Nguyễn Văn Tâm Bsc of Civil Engineering, 1997 (CTU, VN) Lecture notes: TU Delft, Holand Geotextile and Structural Experiment, 2000 Construction equipment.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

1.1Definition of Construction:. Is the process by which material, equipment, machinery are assembled into a permanent facility. Is the process by which.
Construction Contracting
Vergabeformen Building Procurement – Contract strategy Procurement Systems – an initial overview Proper choice of delivery system can help to reduce conflicts.
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Presented by: Fouad Al-Malazi ID No.: Managing Construction Contracts By Robert D. Gilbreath Chapter 1 CONSTRUCTION CONTRACTS: Roles and Relationships.
1 Eurostat Unit B1 – IT Systems for Statistical Production IT outsourcing in Eurostat – our experience Georges Pongas, Adam Wroński Meeting on the Management.
NEC - Engineering and Construction Contract (ECC)
4/28/20151 PRESENTED BY NAKABAGO JOHN CONTRACT MANAGEMENT AND ADMINISTRATION IPPU PRESENTATION JOHN NAKABAGO.
Chapter 14 Schedule Risk Management Dr. Ayham Jaaron Second Semester 2010/2011.
Presentation for Thesis of Master Degree Done by Ali Abdullah Al Salman CEM – 520 Term Project (Paper Presentation) Assessments of Risk Management Perception&
CTC-470 Construction Administration Project Management Concepts.
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
Quality Management Dr. S.W. Poon. Quality Management Introduction Meaning of quality Quality Control (QC) Quality Assurance (QA) Differences between QC.
Centers for IBM e-Business Innovation :: Chicago © 2005 IBM Corporation IBM Project October 2005.
KFUPM, Department of Construction Engineering and Management Summary of AN IMPLEMENTATION MODEL FOR DESIGN-BUILD (D-B) PROJECT DELIVERY SYSTEM BY : MOHAMMAD.
Construction Industry Development Board development through partnership Construction Procurement documents 2c.
XII- COST CONTROL, MONITORING & ACCOUNTING
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Construction Engineering 221 Cost Estimating and Bidding.
Planning & Delivery Systems Construction Engineering 380 Engineering Law.
ZHRC/HTI Financial Management Training Session 8: Annual Procurement Plans, Procurement Contracts, and Contract Management.
Syed M. Ahmed, Ph.D. Department of Construction Management Risk Management in Construction Syed M. Ahmed, Ph.D. Department of Construction Management Florida.
Report Tile Training & Management Assistance Branch UNITED STATES OFFICE OF PERSONNEL MANAGEMENT Project Kick-Off Meeting for with Project Manager Name,
> taking best practice to the world International Experience with Performance Based Maintenance Contracts.
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 3 Requirements of a realistic CPM schedule.
Construction Project Management
Private sector’s experience on public procurement practices in Rwanda Presented by: Eng. KAZAWADI Papias Managing Director, Star Construction Company Ltd.
Project risk and control. Tender risk Programme and method – Tightness of completion LAD’s Extent of change – Construction method Temporary works Change.
Introduction Time Quality Cost Project Constraints Success Introduction.
Chapter 8 Pricing Generally. Objectives Upon completion of this chapter, you will be able to: –Describe the general process of pricing a construction.
Technical Manager; Bechtel Oil, Gas & Chemicals.
Compensation events and claims Presented by Prof. Khem Dallakoti.
Joint Venture in construction company in West Bank.
Delay In Construction Project In West Bank. Outline:  Background.  Research objective & methods.  Important factors that cause time and cost overrun.
Purchasing Policy and Procedures Chapter 3. The Term “Policy”  Refers to set of purposes, principles, and rules of action that guide an organization.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
Specification & Quantities Estimating
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
King Fahd University of Petroleum & Minerals
Chapter 2 Introduction to Construction Procedures
Pre-Project Components
Chapter 13 Estimates for Remodeling Work
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
Project Management “Project Planning & Scheduling” Lecture 07 Resource Person: M. Adeel Anjum.
Report Performance Monitor & Control Risk Administer Procurement MONITORING & CONTROLLING PROCESS.
OVERHEAD COSTS IN BUILDING CONSTRUCTION IN SAUDI ARABIA Author: Mohammad Al-Shahri (1997) Presented By Fawaz Al-Ghamdi January 1, 2005.
Collaboration of Entitlement and Cost Efforts in Claims Analysis Rubino & McGeehin Consulting Group June 27, 2005.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
Presented by: Engr. Sikandar Bilal Khattak Department of Industrial Engineering University of Engineering and Technology, Peshawar Assessment of Construction.
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
Project Management – PTM712S
by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison
PRESENTATION OF FINDINGS GRANTEES NEED ASSESSMENT
Profession Practices (ECIV-5105)
Faculty of Postgraduate Studies and Scientific Research German University in Cairo Modeling to Reduce Variation Order in Construction Projects in Egypt.
((Organizing relationship between the Owner and Contractor involved in construction project at Palestine)) By: Maw`ed Abu Shamleh Malaak Hamaydi Supervisor:
Costs and Economics of Construction
Under supervision of: Eng. Reema Nassar
9/18/2018 Bids CONTRACTING Khamis…..
Risks, Strategies and Resources for Small Scale Producers
Risk Management Practice (Case study: Sydney Opera House)
An - Najah national university Civil engineering department
The What do I want? Lecture
Construction Contracts
C2 Follow the Capital Risks
CEM 515 Done by: Abdulkarim Sulais
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

Nguyễn Văn Tâm Bsc of Civil Engineering, 1997 (CTU, VN) Lecture notes: TU Delft, Holand Geotextile and Structural Experiment, 2000 Construction equipment & Method, 2004 MEng of Construction Engineering and Infrastructure Management 2009 (AIT, Thailand) Claims (Delay and Cost Overrun) in Building Project in Public Sector: Case Study in Mekong Area, Vietnam

Building projects in Mekong Delta, Vietnam Cantho Airport Cantho Bridge Introduction An Giang supper market (D) Aquiculture College, CTU (E) Medicine and Pharmacy University (F) Bac Lieu Committee Building (C) Can tho Sport Competition House (B) College of Technology, CTU (A) Six building projects of case study Private contractors Public contractors

Problem Statements Claim status of construction projects Construction Law of Vietnam and Tender Law are not precisely cover claims. Unclear claim management and settlement: all claims are approved by owner or investor Decree (Clause 32 of Decree 16/2005/NĐ-CP) Lack of claim knowledge: claim right (legal), Cooperate to mitigate claim and resolve claim events Role of human resource: management competency, cooperation climate to deal claim issues in project. Introduction

Research direction Objective 1 Identification Claim Causes Objective 2 Claim settlement: Analysis for additional cost Analysis for additional time Objective 3 Study Claim attitude of contractor and owner Scope of study Vietnam Mekong area Public sector Building Projects Literature review Experts interviewing Case study: Multiple - Case (Yin, 2003) Claim causes? How they are settled? How the claim attitude affect on project? Objectives

INPUT DATA COLLECTION, ANALYSIS OUTPUT Identification of Claims Causes, Settlement and Attitudes SCOPE - Public Sector - Large Projects - Overrun Cost, Delays STRATEGY - Literature: finding common claim sources - Project document: finding specific sources - Experts: Clarification, validity and finding new sources LITERATURE EXPERTS 3 Experts, experience > 15 years (Academic, Govern., Consultant) EXPERTS 3 Experts, experience > 15 years (Academic, Govern., Consultant) Document data collection: Contracts, diaries, meeting record and schedules List of Claims sources, Settlement and Attitude PROJECT SELECTION - 3 Projects of public contr. - 3 projects of private contr. Claim causes Relationships’ causes Claim causes Claim analysis Claim attitudes Ranking claim causes Claim attitudes Expert Discussion Interview 6 Participants Observation - 26 Claim causes - Relationships of claim causes - Claim analysis methods: Delay & Cost overrun - Claim attitudes - Claim climate assessment CONCLUSION - Claim causes - Claim management - Claim culture Methodology

Objective 1: Identification Claim Causes Objective 1 Identification Claim Causes  Causes of Delay Time  Causes of Cost Overruns  Causes of Delay and/or Cost overruns  Ranking Causes and Seeking relationship of claim causes

Compare between the initial and final duration Data Analysis Private Contractor ∑ Delay:46% Public Contractor ∑ Delay: 174% Delay time Analysis -Average total delay: 110% - Percentage of additional time on total delay: average: 41.57%

Data Analysis Low awarded bid prices: 4.98%. This is strongly affect on delay time due to more number of contractors than building project and unit price to be lower than market price about 10% It is root of shortage of equipment, shortage materials, choosing incompetent subcontractors and suppliers. Delay time and delay factors of Contractor Competence of Contractor is a serious problem: Main power, Equipment, and Finance.

Causes of delay of 6 cases (Based on document record, smaller than total delay time) Delay Causes Caused by Group Total delay time (days) Percent Design changes by mistakesDesigner % Mistakes during constructionContractor % Additional works by ownerOwner % Delay or DisruptionContractor % Defective works and reworksContractor % Low productivityContractor % Inspection of completed worksConsultant % Unforeseen site conditionsExternal652.08% Price fluctuationsExternal551.76% Data Analysis

Delay causes of Parties Contractors have mistakes: foundation tasks as producing and driving pile foundation. Designers have been small or middle businesses. Foundation structure must be changed due to lack survey soil properties. Owners have unclear scope, difficult financial and adding works. There are many people can give ideas to change architect and material. (3D model should be used for architect designs- show a clear view for owner) Roles of owners can motivate or force contractors, consultants and designers to improve all aspects in order to achieve effective and efficient building projects. But they cannot do as contract. Data Analysis

Cost estimate, initial contract value, claim paid and actual value. Percentage of decreasing bidding price (average: 4.98%) Percentage of claim paid (average: 21.55%) Data Analysis Cost Overrun Comparison between initial contract values and claims paid by the client.

Causes of cost overruns Causes of cost overrun of 6 cases (Based on document) Adding cost factorGroupsClaim Amount (VND)Percentage of Claims Design changes by mistakesDesigner9,437,909, % Price fluctuationsExternal7,408,428, % Additional works by ownerOwner6,926,039, % Unforeseen site conditionsExternal5,239,300, % Inaccurate estimatesDesigner2,420,273, % Causes of Cost overrun: Competence of Designer, small scale consultant firms Owner has many personnel who have high power to change Data Analysis

26 factors of Delay and/or Additional Cost Relationship Network (from expert interview and literature review) Design changes by mistakes Inaccurate estimates Owners’ site clearance difficulties Incompetent subcontractors Low awarded bid prices Financial difficulties of owner Lack of capable project managers Delay and/or Additional Cost Mistakes during construction Additional works/ reworks by owner Defective works and reworks Delay or Disruption Unforeseen site conditions Shortages of materials Financial difficulties of contractor Slow payment of completed works Price fluctuations Designers’ inadequate experience and capability Shortage of equipment Low productivity Inappropriate construction methods Bad weather Unclear contractual conditions Obstacles from government Inspection of completed works Shortages of skilled workers Lack of capable site supervisors Compensation from owner No Compensation from owner Data Analysis

Objective 1 Identification Claim Causes Objective 2 Claim settlement: Analysis for additional cost Analysis for additional time Objective 2: Claim Analysis  Extension of time analysis  Delay time due to owner  Delay time due to contractor  Method analysis: As-planned versus As-built, Global claim  Additional cost analysis  Direct cost  Indirect cost Data Analysis

Delay analysis issues In six building projects, there are not data actual resource usage and monthly update. Float ownership: “Who owns float?” Concurrent delay Logic change (Hard VS Soft logic) Resource allocation due to delay or logic changes Data Analysis

Additional cost analysis Direct cost: cost of additional works out side contract  Material, equipment and labor cost  Unit price is applied as unit price in contract or update due to price fluctuation  Quantity is noticed and submitted during construction stage and approved by the engineers of owner. Indirect cost: do not estimate through 6 cases  Overhead cost (site and office overhead cost)  Financial cost  However: they are not compensated by owner. Data Analysis

Bad Strategy of Contractor to deal with indirect cost  Construction law VS Tender law about definition of main contractor and subcontractor obligation. Thus: Change subcontractors which were not written in bidding document. Cannot manage delay, quality and cost.  Subcontractors are small and local contractors with old equipment, unskilled labors (farmers) and lack managers or engineers to decrease indirect cost when the project is delayed too long.  Just in time to delivery material and equipment. No warehouse cost. Site office Local labors Local equipment Data Analysis

Some issues of claim analysis are found through six building projects. Tools to monitor and control delay and cost overrun are not used:  CPM: use & update  Earn value concept  Assessment of cost control systems (Chotchai Charoenngam, 2001) Construction Law, Tender Law  Some clauses are contradiction together  Contract is not managed effectively.  Unclear claim procedure (specially, delay analysis method)  Contracts are not strong constraints. Owners cannot force contractor to use equipment and labors which have good quality as bidding document. Human resource  Lack project managers.  Cooperation is not used to allocate risk and mitigate claim: passive to deal claim events, extend time to approve claim procedures. Data Analysis

Thank you! 5/2010 Nguyen Van Tam