Production Induced Subsidence, Fault Reactivation, and Wetland Loss in the Gulf Coast.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Corps Regional Sediment Management and Habitat Restoration: Cape May, NJ J. Bailey Smith National Planning Center of Expertise for Coastal Storm Damage.
“Closing” the Mississippi River Gulf Outlet (MRGO): Environmental and Economic Implications Coastal Wetland Planning, Preservation, and Restoration Act.
Naples Bay Surface Water Improvement and Management (SWIM) Plan
The EU Water Framework Directive and Sediments The Water Framework Directive was transposed into law in EU Member States at the end of Nearly two.
Fiscal Year 2013 Annual Plan BRIEFING TO: COASTAL PROTECTION AND RESTORATION AUTHORITY Baton Rouge, LA January 18, 2012.
BUILDING STRONG ® US Army Corps of Engineers BUILDING STRONG ® Presentation to the: Governor’s Advisory Commission Chris Accardo Chief, Operations Division.
“Its All About the Sediment”
Mississippi River. River Facts Begins 200 miles north of Minneapolis at Lake Itasca State Park. Length: 2,352 miles Width: 20 ft at headwaters to 1 mile.
Fiscal Year 2009 Annual Plan: Ecosystem Restoration and Hurricane Protection in Coastal Louisiana.
April, 2008 Office of Coastal Restoration & Management PROJECT UPDATE Office of Coastal Restoration & Management PROJECT UPDATE.
CAMINADA HEADLAND BEACH / DUNE RESTORATION Governor’s Advisory Commission on Coastal Protection, Restoration and Conservation Meeting October 5, 2011.
DRAFT CORPS OF ENGINEERS CONTRACTS: Louisiana Coastal Area, Mississippi River Gulf Outlet, and Lake Pontchartrain & Vicinity Presented to the Coastal Protection.
Integrated Ecosystem Restoration and Hurricane Protection: Louisiana’s Comprehensive Master Plan for a Sustainable Coast.
LCA Mississippi River Hydrodynamic and Delta Management Study (MRHDMS) Carol Parsons Richards River Studies Manager Governor’s Advisory Commission on Coastal.
September 9, 2015 Grab a paper from the shelf and use your notes and the map below to complete.
Morganza to the Gulf of Mexico Project State & Local Views and Path Forward Jerome Zeringue CPRA.
Oil Spill Restoration Planning – NFWF Proposal No.1 Kyle Graham Deputy Director CPRA July 17, 2013 committed to our coast.
1 New Orleans District Morganza to the Gulf 23 May 2008 Carl Anderson, Senior Project Manager, USACE.
Coastal Restoration Project Selection in Louisiana: From CWPPRA to CIAP The Challenges of Natural Resources Economics & Policy Conference New Orleans,
SOUTHWEST COASTAL AND SOUTH CENTRAL PROJECTS – Update and Path Forward CPRA Meeting January 22, 2013 committed to our coast.
CPRA UNO Meeting August 13, urplus Funds 2008 $300 Million Surplus Funds Act 3 of the nd Extraordinary Legislative Session provides for:
Update On Mississippi River Delta Management Plan Presented at August 20, 2009, Meeting of Governor’s Advisory Commission on Coastal Protection, Restoration.
Update on the SOUTHWEST COASTAL LA Project Governor’s Advisory Commission Meeting August 7, 2013 Abbeville, LA committed to our coast.
Coastal Restoration Updates September 10, 2007 Coastal Restoration Updates September 10, 2007 Louisiana Department of Natural Resources Louisiana Department.
Recreational Impacts of Coastal Restoration Projects CNREP Presentation Joseph Berlin May 28, 2010.
Mississippi River Long Distance Sediment Pipeline Project Louisiana Office of Coastal Protection and Restoration Coastal Protection and Restoration Authority.
Restoring Deltaic Functions on the Mississippi Harley S. Winer, Ph.D., P.E. Atkins, Metairie, LA Harley S. Winer, Ph.D.,
05C112011B Template Master – Update Tracking Number and Date Information Here Update tracking number and date on this slide Template Master – Update Tracking.
Oil Spill Restoration Planning Part 2 (RESTORE Act, Criminal, NRDA, SEPs) Kyle Graham Deputy Director CPRA May 15, 2013 committed to our coast.
CONSERVATION AND RESTORATION PARTNERSHIP FUND FY 2014 Request For Proposals September 18, 2013.
July 20, 2011 Coastal Protection and Restoration Authority Deepwater Horizon Early Restoration.
The Science and Policy of Louisiana Coastal Ecosystem Restoration.
Building Strong 1 1 MRGO Ecosystem Restoration Plan Feasibility Study Gregory Miller Senior Project Manager Corps of Engineers New Orleans District October.
Central & Southern Florida Project George Horne Deputy Executive Director Operations & Maintenance Resource Area.
Consistency with the 2012 Coastal Master Plan: Guidelines for Restoration Projects Receiving State Funding Bren Haase CPRA Board Meeting September 18,
Spill Related Planning Efforts September 15, 2010 Kyle Graham Governor’s Office Coastal Activities.
Implementing the Master Plan Kyle Graham Deputy Executive Director CPRA June 20, 2012 committed to our coast.
1 Atchafalaya River and Bayous Chene, Boeuf, and Black, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting April 13, 2005 Project Manager.
LCA Program State Concerns Moving Forward February 25, 2010 Kyle Graham Governor’s Office Coastal Activities.
2017 Coastal Master Plan Overview Karim Belhadjali
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
Climate Change Threat Sea-Level Rise 1. Potential Impacts from Sea-Level Rise How might our community be impacted by sea-level rise? 2.
Wetlands Workshop Presented by Em LeBlanc. Let’s go on a Field Trip!
Creation of the Lower Pearl River Basin Ecosystem Study Commission ( LPRBESC) March 2016 Flood Conference June 21, 2016 E. deEtte Smythe, Ph.D. St Tammany.
Mississippi River. Names Great One Father of Waters “Great River” “Big River” Derived from the Ojibwe word misi-ziibi ("Great River") or gichi- ziibi.
Hydrology of Louisiana’s Wetlands Loss of Wetlands The coastal wetlands are eroding at exceedingly high rates. In the 1970s, when land loss rates were.
CPRA Program Update ACEC Project Outlook November 17th, 2016
Mississippi River Industries Vocabulary Flood Control Misc. 5 pt 5 pt
Continuing Authorities Program
Louisiana Coastal Area
CPRA Program Update ACEC Project Outlook 2017 November 16, 2017
Beneficial Use of Dredged Material
Diversions Update committed to our coast Kyle Graham, CPRA
2023 Coastal Master plan committed to our coast
FUNDS PROVIDED TO TEXAS
Presentation transcript:

Increase Atchafalaya Flow to Terrebonne Governor’s Advisory Commission Meeting 7 August 2013 committed to our coast

Coastal Protection and Restoration Authority of Louisiana Master Plan Projects

Coastal Protection and Restoration Authority of Louisiana Dredging of GIWW east of the Atchafalaya River and installation of a bypass structure at the Bayou Boeuf Lock to increase freshwater and sediment flows from the Atchafalaya River to Terrebonne marshes Modeled to maintain a minimum of 20,000 cfs east along the GIWW towards the HNC Included in the 1 st Implementation Period ( ). Engineering and design, construction, and operations and maintenance 50 year budget of $299M. Projected to build, sustain, or maintain square miles of land Master Plan Assumptions Specific Project Details

Study Area Map

Projected Future Land Loss – Master Plan Moderate Scenario

Target Area Map

Coastal Protection and Restoration Authority of Louisiana Purpose: Utilize freshwater and sediment from the Atchafalaya River in order to build, sustain, and maintain wetlands within the Terrebonne Basin Objective 1: Distribute Atchafalaya River resources to the Terrebonne Basin in order to increase the potential to build, sustain, and maintain wetlands Objective 2: Use material dredged from the GIWW as a component of this project to directly create additional wetlands within the project area Need: This project is needed in order to achieve, in part, the goals of the 2012 Louisiana Coastal Master Plan and address hydrologic alterations within the Terrebonne Basin. The lack of both freshwater and sediment inputs due to hydrologic alterations have resulted in increased saltwater intrusion and high subsidence rates, thus significantly contributing to wetland loss within the Basin. Project Specific Purpose and Need

Coastal Protection and Restoration Authority of Louisiana Project Kick Off Site Visit – May 30, 2013 Toured: Bubba Dove Flood Control Structure in the Houma Navigational Canal and potential future Houma Navigational Canal Lock site

Coastal Protection and Restoration Authority of Louisiana Project Kick Off Site Visit – May 30, 2013 Wetlands in the vicinity of Minor’s Canal to Marmande Ridge near Lake Theriot, Lake Decade, Lake Penchant, and Bayou Penchant

Coastal Protection and Restoration Authority of Louisiana Project Kick off Meeting Held – 23 May 2013 Data Gap Analysis Compete – September 2013 Alternatives Formulation, Evaluation, & Comparison - Summer 2013 – Summer 2014 Plan Selection – Summer 2014 DRAFT Project Schedule

Coastal Protection and Restoration Authority of Louisiana Questions/Comments

Coastal Protection and Restoration Authority of Louisiana Master Plan – Increase Atchafalaya Project Potential Marsh Creation Component

Coastal Protection and Restoration Authority of Louisiana Creation of approximately 1,190 acres of marsh along the GIWW in Terrebonne Basin (through sediment dredging of the GIWW) to create new wetland habitat, restore degraded marsh, and reduce wave erosion Included in the 1 st Implementation Period ( ). Engineering and design, construction, and operations and maintenance 50 year budget of $37M. Master Plan Assumptions Specific Project Details