OREGON DEPARTMENT OF TRANSPORTATION Practical Design Decision Matrix.

Slides:



Advertisements
Similar presentations
Metro Muncipal Agreement Program
Advertisements

Local Agency Bridge (LABP) Program Overview Informational Presentation – January 7, 2011 Carol Olsen, ODOT LGS Bridge Program Manager Local.
Oregon Jobs and Transportation Act Section 18 JTA Working Team (JTAT)
Oregon Jobs and Transportation Act Section 18
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
Transition from Q1- 8th to Q1- 9th edition
City of Eugene Certification Project Case Study. Why Did Eugene Get Certified? Can’t do fund exchange ODOT's Local Agency Program More project control.
Phases of Plan Development – Leading to High Quality Plans ACEC/ODOT Conference April 15, 2008 Steve Cooley, PE, PLS ODOT Region 2 Technical Center Manager.
ODOT – FHWA Environmental Performance Measures February 2012.
JTA Section 18 Implementation Update Ken Franklin Geo-Environmental ODOT 28 April 2011.
Project Prospectus and Design Acceptance Package ( and a little more) Alan Lively Project Delivery Specialist January 30, 2009.
Alternative Project Delivery
Oregon Jobs and Transportation Act Section 18 CETAS Director’s Meeting Action Items.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
ISO 9001 Interpretation : Exclusions
Overview of the Federal Aid Process for Transportation Projects.
WETLANDS and ODOT Environmental Services Oregon Department of Transportation.
Office of Traffic, Safety and Technology Module 6 Specifications and Special Provisions Traffic Control Plan Development Course.
Patrick DeCorla-Souza, P3 Program Manager, FHWA
WETLANDS and LOCAL PROGRAMS Environmental Services Oregon Department of Transportation.
Improving Understanding, Function and Procedural DBE Compliance ODOT OCR DBE Triage Training Office of Civil Rights DBE Program ODOT Training March 1,
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Presented by Molly Skorpik at the 2011 Montana Association of Dam and Canal Systems Conference Presented by Molly Skorpik at the 2011 Montana Association.
 Sign Inventory  Rule – 37.I  Types of signs Inventoried Outdoor Advertising Official and Directional Public Service Notice Service Clubs.
Oregon Jobs and Transportation Act Section 18 External Stakeholder Meetings.
1 Developing Scope of Work, Budgets and Schedules for the OTIA III State Bridge Delivery Program Raymond Mabey, Deputy Program Manager, ODOT Lynn Iaquinta,
Mn/DOT AUDIT COUNTY HIGHWAY ACCOUNTANTS SINGLE AUDIT DISCUSSION.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Matthew Udenenwu Waste Permits Division 2015 TCEQ Environmental Trade Fair.
Construction Site Best Management Practices and the Project Design Process.
Oregon Jobs and Transportation Act Section 18 Bill Ryan and Jennifer Sellers Geo-Environmental, ODOT Tech Services.
PA Department of Environmental Protection Continuous Source Monitoring Manual (Manual, Revision 8)
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Roles & Responsibilities Project Biologist.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
At the last Steering Team meeting… Goals (Rule-level) EPS (Measurable and Reportable) Natural Resources Human/Cultural Environment Administrative Avoid,
Local Government Section Welcome Marty Andersen ODOT Local Government Section 355 Capitol Street NE, Rm. 326 Salem, Oregon Ph:
SAFETEA-LU Section 6002 “ Efficient Environmental Reviews for Project Decisionmaking”
JTA Section 18 Steering Team Meeting Environmental Performance Standards.
ODOT’s Local Agency Certification Program Jill Pearson Certification Program Manager March 12, 2010.
1 C E T A S Purpose and Need Presentation Date Project Name Project location (city, county) ODOT Key Number:
Number of Copies Agency Submissions & Comments. Coordination ESRs are reviewed by OES and coordinated with resource agencies as part of the NEPA review.
US Army Corps of Engineers BUILDING STRONG ® Keys to a Successful AE Contract David Yankey, PE Chief, Army and Air Force Section Engineering Management.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Mass Highway Department (MHD) Design Process Anticipate possible use of MHD funds Anticipate possible use of MHD funds New Design Guide for Project Development.
Locally Administered Federal-Aid Project Initiation Workshop Prospectus Part 3 and NEPA Requirements Presenter: Howard Postovit; ODOT Region 5 Region Environmental.
Trivia Certification Program Trivia Mark Foster ODOT Region 1 Liaison and Federal Aid Specialist March 12, 2010.
FEDERAL/STATE FUNDING EXCHANGE PROGRAM MICHELE RISKO, CEAO.
Local Agency Programs An Overview Gonzalo Puente, PE Shaun Bates, PE Development Engineer Project Manager.
Project Development Process. ODOT’ PDP A project management and transportation decision-making tool. Developing the detail to the level necessary to make.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Early Coordination This required step.
1. Design-Build is a project delivery process in which the design and construction phases of a project are combined in a single contract. The consultant.
In the ideal world… Transportation planning addresses NEPA principles. Collaboration/involvement starts in transportation planning. Planning leads to early.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
Responsibilities of Lead Agency Pages 7-8 of Training Guide 1. Preliminary review a) Determine if activity is a project as described by CEQA b) May require.
OTC Pres: Bid & Award Phase 4 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Eryca McCartin, Office.
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director Office of Estimating 2015 OCA Leadership Forum.
JTA Section 18 Better, Faster, Cheaper for Highway Construction Projects TRB Waste Management and Resource Efficiency Workshop Jennifer Sellers, Geo-Environmental.
Project Delivery Performance Improvement Report to the Oregon Transportation Commission Hal Gard, Technical Services, Geo-Environmental Dee Jones, Technical.
The Contract Management Process Post Award Activities.
Construction Management At Risk Process
MnDOT AUDIT 2016 COUNTY HIGHWAY ACCOUNTANTS CONFERENCE ANNUAL FEDERAL CITY COUNTY AUDIT DISCUSSION.
Holly Street Bridge Retrofit and Rehabilitation Project
Requirements for Low-Level Radioactive Waste Minimization Plans Rich Janati, M.S., Chief Division of Nuclear Safety PA Dept. of Environmental Protection.
Oregon Jobs and Transportation Act Section 18
LOCALLY ADMINISTERED PROJECTS
THE ROLE OF THE PLANSET IN CONTRACT DOCUMENTS
Project Development Quality Program QA/QC – What does ODOT need?
Consultation (C) After approval of the EIS, FONSI, or CE designation, the applicant shall consult with the Administration prior to requesting any major.
Metro Muncipal Agreement Program
Environmental Commitments
Presentation transcript:

OREGON DEPARTMENT OF TRANSPORTATION Practical Design Decision Matrix

OREGON DEPARTMENT OF TRANSPORTATION Practical Design Decision Matrix The Project Delivery System Transportation Planning Identify Potential Projects Management Systems Analysis Preliminary Plans for Construction Right of Way& Permits Design Acceptance Phase DAP Draft Scope, Schedule,Cost Estimate– Draft STIP Project Selection– Final STIP Survey,Maps, Engineering& Environmental Reports Advertise& Bid Opening for DBB Design/Bid/Build Project Initiation PS&E Package Final Plans, Specs& Estimates for Construction Before On-Site Work Begins Award Contract Transition to Maintenance On-Site Work Completed Acceptance of Project S T A R T On-Site Work Begins FINISH ODOT Project Delivery Life-Cycle Model C o n s t r u c t i o n M a n a g e m e n t Award Construction Contract Project Development Integrate& Document Integrate& Document Program Development Integrate& Document Integrate& Document S afety C orridor Context O ptimize the System P ublic Support E fficient Cost S afety C orridor Context O ptimize the System P ublic Support E fficient Cost Integrate& Document

OREGON DEPARTMENT OF TRANSPORTATION “SCOPE” (PD’s primary values) JTA Sec. 18 Guiding Principles Practical Design + JTA Section 18 JTA Section 18 The Project Delivery System Transportation Planning Identify Potential Projects Management Systems Analysis Preliminary Plans for Construction Right of Way& Permits Design Acceptance Phase DAP Draft Scope, Schedule,Cost Estimate– Draft STIP Project Selection– Final STIP Survey,Maps, Engineering& Environmental Reports Advertise& Bid Opening for DBB Design/Bid/Build Project Initiation PS&E Package Final Plans, Specs& Estimates for Construction Before On-Site Work Begins Award Contract Transition to Maintenance On-Site Work Completed Acceptance of Project S T A R T On-Site Work Begins FINISH ODOT Project Delivery Life-Cycle Model C o n s t r u c t i o n M a n a g e m e n t Award Construction Contract Project Development Integrate& Document Integrate& Document Program Development Integrate& Document Integrate& Document Integrate& Document

OREGON DEPARTMENT OF TRANSPORTATION “SCOPE” (PD’s primary values) JTA Sec. 18 Guiding Principles Transportation Planning Identify Potential Projects Management Systems Analysis Preliminary Plans for Construction Right of Way& Permits Design Acceptance Phase DAP Draft Scope, Schedule,Cost Estimate– Draft STIP Project Selection– Final STIP Survey,Maps, Engineering& Environmental Reports Advertise& Bid Opening for DBB Design/Bid/Build Project Initiation PS&E Package Final Plans, Specs& Estimates for Construction Before On-Site Work Begins Award Contract Transition to Maintenance On-Site Work Completed Acceptance of Project S T A R T On-Site Work Begins FINISH ODOT Project Delivery Life-Cycle Model C o n s t r u c t i o n M a n a g e m e n t Award Construction Contract Project Development Integrate& Document Integrate& Document Program Development Integrate& Document Integrate& Document Integrate& Document The Project Delivery System Post- Construction Commitment Management Integrate & Document NEW

OREGON DEPARTMENT OF TRANSPORTATION 2(a) Incorporating EPS into the design and construction of all state highway construction projects… Construction Management Award Construction Contract Project Development Program Development EPS EPS  Contract language & Special Provisions EPS Doc. EPS ? Post Construction Commitment Management EPS Doc. Monitoring Reporting EPS

OREGON DEPARTMENT OF TRANSPORTATION “SCOPE” (PD’s primary values) JTA Sec. 18 Guiding Principles The Project Delivery System Transportation Planning Identify Potential Projects Management Systems Analysis Preliminary Plans for Construction Right of Way& Permits Design Acceptance Phase DAP Draft Scope, Schedule,Cost Estimate– Draft STIP Project Selection– Final STIP Survey,Maps, Engineering& Environmental Reports Advertise& Bid Opening for DBB Project Initiation PS&E Package Final Plans, Specs& Estimates for Construction Before On-Site Work Begins Award Contract Transition to Maintenance On-Site Work Completed Acceptance of Project S T A R T On-Site Work Begins FINISH ODOT Project Delivery Life-Cycle Model Award Construction Contract Project Development Integrate& Document Integrate& Document Program Development Integrate& Document Integrate& Document Integrate& Document Check-In # 1 Id program purpose and scale Check-In # 2 Project Charter– initialize, finalize, validate and document Check-In # 3 Finalize DAP— validate and document Check-In # 4 Document: -- decisions made (what and who) -- changes (what and why) -- how values addressed Check-In # 5 Success indicators— evaluate and document Construction Management

OREGON DEPARTMENT OF TRANSPORTATION ODOT Environmental Permitting Processes Regulatory Agency Permitting Processes Compliance documentation Permit applications Special Provisions IGAs and MOAs w/ regulatory agencies Site inspections/monitoring reports Permits/clearances Notices of violation Site inspections Programmatic permits MOAs and IGAs with ODOT Environmental Permitting Process 2(b) Improving the environmental permitting process for state highway construction projects in order to…(A) – (D) ? ? Construction Management Award Construction Contract Project Development Program Development EPS EPS  Contract/ Special Provisions EPS Doc. EPS ? Post Construction Commitment Management EPS Doc. Monitoring Reporting EPS

Environmental Permitting Process

OREGON DEPARTMENT OF TRANSPORTATION Environmental Permitting Process Environmental Scoping and Assessment Compliance Documentation Environmental compliance documentation Special Provisions (if applicable) ODOT Environmental Processes Project Delivery Processes (Project Design)  Project review request No application submittals necessary Examples Projects where impacts avoided Projects that meet regulatory exemptions COE ODOT Bridge RGP (OTIA 3) – Tier Certifications for COE NWPs SHPO 106 PA   Batching Regulatory Agency review

OREGON DEPARTMENT OF TRANSPORTATION Environmental Permitting Process (Generic) Environmental Scoping and Assessment Compliance Documentation Application development Application check Final agency decision Pre-App Meeting  Issued permit/clearance   App Regulatory Agency Process ODOT Environmental Project Delivery Processes (Design)

OREGON DEPARTMENT OF TRANSPORTATION Environmental Permitting Process (Generic) Environmental Scoping and Assessment Compliance Documentation Application development Application check Public review Final agency decision ODOT Review and Response Pre-App Meeting Other Regulatory Agency Processes  Issued permit/clearance       App Regulatory Agency Process ODOT Environmental Project Delivery Processes (Design)