Copyright © 2005 POSC Integrated Operations Update David Archer, POSC Integrated Operations SIG Meeting Stavanger, Norway 18 November 2005.

Slides:



Advertisements
Similar presentations
SPE WITSML: Technology to Business (T2B) for the Oilfield J
Advertisements

Large Transmission Pipeline Operations: Optimization under Future Uncertainty Richard G. Carter and Henry H. Rachford, Advantica Todd Dupont, U. Chicago.
Completion Object Overview June 2013 WITSML/PRODML Standards.
Evolution 1. WITSML Life Cycle Timeline Years Version 1.0 Version 1.1 Version 1.2 Version
CNG Refuelling station. A company located in Cherasco (Italy), is among the world leaders in the field of designing and manufacturing of components and.
INTEGRATED PRODUCTION SERVICES Wellhead Management from Day 1 December 11, 2001.
Using the WITSML™ protocol for analysis in Drillworks – past case studies and current applications Drew Swanson May 11, 2006.
NOT AN OFFICIAL UNCTAD RECORD. 2 Defining the Reservoir Defining the Reservoir WesternGeco Reserve Definition ( SPE & WPC) “ Proved reserves are those.
Update on WITSML deployment in BP - Energistics Public Meeting Houston, 28 May 2009 Dr Julian Pickering Field of the Future Business Deployment.
Monitoring a Pipeline and Sharing Data with Key Customers How to do this when you own the pipeline but do not operate it!! Bert Stipelcovich IT Manager.
Supply Chain Management
Enabling Integration of Core Work Processes in Upstream Oil and Gas
Overview 1. 2 WITSML Special Interest Group Members A set of Data Exchange and Web Services Standards First published in 2001 Version 1.4 due in Q3 50+
RESQML™ for 3D/4D Reservoir Characterization
Update on POSC xField WITSML SIG Public Meeting 29 April 2004 Calgary David Archer
TIMKEN Bearing Diagnostics and Prognostics Using PI Reducing Unplanned Downtime Rich Browner - Program Manager Reliability Solutions The Timken Company,
Gas Transportation through Pipelines
The E&P Industry and the POSC Community David Archer President / CEO Regional SIG Seminar New Delhi, India 14 January 2005.
Best Cost-Effective Technology Independent and Neutral Company 24/7 Worldwide Technical Support MARCH 2011 TECHNICAL UPDATE The independent.
It’s About Time Sanjaya Sood May, Initials Key Industry Drivers The Emergence of Three Main Trends Introduction of new enabling technology, bringing.
© Copyright High Performance Concepts, Inc. 12 Criteria for Software Vendor Selection July 14, 2014 prepared by: Brian Savoie Vice President HIGH.
Integrated Information Platform for reservoir and subsea production systems The Integrated Information Platform (IIP) project IIP Chairman Svein Omdal,
Speaker Introduction John Shields Software Projects Manager, Baker Hughes, Aberdeen 30 years working for Baker Hughes 30 years working for Baker Hughes.
ASME/API GAS LIFT WORKSHOP DOWNHOLE GAS LIFT AND THE FACILITY John Martinez Production Associates ASME/API GAS LIFT WORKSHOP.
Schlumberger Update Nigel Deeks Real Time Technology Manager
Applied Transportation Analysis ITS Application SCATS.
<PRODML/> - Industry Standard
PRODML Review Energistics Western Europe London, 31 May 2011.
Energistics Technical Architecture Work Group Orientation Meeting.
Energistics Overview Alan Doniger, CTO November 18, 2008.
Technical Team WITSML SIG Paris 16 May Technical Team Representatives mainly from service companies Energistics (Gary) keep a global issue list.
Enhancing E&P Business Efficiencies: Upstream Standards. Bottom Line Results. Energistics Annual Member MeetingRandy Clark Houston, TexasPresident & CEO.
Outline Terminology –Typical Expert System –Typical Decision Support System –Techniques Taken From Management Science and Artificial Intelligence Overall.
Shell Global Solutions PRODML Business Overview Ron Cramer.
PRODML Overview – Energistics Seminar
Journey to a Real Time Enterprise
Integrated Information Platform for reservoir and subsea production systems Stavanger April 6th 2005.
SOA Management Packs & Governance Cheat Sheet (Shared under OPN NDA - Last Updated: 8/3/2009)OPN NDA Target Account Profile Enterprises that: Have IT infrastructure.
SPE Digital Energy Conference Session Rusty Foreman - BP.
Update on WITSML deployment in BP - Energistics Public Meeting Dubai, 19 November 2008 Dr Julian Pickering IT Programme Manager Drilling & Completions.
Houston Material Handling Society October 2008 Baghouse Cleaning Control Presented by: T.J. Winalski.
Flow Margin Assumptions for NTS Planning and Development Transmission Planning Code Workshop 3 5 th June 2008.
© Copyright 2005 POSC 2005 Standards Program Updates Alan Doniger, POSC November 2, th Annual Member Meeting & Conference.
Energistics Asia South Region Meeting: (Drilling) WITSML SIG Update New Delhi, IndiaAlan Doniger 14 January 2007Chief Technology Officer Le M▲ridien New.
Shell Exploration & Production Copyright: Shell Exploration & Production Ltd. 6/5/2016 File Title Shell taking the next step with WITSML May 2008 Update.
Life cycle services for automation products
WITSML Public Seminar and Vendor Exhibition: Welcome Alan Doniger, Energistics CTO May 28, 2009.
© Copyright 2006 POSC Overview and Introduction March 22-23, 2006 Regional SIG Meetings Houston, Texas.
1 Production SIG and PRODML™ Work Group Meetings Alan Doniger Chief Technology Officer POSC Aberdeen, Scotland 20 September 2006.
1 WITSML™ SIG Meetings and Public Seminar & Exhibition Alan Doniger Chief Technology Officer POSC Aberdeen, Scotland 19 September 2006.
© Copyright 2006 POSC WITSML™ Public Seminar and Exhibition Houston, Texas May 11, 2006.
Integrated Operations SIG Introduction and Overview David Archer Alan Doniger POSC POSC Regional SIG Seminar New Delhi 14 January 2005.
WITSML SIG Area of Interest –the definition, movement, and storage of drilling data, information, and knowledge, especially the “right time” seamless flow.
1 Chapter 9 Mixed-Integer Programming. 2 Chapter 9 Enumeration approach for 20 objects (0,1): 2 20 possibilities, evaluate each case for satisfying constraint.
 Business Empowerment Bert van den Berg 11 March 2000 / Monterey.
PRODML SIG Team and General SIG Meetings October 13-14, 2009 Schlumberger SIS Offices, Houston.
1 Future Consideration for WITSML from Total Products should migrate to the same version of WITSML Need provisions for backup in case of system failure.
PRODML Roadmap Energistics 2 nd Annual Standards Summit 2 November 07 Laurence Ormerod, Weatherford.
© Copyright 2006 POSC WITSML™ SIG Meetings and Public Seminar & Exhibition Alan Doniger, POSC October 17-19, 2006 Aberdeen, Scotland.
© Copyright 2006 POSC Integrated Operations (Production) SIG Meeting Alan Doniger, POSC May 12, 2006 Houston, Texas.
Default price-quality paths for gas pipeline services Briefing on the Commission’s final decision for financial market analysts 28 February 2013.
ANASOFT VIATUS. Challenges Supply chain optimization is necessary for achieving competitive price of final products Synchronization and utilization of.
If you have a transaction processing system, John Meisenbacher
POSC WITSML™ Public Seminar and Exhibition
CANAL NETWORK CONTROL AJAY K BASU
Integrated Operation and economy
Intracompany Stock Transfer Scenario Overview
Intracompany Stock Transfer Scenario Overview
Intracompany Stock Transfer Scenario Overview
Presentation transcript:

Copyright © 2005 POSC Integrated Operations Update David Archer, POSC Integrated Operations SIG Meeting Stavanger, Norway 18 November 2005

Oil fields of the future: real-time oil and gas operations Onshore Facilities Decision Centers Offshore Facilities new capabilities – much more data; much more exposure

Copyright © 2005 POSC Stavanger Bergen Trondheim Aberdeen Integrated operations External experts Real time data Service Company’s onshore operation centre Control room offshore External experts Remote collaboration room Operator’s onshore operation centre * Knowledge * Decisions * Actions * Data integration * Information * Visualisation

Copyright © 2005 POSC

Smart Systems The basic approach of all “smart technology” is measure-model-control –measure system properties –model actual vs desired behaviour –derive required correction parameters (adaptive control) –implement control ∆ IntOPS Acquire Model Analyze Control Source: Shell IntOPS = Integrated Operations

Copyright © 2005 POSC Business Headquarters Capacity Planning Design [months/years] Operational Planning [months/years] Scheduling [days/months] Supervisory Control [minutes/hours] Regulatory Control [sec/minutes] Well & Surface facilities -Flow, pressure and temperature in wells and separator -Fuel injection to produce heat out of a boiler - SCADA systems for coordinating flow stations and pipelines -Gas distribution/optimization on a pipeline network -Monitoring wellheads, multiples and flow stations -Scheduling of injection/production plan and resources - Opening and closing wells or partial completions - Adjusting well operating parameters -Planning of injection/production plan and resources - Planning drilling and workover resources - Supply Chain Management & Market and customer demands -Asset life cycle and installed based maintenance or growth -Supply Chain Management & Market and customer demands Automation level Time-scale Fast cycle Slower cycle Source: Saputelli SPE Time Scales (10 6 range) IntOPS Acquire Model Analyze Control

Copyright © 2005 POSC The Problem? Theorem 1 : 50% of the problems in the world result from people using the same words with different meanings Theorem 2 : The other 50% of the problems results from people using different words with the same meaning Stan Kaplan, Risk Analysis, Vol. 17, No. 4, 1997

Copyright © 2005 POSC Board Economics Reservoir Engineering Expl Geology PetrophysicsPetroleum Engineering Drilling Engineering Production Geology Production Engineering Facilities Engineering Production OperationsGeophysics Drilling Operations Completion & Workover E&P Catalogue Standards XML exchange standards, design guidelines, profiles Data Store Solutions SIG IntOPS SIG Reference Data Standards Industry Dictionary Business Objects eRegulatory SIG Practical Well Log Standards WellHeader, WellPath, WellLog, LogGraphics, Production Reporting, DTS, … NDR Meetings POSC Standards / SIGs Epicentre™ Data Model

Board Economics Reservoir Engineering Expl Geology PetrophysicsPetroleum Engineering Drilling Engineering Production Geology Production Engineering Facilities Engineering Production Operations Geophysics Drilling Operations Completion & Workover E&P Subject Areas: WITSML Coverage Can we use this image to portray the growth in WITSML coverage?

General Board Economics Reservoir Engineering Expl Geology PetrophysicsPetroleum Engineering Drilling Engineering Production Geology Production Engineering Facilities Engineering Production Operations Geophysics Drilling Operations Completion & Workover E&P Subject Areas: WITSML Coverage Enhancements for raw, calculated and planned Well Path data, coordinate systems, and units.  WellPath Well Wellbore Trajectory  CRS, Projections  Units of Measure

General Board Economics Reservoir Engineering Expl Geology PetrophysicsPetroleum Engineering Drilling Engineering Production Geology Production Engineering Facilities Engineering Production Operations Geophysics Drilling Operations Completion & Workover E&P Subject Areas: WITSML Coverage Enhancements for wireline as well as LWD log data.  Log,WellLog

General Board Economics Reservoir Engineering Expl Geology PetrophysicsPetroleum Engineering Drilling Engineering Production Geology Production Engineering Facilities Engineering Production Operations Geophysics Drilling Operations Completion & Workover E&P Subject Areas: WITSML Coverage Enhancements for Production beginning with Volume and Activity Reporting, continuing with PRODML towards Optimization.  Network Model Volume Report Activity Report

General Board Economics Reservoir Engineering Expl Geology PetrophysicsPetroleum Engineering Drilling Engineering Production Geology Production Engineering Facilities Engineering Production Operations Geophysics Drilling Operations Completion & Workover E&P Subject Areas: WITSML Coverage We have a pending request to establish a Geophysical SIG. Such a SIG could lead to WITSML Geophysical data exchange Standards.

General Board Economics Reservoir Engineering Expl Geology PetrophysicsPetroleum Engineering Drilling Engineering Production Geology Production Engineering Facilities Engineering Production Operations Geophysics Drilling Operations Completion & Workover E&P Subject Areas: WITSML Coverage At a future time, we could consider the viability of data exchange Standards for facility data, reservoir data, economics data, etc. filling out the E&P space.

General Board Economics Reservoir Engineering Expl Geology PetrophysicsPetroleum Engineering Drilling Engineering Production Geology Production Engineering Facilities Engineering Production Operations Geophysics Drilling Operations Completion & Workover E&P Subject Areas: WITSML Coverage This would call for close cooperation with other industry groups to avoid duplication of effort and ensure smooth transitions.

Copyright © 2005 POSC PRODML: A Shared Solution for Upstream Oil and Gas Companies to Optimize Their Production What? –Project focused on optimization of oil and gas production Who? –BP, Chevron, ExxonMobil, Shell, Statoil, eProduction Solutions, Halliburton, Invensys, OSIsoft, Petroleum Experts, Schlumberger, Sense Intellifield, TietoEnator and POSC What? –Production optimization involves integrating real time data from specialty, multi-vendor software applications and streamlining work processes to enable oil and gas field operational efficiencies –Build on success of WITSML™ - develop the necessary XML-based data exchange solutions as an open industry standard –Extend the WITSML™ ‘architecture’ to include data needed for field production optimization How? When? –Drive towards commercial software products to improve data exchange and work process efficiency in production optimization - over a 12 month timeframe –POSC will maintain the standard and make it publicly available

Joint Work of Richard Carter, Todd Dupont and Henry Rachford Control of Gas Flow in Pipelines Why is it Hard, What Can We Do about it, and Why do We Care?

Consider a Typical Pipe 60 Miles Long 47 inches Inside Diameter 1000 Microinches Roughness Pressure, p(t), at Inlet Flow, q(t), at Outlet, where t is time p(t) = Pin q(t)=Qout 60 miles, 47” inside diameter. InletOutlet

Consider a Simple Scenario

Settling q Toward a New State Steady t=0 Pin = 850 psia Qout = 1842 MMSCFD Temp = 60 o F Set Qout = 2090 Hold boundaries constant for t>0

Relaxation Time, t r. Let and δ (x,t) = p(x,t) - p(x,T), for 0 < x < L, t o < t < T. From any pipeline state fix p at inlet, q at outlet, to cause a state change. Then for T >> t o, we find L = Pipe Length c = Sonic Velocity in gas f = Friction coefficient t = A time after a change v =Gas velocity to=to= A fixed value of t d = Inside Diameter T=T=A very large value of t t r = 46.5 minutes, t o = 10 minutes

Introduce Sensors [ S(P), S(Q) ] L = Pipe Length c = Sonic Velocity in gas f = Friction coefficient t = A time after a change v =Gas velocity to=to= A fixed value of t d = Inside Diameter T=T=A very large value of t p(t) = Pin q(t)=Qout Inlet Outlet S(Pin),S(Qin)S(Pout),S(Qout)

What Does This Mean for a Real Pipeline System? Response to control takes hours Controls to Achieve One Goal may Interact Unexpectedly with Others Look at an Example

300-Mile 5-Station Pipeline p(t) q(t) 50 mi 40 mi 45 mi 55 mi 60 mi SP 1 (t) SP 2 (t) SP 3 (t) SP 4 (t) SP 5 (t) Station #Max HPMax Set PointMin. Suct. p psia 500 psia In Out Out04 q 4 (t)

Effects of Such Control Control of Station k Discharge, SP k (t), Implies Control of Pipe-End Flow, q k (t), on the Suction Side This Looks Like the 1-pipe Scenario Try a Scenario we Might Find in the Field

A Simple Scenario Steady State with OUT-End Flow 1500, Station 4 Delivery 450 (in MMSCFD) SP k (0)=800 psia, k=1,…,5 (in Control) Hold ‘IN’ at 825 psia (0:00 to 24:00). At 09:00 increase Delivery at OUT to 1950 MMSCFD for 5- Hours, return to 1500 Delivery at 24:00 is Same as at 00:00, so Make End State Same as Start State Use Simple Control: All Setpoints stay 800 Call this Scenario 1.

300-Mile 5-Station Pipeline p(t) q(t) 50 mi 40 mi 45 mi 55 mi 60 mi SP 1 (t) SP 2 (t) SP 3 (t) SP 4 (t) SP 5 (t) Station #Max HPMax Set PointMin. Suct. p psia 500 psia In Out Out04 q 4 (t) Qout4(t)=450Pin(t)=825 Qout(0-9)=1500; Qout(9-14)=1950; Qout(14-24)=1500 SP k (t)=800

Observations on Delivery 5-Hour Increase at OUT adds 450 MMSCFD. This Adds Same as Out04 Flow 450 Increase Cannot be Supported at Steady State (Max Steady Increase is 150) Total Initial Gas in Pipe: 1.07 BCF (Initial State Linepack) Extra Delivery is 93.7 MMSCF, or 8.7% of Linepack

Initial Pipeline State

Scenario 1: All Stations SP=800

Scenario 1: Station 1, 1 Day

Scenario 1: Station 2 Control Interchange

Scenario 1: Station 5, 1 Day

Scenario 1 Deliver OUT-End? Ouch!

Scenario 1: Final State Day’s End: 2.4% Loss in Linepack

Scenario 1: % Linepack Change

Scenario 1 Fails. What Should Be the Control? For this, Enumerate Goals: Make Deliveries above Minimum p Do not Violate Maximum Allowable p Do not Deplete the Pipeline, e.g., Achieve the End-of-Day Target State Always Maintain Control, i.e., Never Default Control to Station Maximum Minimize Fuel Usage, Emissions

How Can We Find Controls? Recall p(t), q(t), q 4 (t) are Specified by Users We Need to find SP k ( t ), k=1, 2, …, 5 Guess the five SP k ( t ) functions. Recall 900 PSIA is maximum value for any SP k ( t ) Simulate Results, Compare with Goals Use Trial and Error to Satisfy Goals With Experience, guessing and trial and error will improve

Alternatively, Guide the Trial and Error with Mathematics Define the Control Set S = SP k (t n ), k =1,…,5, n = 1,…,23, say, i.e., t n = n, i.e. 115 numbers Begin as Before: Take SP k (t n ) = 800 Interpolate in time between Control Values and use Interpolated Values to Simulate the Gas Day Quantify Missed Goals as a Functional, J Calculate Gradient of J with Respect to S Iterate to revise SP k (t n ), so as to Minimize J. Call Resulting Control Scenario 2

INITIAL STATE THE SAME

Scenario 2: External Flows

Scenario 2: Station 1 Performance

Scenario 2: Station 2 Performance

Scenario 2: Station 3 Performance

Scenario 2: Station 4 Performance

Scenario 2: Station 5 Performance

OUT-End Delivery?

Scenario 2: End-of-Day State Pack only 0.16% less than original

Scenario 2: Flows, % Pack Change

Compare Scenario Results 12

Conclusions Mathematical Optimization Finds a Control to Achieve Goals in 1-2 Minutes Clock Time If Delivery were Infeasible, this Fact Would have been Found just as Fast If Loads Change During Day, Simply find New Controls for the New Schedule again in 1-2 Minutes Clock Time

Questions? David Archer President / CEO POSC 24 Greenway Plaza Suite 1315 Houston, TX mobile