Review of Agenda. Site Selection and Station installation Real Time Data Acquisition Specific Acquisition Systems SEED The Structure of the SEED Format.

Slides:



Advertisements
Similar presentations
Instituto de Meteorologia, I.P. Department of Seismic and Geophysical Monitoring NEAREST 1 st Meeting, Bologna, October 2006.
Advertisements

Numbers
Project name All Your Names Plan on no more than 8 minutes (no more than 5 slides).
Mapping the Election Mapping the Election: 2008 The following slides show maps of the 2004 Presidential Election results, the present composition.
In the next few minutes, you’re going to discover the truth about getting traffic to your site. You’ll realize that the way you’ve tried to get traffic.
Belgrade, Apr 2013 Radmila Salic, MSc. 2 nd Project Workshop Improvements in the Harmonized Seismic Hazard Maps for the Western Balkan Countries|
An introduction to PDCC the Portable Data Collection Center.
Bigger Better Business Programs to be implemented this year.
Iranian National Broadband Seismic Network (BIN)
Seismological Data Management at IAG-USP - Brazil Short SEISCOMP 3: USERS GROUP MEETING 2010 Bruno Collaço (iag-usp) September, 2010.
Portable Data Collection Center (PDCC) and the Nominal Response Library (NRL) Tim Ahern.
EVERY CONNECTION has a starting point. NetLibrary eAudiobooks Media Center Overview Nathan Downing Field Implementation Specialist & Training Developer.
Disaster Mitigation and Management Organization
IHRIS: Open Source Health Workforce Information Systems Pilot Project Name Event Location - Date.
NETWORK ADMINISTRATOR. EXAMPLES OF SOME COMPUTING RELATED CAREERS Multimedia Artist / Graphics Artist Information System Manager Computer Scientist Network.
Managing Waveform Data and Metadata for Seismic Networks Foz do Iguaçu, Brazil August 2010 Hosted by University of Sao Paulo and University of San.
Implementing UP 17 February Project Phases Analysis Implementation Evaluation Development Design.
Training begins in… 15:00 minutes Training begins in… 14:00 minutes.
By Tim Ahern, Director of Data Services, IRIS A short introduction to the IRIS Data Management System Data Holdings, Data Organization, and Data Access.
Seismic Network in PNG Port Moresby Geophysical Observatory (PMGO)
Automated Data Quality Assurance: QUACK and MUSTANG Mary Templeton IRIS Data Management Center Mary Templeton IRIS Data Management Center.
ORFEUS Torild van Eck & Chad Trabant Why is ORFEUS interested in distributed OO computing? Presentation ORFEUS Present status Orfeus Data Center ORFEUS.
Seismic Monitoring Capabilities of Pakistan By Nasir Mahmood, Pakistan.
Working Group I Seismic Imaging of the Crust and Mantle -- USArray/ChinArray Comparative Studies Co-Chairs: Rob van der Hilst and John Chen 1.Data. Focus.
Facilitate – Collaborate – Educate Thursday January 12, 15:30 January 10, 2012 Metadata Workshop, Bangkok, Thailand.
Building Station Metadata with PDCC
Real-time Waveform Data Exchange. November 2009 Cairo, Egypt IRIS - ORFEUS Data Management Workshop Real-time Data Exchange 1 Allows automated integration.
July 27, 2014Metadata Workshop, Bogotå Metadata Help from the DMC Our motivation is to enable networks to perpetually archive their data in open and accessible.
Station Metadata The NRL (Nominal Response Library) Dr. Mary Templeton IRIS Data Management Center Managing Data from Seismic Networks September
15 MINUTE TIMER Pick a slide for the minutes you want to set. Start the PowerPoint. (slide show, start from current slide) Slides will change every minute.
FDSN WG III Coordination of Products, Tools and Services Tuesday 13 January :00-18:30.
10-1 人生与责任 淮安工业园区实验学校 连芳芳 “ 自我介绍 ” “ 自我介绍 ” 儿童时期的我.
Images were sourced from the following web sites: Slide 2:commons.wikimedia.org/wiki/File:BorromeanRing...commons.wikimedia.org/wiki/File:BorromeanRing...
UOP HRM 326 Week 4 Learning Team Delivery Methods Check this A+ tutorial guideline at
Station Metadata: What do I Need?
The FDSN and International Data Exchange
Requesting a Standardized Data Set for the FDSN Network
Requesting a Standardized Data Set for the FDSN Network
continued on next slide
Постојан Твининг Советник од земјата корисник
EPOS – ORFEUS Seismology Workshop Seismic Infrastructure in Spain:
Hire Toyota Innova in Delhi for Outstation Tour
Yahoo Mail Customer Support Number
TECHjOSH.COM TechJosh.com.
Most Effective Techniques to Park your Manual Transmission Car
How do Power Car Windows Ensure Occupants Safety
                                                                                                                                                                                                                                                
continued on next slide
continued on next slide
ريكاوري (بازگشت به حالت اوليه)
Tool: Gather Metrics This slide represents a handout you have, that shows sample performance goals you can leverage from the HR Advancement Center’s Performance.
HELLO THERE. THIS IS A TEST SLIDE SLIDE NUMBER 1.

إدارة وتنمية مصادر المعلومات
THANK YOU!.
Shop.raspberryshake.org 24 bits 100 samples/second NTP timing 0.5 to 25 Hz Seedlink server Auto updates.
Monday January 10, 14:05 Metadata Workshop, Bangkok, Thailand
Working Group I Meeting time: July 31, 12:00 – 13:30 Place: Room 503
Thank you.
Thank you.
Coordination of Products, Tools and Services
Review of Agenda.
15 minute Timer Use for: Mad Minutes Game playing Center Rotation
MUSTANG Training Session for North American Regional Networks
TITLE OF THE PRESENTATION
Overview of slide-based artworks in Tate’s collection:
ModernPresenter: How To Build A Storyboard
continued on next slide
continued on next slide
Presentation transcript:

Review of Agenda

Site Selection and Station installation Real Time Data Acquisition Specific Acquisition Systems SEED The Structure of the SEED Format Portable Data Collection Center Application Nominal Response Library (NRL) Practice, Practice, Practice Working with the IRIS DMC Level 0 & 1 Data Data Products Level 2, 3 and 4 ObsPy Training Seiscomp3 Training Scientific Uses of BB Data Quality Assurance using MUSTANG Structured Agenda

Limited to 15 minutes total No more than 12 slides 12 minutes to present 3 minutes for questions Be sure to show maps of stations and lists showing locations Future Plans Thanks to everyone that provided the reports in a timely manner Network Reports