Constraint Management Plans (CMPs) An Ops Planning Perspective Nitika Mago Operations Planning, ERCOT.

Slides:



Advertisements
Similar presentations
Additional CREs to address Stability Limits Beth Garza TAC June 26, 2008.
Advertisements

NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
Overview of ERCOT Outage Coordination Woody Rickerson Director Grid Coordination January 2015.
Discussion: Use of RAPs in system operations Kris Dixit 1.
Outage Coordination Overview D.W. Rickerson ERCOT Outage Supervisor 12/1/2008.
System Voltage Planning Brian Moss PD / Transmission Planning Transmission Planning Overview October 30, 2007.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
Real-Time Transmission Congestion Management & Market Effects
OPERATING IN THE EAGLE FORD SHALE
Valley Import Overview Jeff Billo Regional Planning Group Meeting July 22, 2014 Preliminary1.
June 6, 2007 TAC Meeting NERC Registration Issues Andrew Gallo, Assistant General Counsel, Litigation and Business Operations ERCOT Legal Dept.
Small Signal Stability Analysis Study: study prepared by Powertech Labs Inc. for ERCOT Vance Beauregard AEP 9 April 2002.
ERCOT Compliance Audits Robert Potts Sr. Reliability Analyst March 23, 2005.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
FRCC Seasonal Transmission Assessment & Operational Seasonal Study Winter 2012.
ERCOT SOL Methodology for the Planning and Operations Horizons Stephen Solis 2014 OTS 1.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
Peak RCCo Performance Metrics Draft –November 2013.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
April 16, 2010 RPG Meeting ERCOT Five-Year Transmission Plan Update Jeff Billo.
Reliability Requirements Bill Blevins Manager of Operations Support ERCOT.
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
April, 2008 Maximum Shadow Price. April, 2008 Protocol Requirement: Transmission Constraint Management (2)ERCOT shall establish a maximum Shadow.
March 11, 2011 RPG Meeting Lower Rio Grande Valley (LRGV) Import.
EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb.
NPRR514, Seasonal Generation Resource Wholesale Market Subcommittee April 12, 2013 Amanda Frazier.
June 19, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
1 ERCOT Nodal Protocols Telemetry Requirements. 2 Protocol References Telemetry TAC will establish TASK force and approve a telemetry criteria.
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
Economic Planning Criteria Question 2 1/7/2011 Joint CMWG/PLWG Meeting March 4, 2011.
Chad Thompson, ERCOT Special ROS PGRR011 Workshop October 21 st, 2011 SCED Overview and Results.
Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 8, 2007 Trip Doggett.
Responding to post contingency overloads, IROL’s and SOL’s Art Gardiner – CPS Energy Steve Rainwater - LCRA 1.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
© Property of ERCOT /17/20041 RTCA, CAM, and SFT Presented by: John Adams November 17, 2004.
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
February 3, 2011 TAC ERCOT Planning Go-Live Update Jay Teixeira Manager, Model Administration.
October 16, 2009 RPG Meeting ERCOT Independent Review of the Corpus Christi Improvements Project Jeff Billo.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
ERCOT 2004 RELIABILITY ASSESSMENT (CONTINGENCY EVALUATION) Purpose Test ERCOT transmission system one year in advance Determine if meeting planning criteria.
Scheduling and Operating Transmission Devices in the Nodal Environment.
ERCOT PUBLIC November RPG Meeting RTP – Study Scope November 20, 2015.
1 ORDC Curve Discussion ERCOT QSE Managers Working Group 9/4/2015.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
PLWG Report to ROS September 4, PGRR039 PGRR requires Interconnecting Entities (IEs) to provide information for ERCOT’s resource adequacy reports,
POWER SYSTEM PLANNING CHARTER AND PROCESSES Presentation to TAC May 6, 2004 Transmission Services Ken Donohoo, Manager of System Planning Dan Woodfin,
Joint PLWG/CMWG Assignment Update to ROS September 15, 2011.
Transmission Services Report: North and West RPG Projects Bill Bojorquez TAC July 7, 2005.
ERCOT PUBLIC 3/25/ RTP Inputs and Assumptions March 25, 2014.
Response to TAC Questions on PGRR031 TAC– January 28, 2014 Jeff Billo, ERCOT 1.
Proposal for Consideration Regarding Holistic Solution to Congestion Irresolvable in SCED Issue:How do you identify when constraint is irresolvable Proposal:Adopt.
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director,
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
RELIABILITY AND OPERATIONS SUBCOMMITTEE Report to TAC Austin, TX December 1, 2011 Kenneth A. Donohoo, P.E. Chairperson Oncor Electric Delivery Company.
EDS 2 Early Delivery Systems Approach March 2007.
Information Needed By All Market Participants To Facilitate Transmission Congestion Studies In ERCOT Presented to the ERCOT ROS by Shannon Caraway, P.E.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
NMT – Network Operations Modeling & Telemetry - Project
Modeled Load Levels in the Valley
Transmission Planning in ERCOT- Overview
NPRR833 Workshop: Contingency Processing in CRR, DAM and SCED
ERCOT 2009 Five-Year Transmission Plan Update
Southern Cross Directives Planning Items
Phase Angle Limitations
Agenda Provide a recap of primary northern route alternatives for the MPRP Describe basis for selected route N5 Overview of analyses performed Description.
Presentation transcript:

Constraint Management Plans (CMPs) An Ops Planning Perspective Nitika Mago Operations Planning, ERCOT

An Introduction to Constraint Management Plans –What/Why, Types Overview of the Annual CMP Review Process –What/Why, When, Who’s involved –Study Case, Contingency Definitions –Criteria Used in Studies 2015 Review Summary –Initial Details – kick off, case used, case changes –Highlights of the Review –A Pick-list of plans Agenda 2

Set of pre-defined actions executed in response to system conditions To prevent or to resolve one or more thermal or non-thermal transmission security violations or to optimize transmission. Typically developed in cases where studies indicate economic dispatch alone may be unable to resolve a transmission security violation What are CMPs? Why are CMPs needed? 3

Remedial Action Plans (RAPs) –may be relied upon for allowing additional use of transmission system in SCED –are modeled in CIM. –constrained element must have a 15-minute rating >= its normal & emergency rating –must not include load shed. Mitigation Plans (MPs) –shall not be used to manage constraints in SCED –must be implemented in a timeframe that will not result in loss of the constrained element/facility –may include load shed. Pre-Contingency Action Plans (PCAPs) –may be implemented in anticipation of a contingency –must not include load shed. Temporary Outage Action Plans (TOAPs) –Temporary CMP, live & die with an outage. –shall not be used to manage constraints in SCED –must be implemented in a timeframe that will not result in loss of the constrained element/facility –may include load shed. Common Types of CMPs 4

An Introduction to Constraint Management Plans –What/Why, Types Overview of the Annual CMP Review Process –What/Why, When, Who’s involved –Study Case, Contingency Definitions –Criteria Used for selection 2015 Review Summary –Initial Details – kick off, case used, case changes –Highlights of the Review –A Pick-list of plans Agenda 5

Objective –Generate a set of CMPs to address anticipated reliability issues in the upcoming year. Scope –Existing CMPs –CMPs proposals (may include plans emanating from system planning studies) Time Frame for Review –March to May Participants –All Market Participants Study Case –SSWG Planning Cases are relied upon (Summer Peak) –Load & Generation in this case are analyzed and may be altered as necessary to build a scenario that is reflective of (extreme) peak conditions anticipated in the upcoming Summer season. Overview of Annual CMP Review Process 6

Contingency –For CMP replication purposes Operations Contingency (Breaker-to-Breaker) are overlaid on the planning case. –For CMP viability (i.e. N-1 studies post CTG & CMP action; to ensure no new violation is created) A blend of contingencies posted by SSWG are used. Criteria for CMP Selection Approval Process (applicable for CMPs that meet the Activate criteria) –Coordinated process involves soliciting review & approval from all involved TSPs and REs as applicable. Overview of Annual CMP Review Process 7

An Introduction to Constraint Management Plans –What/Why, Types Overview of the Annual CMP Review Process –What/Why, When, Who’s involved –Study Case, Contingency Definitions –Criteria Used in Studies 2015 Review Summary –Initial Details – kick off, case used, case changes –Highlights of the Review –A Pick-list of plans Agenda 8

Kick Off -March 11, Review Highlights 9

Submittals Reviewed 196 Proposals Submitters included 2015 Review Highlights 10

Approvals Approved 55 CMPs (21 Existing, 11 New) Removed 25 CMP On-Shelf 40 CMPs 9 N-1 (3 Existing, 8 New) 31 N-i related CMPs 2015 Review Highlights 11

TypeIDDocumentContingencyTSP/MPNote MPsMP_2013_29 Alice (ALICE) kV transformer.doc XALI89AEPMaintain MPsMP_2014_49 Edison_Orsted_SSR_.doc MultipleETT/AEPMaintain MPsMP_2013_07 Eskota Sw kV Autotransformer.docx XESK89ONCORMaintain MPsMP_2012_07 FormosaAuto 21 and 22_hi EXPORT.docx XFO2R89 or XFO3R89N/AMaintain MPsMP_2012_08 FormosaAuto 21and22_hi-IMPORT.docx XFO2R89 or XFO3R89N/AMaintain MPsMP_2014_01 Lon Hill - Smith 69kV line (LON_HI_SMITH1) rev 2.doc SORNLON8, DLONOR58AEPMaintain MPsMP_2010_22 Minerva 138,69 kV Autotransformer.doc XMNR89T1ONCORMaintain MPsMP_2013_27 Monticello Area.doc MNSES gen OFFLINEAEP, ONCORMaintain MPsMP_2014_25 MP_BigLakeAuto_XBGL89_XBG2L89.docx XBGL89 or XBG2L89AEPMaintain MPsMP_2014_53 MP_Bruni_Auto_138kV_69_XF.docx SLAQLOB8STEC, AEPMaintain MPsMP_2015_08 MP_Forest_Hill_138_69_kV_XF.docx XFHL89ONCORNew MPsMP_2015_02 MP_Fort_Lancaster_-_Mesa_View_Switch_138kV_line.docx SFTLMES8AEPNew MPsMP_2015_05 MP_Hillsboro_138_69_kV_XF.docx XHL2S89ONCORNew MPsMP_2015_08 MP_Hutto_-_Rnd_Rck_Gabriel_138kV_Double_Circuit_Line_rev.docx DHUTGAB8ONCORNew MPsMP_2015_07 MP_Permian_Basin_138_69_kV_Autotransformer.docx XPB2S89 or XPB1S89ONCORNew MPsMP_2014_22 MP_Turtle_Creek_to_Uvalde_OR_Crystal_City_69kV.doc SLA_UVA9 or SCRYTUR9AEPMaintain MPsMP_2014_30 MP_WillsPoint_XTRL89.docx XTRL89ONCORMaintain MPsMP_2015_09 MP_Wink_138_69_kV_XF_OR_Wink_TNMP_Wink_138kV_LN.docx XWI2N89 or SWINWIN8TNMPNew MPsMP_2015_02 SLIVGIL9_MP.doc SLIVGIL9 & DGILFR89LCRANew MPsMP_2014_52 SRULASP9_MP.doc SRULASP9, SHSKRUL9, SGILROC9 AEP, BEPCMaintain MPsMP SSIGSAN8_MP.doc SSIGSAN8AEPMaintain MPsMP_2011_08 Valley Import.doc Multiple AEP, STEC, BPUB, SHARYLAND Maintain MPsMP_2015_01 XAND189_MP_rev2.doc XAND189ONCORNew PCAPsPCAP_2010_02 DBIGKEN5_PCAP.doc DBIGKEN5AEPMaintain PCAPsPCAP_2013_03 Elgin Switch (ELGSW) kV Autotransformer.doc XELG89ONCORMaintain PCAPsPCAP_2014_01 FREER to LOBO 69kV.doc SSANALI9ONCORMaintain PCAPsPCAP_2010_01 LCRA Fort Mason - Yellow Jacket 138 kV Circuit.doc SFORYLJ8AEPMaintain PCAPsPCAP_2013_01 LOBO to San Miguel 345kV Line or Lobo 345,138 kV Autotransformer.doc SLOBSAN5 or XLOB58AEPMaintain RAPsRAP_2012_01 Allen Sw. - RoyseMonticello Double-Circuit 345 kV Line.docx DALNRYS5ONCORMaintain RAPsRAP_2012_05 Baytown Autotransformers AT1 and AT2.doc SBTECH25 or SBTECHB5CALPINEMaintain RAPsRAP_2012_04 Lewisville Switch -Autotransformer 2.doc XLWS58BEPCMaintain RAPsRAP_2015_07 RAP_Navarro_Limestone_Plant_345_kV_Double_Circuit_Lines.docx DNAVLEG5ONCORNew RAPsRAP_2015_06 RAP_Salem_-_Fayette_Power_Plant_345kV_line.docx SSALFPP5LCRANew RAPsRAP_2015_08 RAP_Salem_-_Fayette_Power_Plant_345kV.docx DSALFA58LCRANew 12 A Pick-list of Approved CMPs

Completion -June 1, Review Highlights 13

An Introduction to Constraint Management Plans –What/Why, Types Overview of the Annual CMP Review Process –What/Why, When, Who’s involved –Study Case, Contingency Definitions –Criteria Used in Studies 2015 Review Summary –Initial Details – kick off, case used, case changes –Highlights of the Review –A Pick-list of plans Agenda 14

Questions? Nitika Mago