National Hydrology Project Central Ground Water Board WB Mission: 1-15 September 2015 14.09.15.

Slides:



Advertisements
Similar presentations
From Policy to Practice: Recommendations of the White Paper Ralf Hanatschek, International Bureau of the BMBF Ljubljana, June 13, 2008.
Advertisements

JOINT ACTIONS SOCRATES, LEONARDO DA VINCI AND YOUTH PROGRAMMES LABORIENT Guidance and Lifelong Learning Collaboration Network.
1 Measuring ICT4D: ITUs Focus on Household and Individual Market, Economics & Finance Unit Telecommunication Development Bureau.
United Nations Environment Programme (UNEP) Secretariat of the Basel Convention (SBC) Enhancing cooperation between the Basel Convention and the Stockholm.
The International Trade Centre (UNCTAD/WTO) The International Trade Centre (UNCTAD/WTO)
CENTRAL WATER COMMISSION. Hydrology Project Phase-I  To establish a functional hydrological information system.  To improve institutional capacity 
Linking BRICS innovation potential through Innovation Networking Platform Sergey Korotkov Director, UNIDO CIIC Russia.
1 NIC / NICSIGePNIC - MMP Overview & Status of eProcurement implementation under Mission Mode Project As on
EU Wetland conservation policy. Communication on the Wise Use and Conservation of Wetlands (1995) => first European document dedicated exclusively.
Global Terrestrial Networks : The Hydrological Network.
EGEMS A Dedicated Web Based System for Ground Water Data Processing Analysis and Storage.
STRENGTHENING the AFRICA ENVIRONMENT INFORMATION NETWORK An AMCEN initiative A framework to support development planning processes and increase access.
A Watershed Management Project Supported by the World Bank (2014 – 2020)
CEOS WGISS Preliminary Workshop on Data Access and Integration: Global and Regional SDI and Client Perspectives 8-9 May 2000, Canberra ESCAP Regional Space.
1 INFRA : INFRA : Scientific Information Repository supporting FP7 “The views expressed in this presentation are those of the author.
Establishment of the Environmental Quality Standard for Water and Strengthening of Regional and District Environmental Offices for Implementation of Water.
Regional Developments for Improving Statistics in the Pacific Islands Presentation by the Pacific Islands Forum Secretariat, Luxembourg, 6 May 2008.
GLOBAL ASSESSMENT OF STATISTICAL SYSTEM OF KAZAKHSTAN ZHASLAN OMAROV DEPUTY CHAIRMAN, STATISTICS AGENCY OF REPUBLIC OF KAZAKHSTAN. 4.3.
Financial Management Practices in Hydrology Project - I An Overview Central Ground Water Board.
Day 1 Shelter Meeting 09a is hosted by Swiss Solidarity 08:30 – 09:00 09:00 – 09:15 09:15 – 09:30 09:30 – 10:30 10:30 – 10:50 10:50 – 11:00 11:00 – 11:30.
NATIONAL INSTITUTE OF HYDROLOGY ROORKEE Sept. 14, 2015 NEW DELHI.
Preparation of a Strategic Pilot Program for Climate Resilience (PPCR) Project - Phase I (November January 2013) Climate Investment Funds (CIF) Grant.
African Centre for Statistics United Nations Economic Commission for Africa Addressing Data Discrepancies in MDG Monitoring: The Role of UN Regional Commissions.
1 LIFE+ COUNCIL WORKING GROUP 4 OCTOBER Discussion Points 1. LIFE+ in Context: Environment funding under the Financial Perspectives.
Celine DONDEYNAZ, Joint Research Centre- Italy A. Leone, C. Carmona, P. Mainardi, M.Giacomassi and Prof. Daoyi Chen A Web knowledge Management Platform.
Regional Seminar on Developing a Program for the Implementation of the 2008 SNA and Supporting Statistics İlknur YÜCE September 2013 Ankara - Turkey.
HYDROLOGY PROJECT I HYDROLOGY PROJECT II HYDROLOGY PROJECT Project Period 1996 to 2004 Total Outlay 12.5 Crores Project Period 2006 June to May 2014 Total.
Central Water and Power Research Station Pune
Eurostat/UNSD Conference on International Outreach and Coordination in National Accounts for Sustainable Development and Growth 6-8 May, Luxembourg These.
African Centre for Statistics United Nations Economic Commission for Africa Data compilation and management proposal for Africa Statistical Commission.
National Hydrology Project The Way Forward Dr. Amit Prasad 15 th September, 2015, New Delhi.
Technology Needs Assessments under GEF Enabling Activities “Top Ups” UNFCCC/UNDP Expert Meeting on Methodologies for Technology Needs Assessments
EU Project: Trans-Boundary River Management Phase II and Phase III for the Kura River basin – Armenia, Georgia, Azerbaijan ( Transboundary.
1 Stockholm Convention on Persistent Organic Pollutants Clearing-house Mechanism for Information on POPs. Role of Regional Centres.
Waisea Vosa Climate Change Unit Division of Political and Treaties Ministry of Foreign Affairs and International Cooperation.
International Network Of Basin Organizations topic 3.1: “Basin Management and Transboundary Cooperation”. Operational tools  Long term basin management.
Strategic approach to national implementation programmes for SEEA by UNSD Sixth Meeting United Nations Committee of Experts on Environmental Economic Accounting.
National Hydrology Project Framework for Monitoring and Evaluation (M&E)
National Hydrology Project Orientation Workshop 9 th May, 2016, New Delhi.
Job offer IT System & Software Specialist We are currently looking for an IT database administrator in order to respond to one key-account customer demand.
Project Launch Workshop: New Delhi May 9-10, 2013 State: Madhya Pradesh ICDS Systems Strengthening and Nutrition Improvement Project.
OPENGIS for Water Management OPENGIS for Water Management in Developing Countries JRC Activities on Water Knowledge Management In Developing Countries.
National Hydrology Project Dr
National Information Technology Center : An Introduction 1.
GOVERNMENT OF TELANGANA Irrigation & CAD Department
National Hydrology Project
Monthly Progress Report
8 - 9 MAY, 2014, PRETORIA, SOUTH AFRICA
National Hydrology Project
Geo-spatial Products, Services and Applications
NATIONAL HYDROLOGY PROJECT
GISELA & CHAIN Workshop Digital Cultural Heritage Network
The Integrated Food Security Phase Classification in Sudan –Next Steps
Ministry of Water Resources, River Development and Ganga Rejuvenation
National Hydrology Project
Central Ground Water Board
The International Plant Protection Convention
GROUNDWATER DEPARTMENT - KERALA
National Hydrology Project
Details of SPMU (in position), Staff Strength etc
Omurbek Ibraev Project coordinator December 2014
Implementation of the Sustainable Development Goals (SDG) in the Republic of Uzbekistan Geneva, April 12, 2017.
SEPA AND EEA, FIVE YEARS OF COOPERATION
Supporting Data for a KfW Financed Investment Project on the Montenegrin Coast 18 May 2017, Wien ●
GISELA & CHAIN Workshop Digital Cultural Heritage Network
Mr. Alper GÜCÜMENGİL Head of Projects Group, TURKSTAT
Technical and Advisory Meeting
ICDS Systems Strengthening and Nutrition Improvement Project
Draft revision of ISPM 6: National surveillance systems ( )
National level Objective:
Presentation transcript:

National Hydrology Project Central Ground Water Board WB Mission: 1-15 September

HP I Hydrology Project I: 9 Peninsular States Objectives Strengthening of Ground Water monitoring network Standardization of methodologies for data collection & validation Infrastructure development: labs & building Institutional strengthening including capacity building and Software development for data processing, storage and dissemination Achievements 2239 observation wells have been constructed Computer data centre has been set up and water quality laboratories had been upgraded. Dedicated ground water processing and application software, named as Groundwater Estimation and Management System (GEMS) has been developed for Ground Water Data Processing

HP II Hydrology Project II: 13 States Objectives Institutional Strengthening Horizontal Expansion in four new States covering Goa, Himachal Pradesh, Punjab & Pondicherry Vertical Extension in the 9HP-I peninsular States. Achievements Institutional Strengthening 19 Server & 59 Workstation have been procured for up-gradation of data centre Awareness raising programs – 32 Nos Domain specific training - 27 Officers of CGWB deputed for 8 International Training courses Development of e-GEMS, web based solution for Ground water data processing software (GEMS) and is to be hosted Horizontal Expansion: PZ constructed in new States(Goa -49; Punjab -65) Vertical expansion: Groundwater Modeling software PDS Pilot Project on Aquifer Mapping Planning & designing of AR structures in sub urban of Chennai

eGEMS- Outlines  Internet based & platform independent system  Client access from web browsers  No software requirement at user end – Web browser and internet access needed  Single, centralized data store for databases.  Scalable to user requirement  13 participating States & CGWB to host data in a centralized repository.  Data Access  Currently data access is only for State/CGWB authorised persons only  CGWB Data can be accessed by all participating agencies  Data of concerned State to be viewed & changed only by the concerned State.

Role & Responsibilities Standardization of structure for data storage by the State agencies Optimization of network for monitoring of water levels & water quality Knowledge Sharing through trainings, meetings & sharing of reports & findings Technical assistance to State Agencies on any specific requests

Groundwater Issues for consideration in NHP Requirement of Uniform Data structure for storage & retrieval For easy data sharing. Concurrence of State agencies required for storage & sharing 13 participating agencies have agreed to host data but the ownership rests with State agencies only Constraints – Different Data pricing policy of different State governments. More than one department monitoring groundwater for levels and quality as per their mandates in each State Need for a nodal department for consolidation for each State Act as pivotal point for data migration and sharing.

Project Objectives Real-time Water quality monitoring in the coastal aquifer system in Tamil Nadu & Puducherry as pilot study before taking up on a large scale up-gradation of eGEMS : Creation of Standardized scientific database for groundwater, for the whole country on a single platform Capacity building: Through international exposure & transfer of knowledge through domain specific training to State Govt. officers Basin Management Plan: Preparation of basin management plan for 10 basin along with CWC through consultancy

Project Success Indicators Establishment of real time water quality monitoring system in parts of Tamil Nadu & Puducherry Coast Availability of standardized scientific database for whole the country on the same format & platform. Number of Trained officers in the Board & in States Basin Management Plan for 10 basins

Proposed Financial Outlay Total outlay : Rs Cr

Component A: Hydromet Informatic System Real time Monitoring (60 Nos) Construction of PZ Installation of real-time monitoring systems Construction of PzRs 435 Lakh DWLR (Telemetry) with WQ probe as services Rs 255 Lakh TotalRs 690Lakh

Component A: Hydromet Informatic System Establishment of Centre of excellence at Faridabad (Rs 956 Lakh) Centre would provide facility for modeling for CGWB offices & for State Agencies on request Financial implications Goods HW : 26 Lakh SW :99 Lakh AMC:63 Lakh Centre Establishment : 10 Lakh Consultancy :288 Lakh Hiring of consultant Level Rs 6 Lakh/month for 48 months Operation Cost:470 Lakh Hiring of Consultant Level Rs0.5 Lakh/month for 84 months

Component B: up-gradation of eGEMS Total outlay : Rs 2300 Lakh Scope of work Design, Development and Implementation of Additional Modules of e-GEMS Integration of data of all States Training for users of all States Benefits/Outcome States to get a standardized database No financial implication for the States Easy storage, retrieval & analysis CGWB database available for planning

Component C: PDS Study in sub-basin above Ramganga confluence of Ganga Basin Total Outlays: Rs 2400 Lakh Scope of work Drilling of wells down to 300 m bgl Water quality sampling & analysis Isotope dating Surface water –groundwater interaction Aquifer response modeling Pilot study at select locations for aquifer remediation Outcome: Demarcation of contaminated zones within aquifer Aquifer-stream relationship Feasibility of aquifer remediation

Component C: Consultancy for Basin Management Studies in 10 basins along with CWC Financial Outlay : 11.0 Cr 10 basins identified by CWC First 3 years of the project 1. Bharatpuzha, Kerala 2.Son 3. Chambal 4. Tapi 5. Theesta From 4 year onwards 6.Subarnarekha 7. Damodar 8. Pennar 9. U.Godavari 10. U.Mahanadi up to Hirakud

Component D: Capacity building S.NoActivity Total in Lakh No of Beneficiaries /per training 1 International Training Domain specific training Awareness Programme Training on collaboration with USGS295 As per MoU to be signed Total951

NHP : CGWB support to the States Real-time Water Quality monitoring: pilot study to show case the outcome Pave way for lateral expansion into other parts of the country Could be jointly taken up by CGWB & State Groundwater Departments for strengthening the water quality monitoring on priority basis. eGEMS would provide a common platform for all State groundwater departments To host the data on a common platform, For easy storage, retrieval and analysis of data No cost on the participating agencies. Transfer of knowledge and technology Results of the studies are being shared with State agencies Results of the studies to be carried out in NHP would be shared with all concerned Domain specific trainings & awareness campaign Knowledge & technology transfer to all participating agencies and other Stake holders through interactions Documents to be shared at appropriate platform for knowledge dissemination. Regional Directors of the Regions would offer technical guidance As and when sought by the State Groundwater Departments

NHP : What CGWB needs from States States may place their request on what is expected from CGWB On request from the States, respective Regional Directors would extend all cooperation in meeting the demand

Thanks