API S64, 3 rd Edition. 18 Dec 2013 Update. API S64 Chair – Tony Hogg Co-Chair – Open Current Edition – 2nd Edition, November 2001 Listing of Meetings.

Slides:



Advertisements
Similar presentations
GEAR project Process Evaluation. Overview of GEAR Evaluation Components Outcomes Multi-component internal evaluation External evaluator: Prof. Carol Hagemann-White,
Advertisements

Status Update on Future Water Quality Strategies for the Refuge Kenneth G. Ammon, P.E., Deputy Executive Director, Everglades Restoration and Capital Projects.
Don Wells Hess Corporation
Line Efficiency     Percentage Month Today’s Date
Unit Number Oct 2011 Nov 2011 Dec 2011 Jan 2012 Feb 2012 Mar 2012 Apr 2012 May 2012 Jun 2012 Jul 2012 Aug 2012 Sep (3/4 Unit) 7 8 Units.
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
Cover graphic should fill and not exceed the defined grey box. June 14 th, 2012 Gary Devlin API SC 18 – Quality Product Life Cycle TG7.
Social Inclusion by Proactive Design InclusiveByDesign Second project meeting June 2001 Florence, Italy.
Market Analysis & Forecasting Trends Businesses attempt to predict the future – need to plan ahead Why?
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration USDOT – PHMSA HMEP Grants Major Audit Findings NASTTPO April 25,
Kent Grebing, API SC 16 Chair
FACTORS INFLUENCING CLIMATE NOVEMBER 18, MAIN FACTORS THAT INFLUENCE CLIMATE Latitude Mountain and Elevation Water bodies Moving air Ocean Currents.
Date processing and conversion Please use speaker notes for additional information!
2015 Pipeline Safety Trust Conference November 20 th, 2015 | New Orleans, LA API RP 1175 Pipeline Leak Detection Program Management – New RP Highlights.
1 Approved Terms of Reference for HAPUA Working Group No.5-ESI Services Project 6 Bilateral Contract Benchmarking.
Doc.: IEEE /1394r0 Submission November 2008 Jose Puthenkulam (Intel)Slide 1 Summary of m Development Process Date: Authors:
SMIng 55th IETF Chair: David Durham. Agenda Agenda bashing; All; 5 mins. Status update; Chair; 15 mins. Charter & milestone revision discussion; Chair;
LBT Q Engineering Review PMCD. 21-DEC-2007LBT Q Engineering Review Highlights (Q4/2007) Draft of System Overview and O&M manual complete except.
API 19 CI Chemical Injection Devices for Downhole Applications
API 19 CI Chemical Injection Devices for Downhole Applications
WIGOS regulatory and guidance material
Jan 2016 Solar Lunar Data.
Task Group API 19SS Sand Screens
IT Strategy Roadmap Template
DSC Assurance Team Reporting
Task Group Status January ,11, 2017
Status of the Planning Working Group’s (PWG) Efforts
SRI LANKA FREIGHT FORWARDERS ASSOCIATION
API 14L Specification for Lock Mandrels and Landing Nipples
Task Group API 19SS Sand Screens
Q1 Jan Feb Mar ENTER TEXT HERE Notes
Average Monthly Temperature and Rainfall
<Location> – <Project Name>, Sponsor: <name>
API S64 Summer Conference Update.
Specification on float equipment
2017 Jan Sun Mon Tue Wed Thu Fri Sat
First 8 slides are what was presented in San Fransisco…

Sentinel-2 Status Update
This Presentation Pack is brought to you by
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
API SC-16 task group for Specification 16D
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Development of a specification

Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16
Jan Sun Mon Tue Wed Thu Fri Sat
Coordinate Operations Standard
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec ITEM 1 ITEM 2 ITEM 3
Prof. dr. Giedrius Vanagas

Electricity Cost and Use – FY 2016 and FY 2017
HMC-4 Meeting 15th May 2018 London
Value-Based Payments.
on propulsion of OBD2 gtr
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3

Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Value-Based Payments.
ICAO AFIS MANUAL UPDATE
Presentation transcript:

API S64, 3 rd Edition. 18 Dec 2013 Update

API S64 Chair – Tony Hogg Co-Chair – Open Current Edition – 2nd Edition, November 2001 Listing of Meetings – 8 Nov 2012, 20 Dec 2012, 13 Mar 2013, 1 May 2013, 18 Jul 2013, 7 Aug 2013, 2 Oct 2013, 23 Oct 2013, 20 Nov 2013, 18 Dec 2013 Anticipated Ballot – 2014 Issues – None; we are making progress. Comments – Next scheduled meeting is 12 Feb 2014.

API S64 Scope This standard is intended to provide information on the design, installation, maintenance, testing, and operation of the diverter system and associated components. It will also provide a general overview of operating procedures. This document will change from a Recommended Practice to a Standard to both allow the inclusion of the design details and also to give more ‘weight’ to the maintenance, testing and operation requirements.

Diverter System Design This standard is intended to provide information on the design, installation, maintenance, testing, and operation of the diverter system and associated components. There has not been any prior guidance on the design of a diverter system from API. We are correcting this anomaly with the new edition of this document.

Diverter System Installation This standard is intended to provide information on the design, installation, maintenance, testing, and operation of the diverter system and associated components. Installation is also closely associated with design and selection as it will cover pipe sizes, routing, targets, bends, supports, etc.

Diverter System Maintenance This standard is intended to provide information on the design, installation, maintenance, testing, and operation of the diverter system and associated components. Maintenance shall be performed every 90 days, after each well, or in accordance with documented equipment owners reliability data, whichever is greater. A Product History File shall be kept for each major component.

Diverter System Testing This standard is intended to provide information on the design, selection, installation, maintenance, testing, and operation of the diverter system and associated components. Function testing will follow the frequencies prescribed by API S53. Pressure and flow testing are being discussed. This is not a pressure controlling system. – Do we need to pressure test? – What exactly would we test? – When would we test? Flow testing could cause pollution.

Diverter System Operation This standard is intended to provide information on the design, selection, installation, maintenance, testing, and operation of the diverter system and associated components. Suggested operating procedures will include planning and training topics.

Diverter Control System We have discussed the control system requirements with our API 16D colleagues to the point where API S64 will simply refer to API 16D 3 rd Edition for the control requirements.

Moving forward……. We are still focusing on floating rig use. We will review the completed document to see what, if anything, contradicts or conflicts from a land or jack-up perspective. The volume of such contradictions/conflicts will help us determine whether we need a second document. 10

Active Participants 11