GKRSE law offices of GKRSE 1 Federal Regulatory Issues Affecting the Development of Hydro in the Northeast Nancy J. Skancke Law Offices of GKRSE Washington,

Slides:



Advertisements
Similar presentations
Regulatory Process and Other Models Arizona Corporation Commission Fifth Biennial Transmission Assessment Commission Decision Workshop on Transmission.
Advertisements

SAFETEA-LU Efficient Environmental Review Process (Section 6002) Kelly Dunlap.
Connecticut Department of Energy and Environmental Protection.
NEPA Environmental Procedure Pam Truitt, Grants Management Consultant  September 4, 2014.
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
LNG USA 2005 IQPC Houston, Texas November 9, 2005 Bruce F. Kiely Baker Botts L.L.P. Washington, D.C.
Tidal Energy in Alaska Permitting Issues Michael Murphy Devine Tarbell & Associates.
PROJECT INFORMATION PUBLIC OUTREACH WHO IS INVOLVED?
IRWA 2013 Federal Agency Update Bureau of Land Management (BLM) U.S. Forest Service (USFS) Energy Corridors & Rapid Response Team.
Ocean and Tidal Energy Emerging Technologies: Permitting, Generation and Transmission Cherise M. Oram 2009 Environmental and Land Use Law Section Midyear.
Multi-Sector Ocean Use: Traditional and Alternative Energy MAFAC Meeting May 13, 2009.
Eric J. Tomasi – Project Manager Division of Gas – Environment & Engineering Office of Energy Projects Federal Energy Regulatory Commission Northeast Energy.
NHPA, Section 106, and NEPA Highlights and Misconceptions.
Harnessing the Power of Waves and Tides
FERC & Hydrokinetic Projects Ocean Energy for New England Conference Hosted by the Marine Renewable Energy Center at the Advanced Technology and Manufacturing.
FERC and the Development of an Alaska Natural Gas Pipeline Robert J. Cupina, Deputy Director Office of Energy Projects Federal Energy Regulatory Commission.
NHA Midwest Regional Meeting Presentation May 18, 2011.
Our mission ead and execute environmental programs and provide expertise that enables Army training, operations, acquisition and sustainable military communities.
1 Brace Centre for Water Resources Management McGill University, Sept. 25 François Boulanger, Regional Director The New Canadian Environmental Assessment.
Page CDBG Recipients' Workshop Community Finance Division NEPA Environmental Procedures.
Permitting & Policies of Wind on the Water – Great Lakes – Presented By Katherine A. Roek STOEL RIVES LLP June 16, 2009.
Emerging Legal Issues Chuck Sensiba, Van Ness Feldman LLP Northwest Hydroelectric Association Annual Conference February 18, 2014.
Is NEPA Preventing Energy Development? Bryan Hannegan, Ph.D. Associate Director – Energy and Transportation White House Council on Environmental Quality.
Blackstone Hydropower Status Report 3 rd Annual River Users Conference Blackstone Valley Tourism Council Tricia Jedele, Conservation Law Foundation Bruce.
State of Oregon New Hydroelectric Projects Mary Grainey October 2008 Oregon Water Resources Department.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Massachusetts Ocean Planning Process MREC Conference October 6, 2008.
= Yr NG price high point Data Source - AFDC. Natural gas prices historically have remained, in general, below crude oil prices, except during the winter.
State Permitting Issues for Wind Developments Southeast and Mid-Atlantic Regional Wind Summit 19 September 2005 Jennifer A. DeCesaro Energy Policy Specialist.
1 Financing Wind Power: The Future of Energy IPED Scottsdale, AZ * May 7 - 9, 2008 ARE THERE MUNICIPAL BONDS IN THE WIND? Travis C. Gibbs, Esquire Nixon.
Citizens Advisory Committee to the Chesapeake Executive Council November 29, 2012.
Marine Spatial Planning for Wave Energy Development in Oregon Kate Sherman, M.S. Candidate Marine Resource Management College of Earth, Ocean, and Atmospheric.
Development of Micro-Hydro Projects Stacey Simms Associate Director, Programs CREA Energy Innovations Summit.
Alternative Energy on the Outer Continental Shelf Robert P. LaBelle Deputy Associate Director Offshore Energy and Minerals Management Minerals Management.
B r a z o s R i v e r A u t h o r i t y FERC Encroachments.
INTRODUCTION TO SECTION 4(f) Presented by Ian Chidister Environmental Program Manager FHWA – Wisconsin Division December 4, 2013.
Integrating Other Laws into BLM Planning. Objectives Integrate legal requirements into the planning process. Discuss laws with review and consultation.
NEPA Environmental Procedure Pam Truitt, Grants Specialist  September 10, 2015.
FERC Office of Energy Projects 1 Hydroelectric Licensing Regulations Final Rule July 23, 2003 Federal Energy Regulatory Commission Office of Energy Projects.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Technical Meeting May 16, 2007, 1-4 pm Red Lion Redding, CA.
Participation and Intervention before the FERC October 2007.
The Energy Policy Act of 2005 and Its Revisions to PURPA November 11, 2005 Grace D. Soderberg Assistant General Counsel National Association of Regulatory.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
Siting Ocean and Tidal Energy Projects Cherise M. Oram STOEL RIVES LLP Oregon Law Institute Going Green: Advising Clients in the New World of Sustainability.
1 CDBG and Environmental Review For Local Officials.
April 2006 Middle Fork Project Relicensing Process April 25, 2006
HYDROELECTRIC POWER AND FERC. HYDRO 101A ”Water Runs Down Hill”
Council Workshop, June 24, Image Date: 1/15/2014 Future WWTF No. 2 Capacity 2.0 MGD., Expandable to 6.0 MGD. Future WWTF No. 2 Capacity 2.0 MGD.,
February 18, 2014 Federal Energy Regulatory Commission 1.
California Energy Commission Transmission Interconnection and the California Energy Commission Generator Licensing Process PANC 2010 Annual Seminar San.
Implementing Wave Energy Process and Permitting Issues Presented by Therese Hampton February 20, 2008.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Shasta County Board of Supervisors March 4, 2008.
Utah Geothermal Power Generation Workshop Regulatory Issues August 17, 2005 Presented by Becky Wilson Utility Economist Utah Public Service Commission.
1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO.
Decommissioning Rules & Funds for Renewable Energy Facilities RenewElec Workshop October 21, 2010 Jonathan Voegele Research Associate Institute for Energy.
June 2008 Windsor-Essex Electrical Service Needs and Solutions.
Non-Federal Development at Reclamation Facilities.
Hydropower on the Upper Mississippi River Development Activities and Agency Coordination Upper Mississippi River Basin Association June 5, 2013.
Regulatory Platforms for CO2 trading regulation Last Week Discussion of Agencies, Purpose and How Operate that may be in charge of Carbon Trading at the.
Water Quality Certification for hydropower licensing in Wisconsin.
Middle Fork Project Relicensing Process Plan April 25, 2006.
1 Water Cooperative of Central Florida Utilities Department Orange County Board of County Commissioners July 26, 2011.
Overview of Energy Policy Act of 2005 A Review of Implementation issues in New Hampshire.
Federal Energy Regulatory Commission 1 Overview of the Federal Energy Regulatory Commission (FERC) Roland W. Wentworth Office of Markets, Tariffs and Rates.
Legislative History. First enacted in 1934  Enacted due to concerns over the loss of commercial and sport fisheries from water resource developments.
Development Charge Public Meeting October 23, 2017
Michigan Dept. of Environmental Quality Water Resources Division
Solar Energy Commercialization Utility Scale Business:
Presentation transcript:

GKRSE law offices of GKRSE 1 Federal Regulatory Issues Affecting the Development of Hydro in the Northeast Nancy J. Skancke Law Offices of GKRSE Washington, D.C / June 25, 2009 Waltham, MA

GKRSE law offices of GKRSE 2 Primary Federal Statutes and FERC Regulations Relating to Hydro Projects Federal Power Act, Sections 4, 10, 14, 15, U.S.C. §§ 797, 803, 807, 808 and 811 Clean Water Act, Section 401 (potentially applicable) 33 U.S.C. § 1341 Endangered Species Act, Section 7 16 U.S.C. § 1536 Coastal Zone Management Act 16 U.S.C. § National Historic Preservation Act 16 U.S.C. § w-6 FERC Regulations – 18 CFR Parts 4, 5 and 16

GKRSE law offices of GKRSE 3 FERC Preliminary Permit Process Preliminary Permit – FPA §5; FERC Regs. §4.80 et seq.  Priority in licensing process  Maximum 3-year term; not transferable.  Need to coordinate with the ILP timeframes.  No operations permitted; testing permitted (no grid generation). “Strict Scrutiny” Policy – FERC Docket No. RM07-8 (2007)  Limiting boundaries of permits to prevent site banking.  Careful scrutiny of periodic reports under preliminary permit.  Requirement in permit order of additional 45-day filing: schedule of activities for three-year term (including within 1 year of permit – filing of NOI, PAD and request to use TLP/ALP if applicable).

GKRSE law offices of GKRSE 4 FERC’s Hydro Licensing Processes Integrated Licensing Process (“ILP”) – FERC Regs. Part 5  Default process as of July  Pre-application: Extensive issue identification with resource agencies, tribes, all stakeholders and FERC. Early study identification and study dispute resolution. Traditional Licensing Process (“TLP”) – FERC Regs. Parts 4 and 16  Requires prior approval by FERC; FERC Staff not involved until application filed.  Pre-application: Three-stage consultation process. Alternative Licensing Process (“ALP”) – FERC Regs. §4.34(i)  Requires prior approval by FERC; FERC Staff participates in pre-application process.  Pre-application: Collaborative process with agencies, tribes, stakeholders. New Hydrokinetic Pilot Project process (Guidance document 2008).

GKRSE law offices of GKRSE 5 FERC’s Exemption Processes Small Hydro Exemption – FERC Regs. § 4.101, et seq.  Per PURPA §§ 405 and 408 (1980, per Energy Security Act, §408)  Pre-1977 existing dams or natural water features.  No new construction or enlargement (only repair/reconstruction). Conduit Exemption – FERC Regs. § 4.90, et seq.  FPA §30 (added by PURPA §210, 1978)  Not more than 15 MW; or not more than 40 MW for municipal-operated solely for municipal water supply.  Using water not operated primarily for hydro development. Conditions on Both types of exemptions –  Conditions from Federal/State fish/wildlife agencies.  No eminent domain authority.  No term limit. Authority of FERC to waive its requirements.

GKRSE law offices of GKRSE 6 FERC Jurisdictional Criteria Per FPA 23(b)(1), non-Federal hydro project must be licensed ( unless has valid pre-1920 permit), if:  is located on navigable water of the U.S.;  Occupies lands of the U.S.;  Utilizes surplus water or waterpower from government dam; or  Is located on “Commerce Clause” body of water, project construction has occurred on or after August 26, 1935, and project affects the interests of interstate/foreign commerce. Declaration/Jurisdictional Finding – FERC Regs. §24.1 Considerations –  Public lands/reservations involved?  Use of water from Federal dam?  Navigability at site or near?  Connection of power to grid?

GKRSE law offices of GKRSE 7 OCS Development Energy Policy Act of 2005 – MMS to regulate renewable energy development on OCS. MOU between MMS and FERC, April 9, 2009  MMS – exclusive jurisdiction on production from non-hydrokinetic renewable projects and to issue leases/easements/rights-of-way on OCS.  FERC – exclusive jurisdiction for licenses/exemptions for projects on OCS; not issue until lease/easements/ROW obtained.  Need for coordination between MMS and OCS.  Further guidance on MOU expected. MMS OCS Regulations – 30 CFR Parts 250, 285 and 290 (April 29, 2009) [Fed. Reg ]

GKRSE law offices of GKRSE 8 Small Hydro Potential for small hydro development –  2004 DOE Report: 21,000 MW available at low head/low power; 26,000 MW at high head/low power.  Update analysis of hydro potential.  Existing dams without generation; upgrades to existing power generation facilities. Issues/Barriers to development –  Regulatory  Environmental  Cost/Financing  Operational/Engineering NHA’s new Small Hydro Council

GKRSE law offices of GKRSE 9 Current “Hot” Issues under FERC Licenses Capacity/non-capacity amendments Endangered species Fish resources/fish passage Land use Shoreline management Recreation/permitting programs Security Annual charges (OFA/FERC)

GKRSE law offices of GKRSE 10 Other Hydro Issues Financing Projects –  Production Tax Credits or Investment Tax Credit; FERC certification process; convertible to grant.  Clean Renewable Energy Bonds; IRS allocation. DOE Funding –  R&D Funds – “Stimulus Funds”; Annual funding.  National Hydropower Asset Assessment Project – to be issued December Potential Federal Legislation –  Status of hydro under RPS/RES Standard  Potential need for certification

GKRSE law offices of GKRSE 11 Case Study: Holyoke, Mass.

GKRSE law offices of GKRSE 12 Case Study (cont.) Background –  Three-level canal system on Connecticut River.  Hydro installed at Hadley Falls originally in 1849; expanded in 1950’s. Holyoke Project, FERC Project No  Originally licensed in 1949 to Holyoke Water Power Company.  Competitive license proceeding – New License issued in August  BO on SNS – jeopardy finding in  HG&E acquisition in 2001; license transferred.  Six hydropower stations and Canal System; approx. 43 MW. Comprehensive Settlement –  Filed in 2004; approved by FERC in  Adaptive management on Downstream Fish Passage (SNS)  Resolved all pending rehearing applications; mandatory conditions withdrawn.  New BO on SNS, based on Settlement, with no jeopardy finding.

GKRSE law offices of GKRSE 13 Case Study (cont.) Implementation of Settlement – Downstream fish passage:  Studies/Analyses  Ongoing agency/stakeholder consultation  Schedule for implementing solution. Canal Projects  Holyoke City 1, 2, 3, 4 (constructed in 1922, 1938 and 1940, respectively); licensed in late 1980’s.  Holyoke City 4 (constructed in 1900, relicensed in 2006).  Valley Hydro/Holyoke City 5 (constructed 1994, licensed in 1990).  Eight Harris Projects acquired by HG&E in CREB for Boatlock Station (Project No. 2004) based on IRS Allocation of $2.5 million.

GKRSE law offices of GKRSE 14 Potential New Technologies for Hydro