SG3 (Optical Access and Transport) Progress Report 23-07-2015 Meeting Chair: Mr Jishnu Aravindakshan, Chair SG3 Meeting Co-chair: Mr Gupteswar Majhi, Vice.

Slides:



Advertisements
Similar presentations
ITU-T Workshop on IP/Optical Chitose, 9-11 July 2002 Session Network Performance N eal Seitz, Chair SG 13/WP 4 IP Performance Specifications: Progress.
Advertisements

Climate Change Advisory Committee July 17, Welcome & Introductions.
CCAMP Working Group Milestone Discussion IETF 84 84th IETF CCAMP Working Group 1.
Doc.: IEEE /0072r0 Submission September 2014 Hyunduk Kang, ETRISlide 1 September 2014 IG CUB Closing Report Notice: This document has been prepared.
INDIA IN GLOBAL TELECOM STANDARDIZATION FROM JEJU TO SOPHIA A. K. Mittal, Sr. DDG & Head (TEC), Department of Telecommunications, Govt. of India GSC-18.
INDIA IN GLOBAL TELECOM STANDARDIZATION FROM JEJU TO SOPHIA A. K. Mittal, Sr. DDG & Head (TEC), Department of Telecommunications, Government of India GSC-18.
University of Edinburgh (McEwan Hall) Dr. Richard Clark & Mr. John Davis University of London & University of Wolverhampton SITS Trainers Network.
Minutes of the Meeting IoT WG GISFI #7 New Delhi, Dec 19-22, 2011 Doc No: GISFI_IoT_
GISFI_CSeON_XXXXGISFI#11, Dec CSeON WG (GISFI#11) Agenda GISFI # 11, Dec 18-20, 2012, Bangalore Chair: Parag Pruthi, NIKSUN Chair-Delegate:
NGN Work in ITU-T SG Yukio Hiramatsu Chairman of ITU-T SG11 1GSC-9, Seoul SOURCE:ITU-T TITLE:NGN Work in ITU-T SG11 AGENDA ITEM:5.0 CONTACT:Yukio.
CPRI-T (Fronthaul through transport of CPRI signal from RRH to the C-RAN baseband.) Jishnu Aravindakshan.
78 IETF, Maastricht, Netherlands
CLOSING SESSION REPORT Dirk Weiler, GSC-18 Chairman GSC-18 Meeting, July 2014, Sophia Antipolis, France Document No: GSC(14)18_043 Source: GSC-18.
ITU-R Liaison Group Report - Session #70 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /00xx Date.
NGN Management Focus Group 2 November 2004 Dave Sidor Interim Chairman Nortel Networks Tel Fax
Doc.: IEEE /212r0 Submission May 2001 John Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks (WPANs)
CLUE WG IETF-89 Mary Barnes (WG co-chair) Paul Kyzivat (WG co-chair)
GISFI_CSeON_XXXXGISFI#11, Dec Report – CSeON WG GISFI #11 GISFI # 11, Dec 18-20, 2012, Bangalore Chair: Parag Pruthi, NIKSUN Chair-Delegate:
Session # TGn Opening Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE gman-10/0036 Date Submitted:
3GPP Rel-13 Interworking discussions
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
Office of the Federal Coordinator for Meteorology WORKING GROUP FOR WEATHER INFORMATION FOR SURFACE TRANSPORTATION (WG/WIST) Meeting 05-4 Office of the.
CCAMP WG, IETF 81th, Quebec City, Canada draft-zhang-ccamp-gmpls-evolving-g txt Authors & Contributors GMPLS Signaling Extensions for the Evolving.
ITU-R Liaison Group Report - Session #63.5 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0111r1.
MEAD team meeting in Kista July 23 – 26 (to be bashed)
July 2014IETF TRILL WG1 TRILL Working Group TRansparent Interconnection of Lots of Links Mailing list address: Tools site:
GISFI_SP_ GISIF#8, , March GISFI#8 Security & Privacy Working Group: Report Company:NEC Corporation Author(s):Anand R. Prasad, Chair.
Doc.: IEEE /0887r0 Submission July 2012 Eldad Perahia, Xiaoming PengSlide 1 Date: Authors: China MM-Wave (CMMW) Study Group July 2012.
Session 10: Optical Switching and Equipment ITU-T Study Group 15, Q12 Michael Mayer Nortel Networks.
December 30, 2015 Richard Chien Marko Lai Jason Yuan
16ng Interim Mtg, Sep ng WG IP over IEEE Networks Interim Meeting Soohong Daniel Park
TST WG Progress Report at TP #20 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP20, Item.
1 ITU-R Liaison Group Report - Session #71 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0127.
ITU-R Liaison Group Report - Session #74 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0037 Date.
Note Well Any submission to the IETF intended by the Contributor for publication as all or part of an IETF Internet-Draft or RFC and any statement made.
Update on ITU-T FG IMT-2020 Glenn Parsons March 2016.
Doc.: IEEE /1583r1 Submission November 2011 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac November 2011 Closing Report Date: Authors:
Goals and objectives Project(s): MBH IA Phase 4 Transport for 5G Networks Purpose of the contribution: Input to MBH IA Phase 4 Abstract: Overview on the.
DETNET crosshauling requirements draft-bernardos-detnet-crosshaul-requirements Carlos J. Bernardos (UC3M), Antonio de la Oliva (UC3M), Luca Cominardi (InterDigital),
WT CALL – 04/10/
India in Global Telecom Standardization From Jeju To Sophia
P802.1CM Time-Sensitive Networking for Fronthaul
IEEE P802.22b Sep 2014 Plan & Report
Marketing Committee Progress Report Albuquerque,NM Mar 6-10 , 2000.
SA WG6 status report to TSG SA#77
Crop Nutrition Council Annual Meeting
2018 Leadership Conference “LEADERCON 2018”
2018 Leadership Conference “LEADERCON 2018”
ITU-T Workshop on IP/Optical Chitose, 9-11 July 2002 Session 9 – Optical Network Management Kam Lam (Lucent) – SG15 Q14 Rapporteur & Nobuo Fuji (NTT)
Submission Title: Closing Report for the TG4n Session in May 2012
ITU-T Workshop on IP/Optical Chitose, 9-11 July 2002 Session 5 -- Optical/IP Network OAM and Protection and Restoration Ghani Abbas SG15 Q9.
Liaison Report Date: Author: Sept 2007 Month Year
Liaison Report Date: Author: Jan 2008 Month Year
IEEE White Space Radio Status Report
Cambridgeshire Lupus Group 24th Annual general Meeting
John W. Gardner Center for Youth and Their Communities
IEEE P802.22b May 2014 Plan & Report
Program Prioritization & SBCC Schedule
TSDSI Overview and Priorities
AT&TEricsson Huawei Technologies Co. Samsung Electronics Co. Hewlett Packard Enterprise (HPE)
IEEE White Space Radio Status Report
Supplementary Plenary Information - March 2010
Mar Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Summary of CWPAN (LR-WPAN Group) Actives in.
IEEE P802.22b May 2014 Plan & Report
Task Group BA - March 2017 March 2017 Since the last F2F meeting
Commission for Instruments and Methods of Observation
Meeting Agenda 07:30 Coffee, Sign-in & Fare
Report from HoD meeting
IEEE P802.22b May 2014 Plan & Report
Internet of Things (IoT) Work Group
Presentation transcript:

SG3 (Optical Access and Transport) Progress Report Meeting Chair: Mr Jishnu Aravindakshan, Chair SG3 Meeting Co-chair: Mr Gupteswar Majhi, Vice Chair SG3

Agenda  23 rd July 2015, Thursday (Room No: 308, IIIT-B, Electronic City, Bangalore (Opp Infosys campus, Gate 1))  Session 1 ◊9-9.30: Registration ◊ : o Approval of Agenda o Introduction of SG3 Vice Chair o Approval of Minutes of previous meetings and work plan o Any other item ◊10.30: 11.00: Tea Break 2© TSDSI 2015

Agenda  Session 2 ◊ : o Discussion on Terms of Reference (NIP 40) o Discussion on NIP for New work item on E- band point to point MW (NIP7) o Discussion on Creation of framework document for CPRI-T (SWIP01) ◊ : Lunch Break ◊ : o Further discussion on NIP40 and SWIP01 ◊ : Tea Break ◊ : o Approval of ToR o Approval of draft Minutes of Meeting o Closing of SG3 meeting 3© TSDSI 2015

Welcome  IIITB and Prof Dr. Debabrata Das, Dean - Academic and R&D, Professor and Hewlett Packard Chair, I I I T – Bangalore for hosting the SG1 and SG3 F2F meeting.  Introduction of Mr Gupteswar Majhi, Vice Chair SG3 elected on July 13 th 2015  Minutes of the Meeting: ◊Conference Call 01: On 22/04/2015Conference Call 01: On 22/04/2015 ◊Conference Call 02: On 04/06/2015Conference Call 02: On 04/06/2015 ◊Conference Call 03: On 09/07/2015Conference Call 03: On 09/07/2015 4© TSDSI 2015

Work Plan 5© TSDSI 2015 Work Item No Supporters/ Contributors Identificatio n tag Description 01 Ericsson, Huawei, Intel, Tejas CPRI-T Fronthaul through transport of CPRI signal from RRH to the C- RAN baseband. 02 Huawei, TejasSDN-T Specifying the southbound interface, controller and northbound interface for OTN, MPLS-TP, Carrier Ethernet, DWDM/ROADM, IP/MPLS equipment used in various backhaul layers 03 Airtel, Ericsson, Huawei VBANDV-band point to point connection 04Airtel, TejasOTNINTROPOTN interoperation w.r.t. protection and OAM 05Ericsson, TCILEBANDE-band point to point connection

Work Item and NIPs 6© TSDSI 2015 Work Item No NIP No Identificatio n tag Description 01NIP 9CPRI-OPT Fronthaul through optical transport of CPRI signal from RRH to the C-RAN baseband. 05NIP 7EBANDE-band point to point connection 06NIP 8CPRI-EBANDFront haul in E-band for connected through a CPRI interface between radio unit and the baseband. NIP 8,9 combined as a single study item SI01

Backhaul WG Plan FY15-16 © TSDSI 20157

CN WG/SG Work flow 8© TSDSI 2014 MayJun JulAugSepOct Nov Dec Framework Document Concall NIP Consolidation done Concall & F2F Meeting JanFeb Mar Standard F2F meeting for finalization Concall

THANK YOU Jishnu Aravindakshan/Gupteswar Majhi