 To help you understand and describe a range of methods for installing a new computer-based system; › Parallel › Phased › Direct › Pilot  Also, to help.

Slides:



Advertisements
Similar presentations
Network Services Seminar Vista Is Incomplete Microsoft is planning its first service pack Microsoft is seeking input from users Vista probably.
Advertisements

Networks By the end of this session, you will:
Data Conversion Khoo Kay Vin.
P3, M2,M3,M4.
Changeover Lecture 12 Change-Over Strategies for Implementation 1 BTEC HNC Systems Support Castle College 2007/8.
System Implementation
SYSTEMS IMPLEMENTATION. Planning/Control Site Preparation New Equipment Education and Training Changeover.
SYSTEM ANALYSIS AND DESIGN
4 types of implementing information systems
Software Development, Programming, Testing & Implementation.
SDLC: Development Phase
Systems Life Cycle A summary of what needs to be done.
System Development Life Cycle
Command School On Task In Touch Online Software for Schools Developed by Schools.
Chapter 8: Systems analysis and design
DISCUSS ANY FOUR APPROACHES TO SYSTEM CHANGEOVER
14.1 – Policy and Strategy Issues
System Analysis (Part 2) The System Development Life Cycle Problem Selection and Feasibility Study.
Cloud Computing Characteristics A service provided by large internet-based specialised data centres that offers storage, processing and computer resources.
Advantages and Disadvantages
Installing SIGNZ on a stand- alone machine. These slides will guide you through the installation of the SIGNZ ‘server’ and ‘client’ components on one machine.
Collecting Data Types, coding, accuracy, file formats and the effect of data loss.
Chapter 3 Software. Learning Objectives Upon successful completion of this chapter, you will be able to: Define the term software Describe the two primary.
Systems Life Cycle A2 Module Heathcote Ch.38.
Test and Review chapter State the differences between archive and back-up data. Answer: Archive data is a copy of data which is no longer in regular.
Systems Analysis and Design in a Changing World, Fourth Edition
System Conversion System Conversion is the process of changing from the old system to the new one. There are four methods of handling a systems conversion:
Verification & Validation F451 AS Computing. Why check data? It’s useless if inaccurate. Also, wrong data: Can be annoying Can cost a fortune Can be dangerous.
P3 - prepare a computer for installation/upgrade By Ridjauhn Ryan.
Methods of Installing a new computer-based system.
Module 4: Systems Development Chapter 14: Design And Implementation.
The steps involved in developing an Information System are: Analysis Feasibility Study System Design Testing Implementation Documentation.
Mr C Johnston ICT Teacher
GCSE ICT Systems Analysis. Systems analysis Systems analysis is the application of analytical processes to the planning, design and implementation of.
Systems Development The Kingsway School. Systems Development This is carried out when a company is having a problem. They usually employ an ICT Consultant.
A BRIEF LOOK AT THE COMPONENTS THAT MAKE UP THE SYSTEM LIFE CYCLE.
Chapter 10 Information Systems Development. Learning Objectives Upon successful completion of this chapter, you will be able to: Explain the overall process.
Thepul Ginige Lecture-7 Implementation of Information System Thepul Ginige.
Verification & Validation
Activity 1 5 minutes to discuss and feedback on the following:
A brief look at the components that make up the system life cycle.
1 The System life cycle 16 The system life cycle is a series of stages that are worked through during the development of a new information system. A lot.
Prepared by: Arjaa Salem Makkawi ID: Sec : 2.
Thepul Ginige Lecture-5 Implementation of Information System Part - I Thepul Ginige.
Starter To complement our notes and learning from last lesson (Topic 10 Introducing Large ICT Systems: Features of Large ICT Systems), fold your piece.
The information systems lifecycle Far more boring than you ever dreamed possible!
ICT IGCSE Theory – Revision Presentation The Systems Life Cycle Chapter 7: The Systems Life Cycle Analysis 7.2 Design 7.3 Development.
USING COMMAND WORDS How to answer SQA exam questions!
Unit F451 Computer Fundamentals Components of a Computer System Software Data: Its representation, structure and management in information.
Sir Thomas Boughey High School A/S Level ICT
Mr L Challenor ICT Teacher
System Conversion.
Project planning The systems life cycle.
Planning & System installation
Systems Life Cycle: Implementation
Developing Information Systems
BUSINESS SYSTEM OPTION (Bso)AND TECHNICAL SYSTEM OPTION(TSO)
User Focus IB Computer Science.
Systems Life Cycle: Implementation
Systems Design, Implementation, and Operation
Lecture-5 Implementation of Information System Part - I Thepul Ginige
SYSTEMS ANALYSIS & DESIGN
The Systems Life Cycle: Implementation
Chapter 22, Part
3.3.5: Implementing computer-based information systems
LO3 – Understand Business IT Systems
Management Information Systems
Systems Development Lifecycle
Networks By the end of this session, you will:
Chapter 3 Software.
Presentation transcript:

 To help you understand and describe a range of methods for installing a new computer-based system; › Parallel › Phased › Direct › Pilot  Also, to help you to discuss the choice of a particular installation method or methods for a range of applications.

 Organisations are always looking at updating their technology and systems.  The question is this… › What is the BEST method of making the transition from the old system to the new one?

 The following methods need to be considered when changing a system. › Parallel implementation › Pilot running › Direct change over › Phased implementation

 New system run along the old system.  They both run along side each other.  Advantages: › Allows the new system to prove itself before the old one is taken offline. › Data generated by the new system can be compared to the old system. › Staff can also be trained on the new system which gives time for their confidence levels to increase.

 Disadvantages: › Running the system in parallel means twice as much work for everyone in the short term.  Every time data is entered into one system the same process must be entered into the other system too. › Can be costly as you require personal to do double the work.

 Similar to parallel implementation.  Again, both systems are run in parallel.  With pilot systems only a portion of the new system is run along side the new system.

 Advantages: › Less of a drain on resources  System  Personal › Cheaper to implement than Parallel  Disadvantages: › Only parts of the system can be compared as not all the data is input into the new system. › Problems could arise when fully changing over as not all of the system will have been tested.

 The old system is stopped and the new system is started.  This usually happens when the system is not being used.  Can happen at the weekend or over night.

 Advantages: › Cost effective method of implementation as it has the least strain on resources (assuming all goes well)  Disadvantages › Staff training needs to happen well in advance so they are fully prepared for the changeover. › If something goes wrong with the new system there is no fallback.

 Parts of the old system are replaced by the new system.  The old system is used as required.  Parts of the new system are used for training purposes until the next part is ready for implementation.

 Advantages: › If a company has many buildings, the new system can be installed in one of them.  Can run the system in a ‘safe’ environment and on a trial period.  One of the buildings can be used for training purposes which will allow users to become familiar with the system.  Once the system has proven itself in one branch it can be transferred to all the other branches.  Disadvantages: › Takes a long time to fully implement as it has a lot of stages.

 A supermarket chain has recently had a system upgrade commissioned. The software is ready for use but has not yet been tested. The chain has many branches across the country.  What is the best method for the system to be implemented. Explain what your method involves and why you think it is the best method.

 A small software company has recently upgraded their system. It was designed and tested in house and they know the system works.  What is the best method for the system to be implemented. Explain what your method involves and why you think it is the best method.

 A large company houses lots of networks over different sites. The company use different types of computer for different jobs e.g. they use Apple Mac for designing graphical products and PCs for admin and office work. They want to upgrade some of their systems but are worried about software and hardware incompatibilities.  What is the best method for the system to be implemented. Explain what your method involves and why you think it is the best method.

 A school wants to upgrade its current computing facilities. It has four dedicated computer rooms and one mobile facility. They are on a limited budget but do need to upgrade their computers. Some rooms were updated more recently than others.  What is the best method for the system to be implemented. Explain what your method involves and why you think it is the best method.