SG3 (Optical Access and Transport) Progress Report Meeting Chair: Mr Jishnu Aravindakshan, Chair SG3 Meeting Co-chair: Mr Gupteswar Majhi, Vice Chair SG3
Agenda 23 rd July 2015, Thursday (Room No: 308, IIIT-B, Electronic City, Bangalore (Opp Infosys campus, Gate 1)) Session 1 ◊9-9.30: Registration ◊ : o Approval of Agenda o Introduction of SG3 Vice Chair o Approval of Minutes of previous meetings and work plan o Any other item ◊10.30: 11.00: Tea Break 2© TSDSI 2015
Agenda Session 2 ◊ : o Discussion on Terms of Reference (NIP 40) o Discussion on NIP for New work item on E- band point to point MW (NIP7) o Discussion on Creation of framework document for CPRI-T (SWIP01) ◊ : Lunch Break ◊ : o Further discussion on NIP40 and SWIP01 ◊ : Tea Break ◊ : o Approval of ToR o Approval of draft Minutes of Meeting o Closing of SG3 meeting 3© TSDSI 2015
Welcome IIITB and Prof Dr. Debabrata Das, Dean - Academic and R&D, Professor and Hewlett Packard Chair, I I I T – Bangalore for hosting the SG1 and SG3 F2F meeting. Introduction of Mr Gupteswar Majhi, Vice Chair SG3 elected on July 13 th 2015 Minutes of the Meeting: ◊Conference Call 01: On 22/04/2015Conference Call 01: On 22/04/2015 ◊Conference Call 02: On 04/06/2015Conference Call 02: On 04/06/2015 ◊Conference Call 03: On 09/07/2015Conference Call 03: On 09/07/2015 4© TSDSI 2015
Work Plan 5© TSDSI 2015 Work Item No Supporters/ Contributors Identificatio n tag Description 01 Ericsson, Huawei, Intel, Tejas CPRI-T Fronthaul through transport of CPRI signal from RRH to the C- RAN baseband. 02 Huawei, TejasSDN-T Specifying the southbound interface, controller and northbound interface for OTN, MPLS-TP, Carrier Ethernet, DWDM/ROADM, IP/MPLS equipment used in various backhaul layers 03 Airtel, Ericsson, Huawei VBANDV-band point to point connection 04Airtel, TejasOTNINTROPOTN interoperation w.r.t. protection and OAM 05Ericsson, TCILEBANDE-band point to point connection
Work Item and NIPs 6© TSDSI 2015 Work Item No NIP No Identificatio n tag Description 01NIP 9CPRI-OPT Fronthaul through optical transport of CPRI signal from RRH to the C-RAN baseband. 05NIP 7EBANDE-band point to point connection 06NIP 8CPRI-EBANDFront haul in E-band for connected through a CPRI interface between radio unit and the baseband. NIP 8,9 combined as a single study item SI01
Backhaul WG Plan FY15-16 © TSDSI 20157
CN WG/SG Work flow 8© TSDSI 2014 MayJun JulAugSepOct Nov Dec Framework Document Concall NIP Consolidation done Concall & F2F Meeting JanFeb Mar Standard F2F meeting for finalization Concall
THANK YOU Jishnu Aravindakshan/Gupteswar Majhi