RBM and Asset Strategy.

Slides:



Advertisements
Similar presentations
Project Quality Plans Gillian Sandilands Director of Quality
Advertisements

Module N° 4 – ICAO SSP framework
The Business Analyst and the SDLC
Secure Systems Research Group - FAU Process Standards (and Process Improvement)
Vice President of Facilities
ITIL: Service Transition
Hillyard – Vektr CQI ™ Continuous Quality Improvement Hillyard Inc. has partnered with Nuvek LLC, to gain hosting capabilities for a new and innovative.
Project Change Management
Return On Investment Integrated Monitoring and Evaluation Framework.
INDUSTRIAL & SYSTEMS ENGINEERING
Managing the Information Technology Resource Jerry N. Luftman
Copyright © 2007 Advantica Inc. (USA Only) and Advantica Ltd. (Outside USA). All rights reserved by the respective owner. Benefits of an Integrated Compliance.
Database System Development Lifecycle Transparencies
1 Subsea Reliability and Integrity Management Reliability and Integrity Management – Have very similar intent - almost the same definition – Treated separately.
Introduction to Computer Technology
Privileged and Confidential Strategic Approach to Asset Management Presented to October Urban Water Council Regional Seminar.
Release & Deployment ITIL Version 3
What is Business Analysis Planning & Monitoring?
Introduction to Information System Development.
Enterprise Asset Management
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
Oncor Electric Delivery Oncor Electric Delivery Restructure An Engineering & Construction Perspective SWEDE Conference May 11, 2007 San Antonio Mark Burt.
Senior Stakeholder Forum Wednesday 19 th June 2013.
Chapter 9 Database Planning, Design, and Administration Sungchul Hong.
Database System Development Lifecycle © Pearson Education Limited 1995, 2005.
Overview of the Database Development Process
University of Palestine software engineering department Testing of Software Systems Fundamentals of testing instructor: Tasneem Darwish.
OSF/ISD Project Portfolio Management Framework January 17, 2011.
ITEC224 Database Programming
IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN.
- 1 - Roadmap to Re-aligning the Customer Master with Oracle's TCA Northern California OAUG March 7, 2005.
1 Chapter 9 Database Design. 2 2 In this chapter, you will learn: That successful database design must reflect the information system of which the database.
Assignment 2 Project: Sea Urchin Sporting Goods Team Members: Gwn Hannay, Debbie Carlton, Susan Dalgleish Daniel Barnes, David Cooper.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
Switch off your Mobiles Phones or Change Profile to Silent Mode.
W. e. t INTERSERVE PRESENTATION 22/01/2015 Company Overview.
Database System Development Lifecycle 1.  Main components of the Infn System  What is Database System Development Life Cycle (DSDLC)  Phases of the.
Project Life Cycle.
BSBPMG501A Manage Project Integrative Processes 4.4 Monitor and Control Project Work The process of tracking, reviewing and regulating the progress made.
Project Management Processes for a Project
UK Link Programme Update to PNUNC June 17 th 2013.
1 Excellence in Product Development. 10 th July BIFM Application.
WEC MADRID 18 TH MARCH 2004 ASTRAZENECA’S APPROACH TO SUPPLIER RISK MANAGEMENT.
Safety Management System Implementation Michael Niels Thorsen Moscow 15 September 2005.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
Lesson 1: Examining Professional Project Management Topic 1A: Identify Project Management Processes.
Communications Management
Project Management Basics
The Implementation of BPR Pertemuan 9 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
Objectives Understand Corrective, Perfective and Preventive maintenance Discuss the general concepts of software configuration management.
Managing programs that promote personal effectiveness.
BSBPMG508A Manage Project Risk 11.6 Monitor and Control Risks Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control The process.
Project Management Processes for a Project
Most Airlines Are Not Operating at Previous 737NG Maintenance Planning Data (MPD) Document
ITS Device Standards & Procurement Project PURPOSE  Develop a series of Standards & Strategies designed to guide and provide consistency across the development.
Introduction to SPA Trade Services PDA Work Flow Management Systems The Era of Change.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
Agenda  Purpose  Processes  Deliverables  Executing Activities 4.3.
ITIL: Service Transition
DBA 5/20/2018 Like a policeman or teacher
Establishing and Managing a Schedule Baseline
CS4311 Spring 2011 Process Improvement Dr
UK Link Programme Update to PNUNC August 13th, 2013
Alignment of COBIT to Botswana IT Audit Methodology
HSF Contents and Future Links to the ADMM
Safety Management System Implementation
Fertilizer Industry Safety Information Analysis and Sharing Program
Operational Excellence
Asset condition and priority in Maximo
Presentation transcript:

RBM and Asset Strategy

Risk Based Maintenance Process – The Vision Define Asset Scope Plan Collect Asset Data Feedback to Model Work Process Update Perform Apply Restrictions Maintenance Strategies Evaluate Risk Analysis The Romec vision from a technology footing is to deliver a value added technology service that will proactively measure and adjust maintenance visits to reflect the correct needs to guarantee longest life on assets, continuous and reliable performance of critical assets and future planning assistance in terms of capital investment needs for the coming years (Note: each area is explained on the following slides) Risk Distribution 1 10 5 2 72 81 74 18 3 71 77 12 4 76 17 88 35 36 65 8 E D C B A Schedule Plan of Work

Enterprise Day 1 – 10 Sites with Roll out Plan for remaining sites Define Asset Scope A full account of the assets that are to be maintained per site. Define Asset Scope Enterprise Day 1 – 10 Sites with Roll out Plan for remaining sites

Enterprise Day 1 – BBW Data Collection Sheet aligned to SFG20 Comprehensive data on each asset to be captured Condition Age Maintainability Failure Rate Business Criticality New, replaced and removed assets Data Collect Enterprise Day 1 – BBW Data Collection Sheet aligned to SFG20

Perform Risk Assessment Using the collected data calculate the risk score for each asset Enterprise Day 1 – BBW i-AM

i-AM with additional (non-SFG20) Romec Maintenance Plans Schedule Plan of Work Once the assessment has been completed a schedule plan detailing the assets and the period between maintenance visits will be produced. Schedule Plan of Work Enterprise Day 1 – BBW i-AM with additional (non-SFG20) Romec Maintenance Plans

The Work Process Work Process The schedule of visits is carried out as deemed by the Plan of Work. Information is gathered during this process (e.g. Correction of the visit plan, additional visit required through asset degradation) Work Process Enterprise Day 1 – Visit data captured and stored (reporting mechanism to be defined)

Current Functionality Areas Contract Set Up Function Define Asset Scope Collect Asset Data Preventative Maintenance Planning Functions Plan Maintenance Jobs Dispatch Jobs Capture Visit Data Asset Maintenance Functions Receive Jobs Perform Maintenance Activity Update Visit History Field Service Functions

RBM – Functionality Areas Define Asset Scope Contract Set Up Function Updates Export Collect Asset Data Perform Risk Assessment Produce Plan of Work Analyse Visit Data Risk Based Maintenance Functions Export Export Plan Maintenance Jobs Dispatch Jobs Capture Visit Data Asset Maintenance Functions Receive Jobs Perform Maintenance Activity Update Visit History Field Service Functions

RBM – Functionality to System Mapping Not Day 1 System 21 Contract Set Up Function Updates Export System 21 RBM Profiler RBM Profiler RBM Profiler Risk Based Maintenance Functions Export Export System 21 System 21 ORS System 21 Asset Maintenance Functions Mobile Mobile Mobile Field Service Functions

Long Term – Fully Integrated Solution Feed to Asset Life-cycle Maintenance Adjustment to Maintenance Schedule Condition Based Monitoring The Long Term vision provides a fully integrated solution that proactively measures and adjusts maintenance visits to reflect the correct needs to guarantee longest life on assets, continuous and reliable performance of critical assets and future planning assistance in terms of capital investment needs for the coming years

RBM Enterprise Day 1 – Progress So Far Assets have been extracted and cleansed Requirements Definition has been completed Asset structure has been modified to enter the Profiling tool Profiling tool modified for Romec use ‘Proof of Concept’ (POC) sites set up to prove out the process 8 further test sites chosen to gain field exposure and harden the concept stage Activity List for site surveys, asset identification / collection, site desktop work, completed and tested for practicality – site visits started 7/2/2011 High level roll-out process, now needs populating for an implementation plan EVP process has now been integrated into the Activity List Tagging has been defined Asset mapping from Asset database to Profiler has been defined Overall process has been designed and mapped to the proposed working solution – this is shown in detail on the next slide;

RBM Enterprise Day 1 – Next Steps Roll out plan to be constructed Training and Communications strategy and plan to be completed Discuss bringing Profiling tool into Romec ownership ‘Proof of Concept’ (POC) sites – finalise and document for lessons learned and reflect amendments to process Complete 8 further test sites Expand ops involvement as ‘reality check’. Document all necessary new / changed procedures Run current OMPs, Site Visit reports and other performance reporting for base lining purposes and future performance comparisons. Integrate with the Supply Chain Management deliverables Physically audit and tag all sites

BBW’s i-AM Approach

Risk Based Maintenance

Site Survey – Asset Data Collection Form Each site will be visited for an asset collection and verification exercise to be completed. At this time the assets will be assessed based on age, condition, business criticality and maintainability. Additional assets (not currently on System 21) will be recorded along with any deletions and amendments

Asset Tags – Risk identification This is a draft sample of the asset tag including a coloured portion to indicate the calculated risk. A desktop exercise will allow an initial view of the risk assessment prior to the site visit being made. Once on site the FSM/Technician will verify the classification and apply the tag. If the risk assessment is unknown for any reason the coloured part of the tag made be applied/changed at a later stage without a need to remove the actual barcode.