Problems setting-up the ALBA FOFB Problems setting-up the ALBA FOFB DEELS14 12-13May - ESRF Angel Olmos.

Slides:



Advertisements
Similar presentations
Orbit Feedback NSLS-II stability workshop Visitor committee April 20, 2007.
Advertisements

22-23/06/20093 rd Libera Users Meeting, ESRF1 3 years of experience of Libera BPMs at SOLEIL Nicolas HUBERT Synchrotron SOLEIL On behalf of Diagnostics.
P.N. Burrows ATF2 Project Meeting, KEK, 14/12/091 Feedback On Nanosecond Timescales Philip Burrows Glenn Christian Hamid Dabiri Khah Javier Resta Lopez.
Mark Heron Diamond Light Source Oct 2007 EPICS EPICS Interface to the Libera Electron Beam Position Monitor.
Digital RF Stabilization System Based on MicroTCA Technology - Libera LLRF Robert Černe May 2010, RT10, Lisboa
Experimental set-up at E.S.R.F. L. Farvacque. 1/04/2004L. Farvacque - E.S.R.F.2 Experimental set-up Hardware Kickers Bpms Software Data acquisition processing.
Pohang Accelerator Laboratory POSTECH EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN EPICS collaboration meeting 2004 Dec , 2004 RICOTTI,
FAST ORBIT CORRECTION AT THE ESRF Eric Plouviez on behalf of: J. Chavanne, J.M. Koch, J.L. Pons, F. Uberto, L. Zhang.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Stability Workshop April , 2007 NSLS-II Electrical Systems G. Ganetis NSLS-II Electrical Systems NSLS-II.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
29/06/2007FOFB at Diamond1 Fast Orbit Feedback (FOFB) at Diamond Guenther Rehm, Head of Diagnostics Group.
EMMA Electrical Engineering July 06 EE & PS Group EE & PS Group – EMMA 06
Power Supply Controller Architecture
3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 1/33 Preparation work for ALBA’s Closed-Orbit BPMs 3rd Libera Users.
Alignment and Beam Stability
Synchronous Device Interface at NSLS-II Yuke Tian Control Group, NSLS-II, BNL (May 1, 2009 EPICS Collaboration Meeting, Vancouver)
Beam Instrumentation for Orbit Stability I. Pinayev.
Volker SchlottIWBS’04, Grindelwald, Report on internal „mini-workshop on beam stability at SLS” SLS PAUL SCHERRER INSTITUT The workshop.
Characterization of Fast Orbit Feedback System Om Singh, APS, ANL NSLS-2 Beam Stability Workshop BNL, April 18-20, 2007.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
IWBS 2004 PSI, Grinderwald, Switzerland 6-10 December Orbit Stability: Recent Activities at ELETTRA, D. Bulfone Orbit Stability: Recent Activities.
Feedback on Nanosecond Timescales (FONT) - Review of Feedback Prototype Tests at ATF(KEK) Glenn Christian John Adams Institute, Oxford for FONT collaboration.
12/6/2004ALS, C. Steier, IWBS IWBS 2004: ALS Facility Report Christoph Steier, A. Biocca, M. Chin, E. Domning, G. Portmann, D. Robin, T. Scarvie,
Booster Cogging Upgrades Craig Drennan, Kiyomi Seiya, Alex Waller.
Status of the control system of Alba Introduction The construction of ALBA, the 3 GeV Synchrotron Light Source near Barcelona (Spain) is proceeding according.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
EPICS 2011 Spring Meeting, Hsinchu, June 13-17, 2011 Pei-Chen Chiu On-behalf of the TPS Feedback Team NSRRC, Hsinchu, Taiwan Power Supply Control Interface.
Power Supply Control at NSLS-II Yuke Tian Control Group, NSLS-II, BNL (May 1, 2009 EPICS Collaboration Meeting, Vancouver)
18-20 December rd ATF2 Meeting, KEK ATF2 Power Supplies1 ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David.
Ethernet Based Embedded IOC for FEL Control Systems J. Yan, D. Sexton, Al Grippo, W. Moore, and K. Jordan ICALEPCS 2007 October 19, 2007 Knoxville Convention.
Photon Beam Position Monitors and Beam Stability at the Swiss Light Source E. van Garderen, J. Krempaský, M. Böge, J. Chrin, T. Schmidt Paul Scherrer Institute,
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
Nuruzzaman ( Hampton University Group Meeting 1 st November 2011 Beamline Optics Using Beam Modulation for the Q-weak Experiment.
Activities on the Orbit Feedback System for the Super-SOR Light Source SRL-ISSP, University of Tokyo Norio Nakamura 3rd International Workshop on Beam.
Magnet Controls GroupOctober 4, Scope, Cost Estimate and Schedule To Complete The LCLS Magnet PS Controls P Bellomo and Kristi Luchini.
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
1 BROOKHAVEN SCIENCE ASSOCIATES Issues on Closed Orbit Feedback for NSLSII NSLS-II Stability Workshop April 18-20, 2007 Li-Hua Yu.
1 BROOKHAVEN SCIENCE ASSOCIATES Stability Issues NSLS-II PAC Meeting May 24, 2007 S. Krinsky.
ATF2 Software tasks: - EXT Bunch-Bunch FB/FF - IP Bunch-Bunch FB - FB Integration Status Javier Resta-Lopez JAI, Oxford University FONT meeting 1th August.
1 BROOKHAVEN SCIENCE ASSOCIATES Power Supply Status George Ganetis Power Supply Status ASAC Review October 22-23, 2009.
Magnetic Field Stability Measurements Joe DiMarco 23Oct07.
1 BROOKHAVEN SCIENCE ASSOCIATES Open-Source Distributed Deterministic Device Control Larry Doolittle Alex Ratti Bob Dalesio.
Photon Beam Position Monitors and Beam Stability at the Swiss Light Source Elsa van Garderen March 12 th, 2008.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
Electron beams in order to sense nm-size mechanical vibrations? CERN: Marek Gasior: BBQ electronics (Andrea Boccardi: VME electronics) Juergen Pfingstner:
4. Operations and Performance M. Lonza, D. Bulfone, V. Forchi’, G. Gaio, L. Pivetta, Sincrotrone Trieste, Trieste, Italy A Fast Orbit Feedback for the.
Recent APS Storage Ring Instrumentation Developments Glenn Decker Advanced Photon Source Beam Diagnostics March 1, 2010.
1 Jean-Claude DENARD Workshop on Accelerator R&D for Ultimate Storage Rings Version 2.0 ORBIT FEEDBACK SYSTEMS and XBPMs J-C. Denard, N. Hubert * and L.
1 BROOKHAVEN SCIENCE ASSOCIATES Beam Stability Overview NSLS-II CFAC Meeting May 8, 2007 S. Krinsky.
Anticipated Limits on Machine Stability and some Consequences on Machine and Beamline Designs Jean-Claude Denard Workshop on Accelerator R&D for USRs Hairou,
Fast Global Orbit Feedback for the Australian Synchrotron Eugene Tan Accelerator and Operations 13/12/20101 ACAS Workshop on Accelerator Feedback Systems.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
MACHINE OPERATION AT ALBA Montse Pont, CELLS-ALBA 16-18/12/2013.
2nd Libera Users’ Meeting 3rd and 4th of April 2008 ALBA
Beam position measurements at synchrotron light sources
Libera and ELETTRA Marco Lonza, Giulio Gaio, Vincenzo Forchi’
SOLEIL Fast Orbit Feedback System
Snr Power Supply Engineer
P. Forck, P. Kowina, M. Schwickert, R. Singh
SOLEIL Fast Orbit Feedback System
Commissioning the Fast Orbit Feedback System at SSRF
Fast Orbit Feedback System for HEPS (Cooperation work among all related systems) Dapeng Jin Control System Dec. 12, 2017.
Electronics requirements for special diagnostics for the XFEL
Latency measurements on the ALBA Electron units
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Present Status of Orbit Stabilization at SPring-8
Fast Orbit Feedback at the SLS
Presentation transcript:

Problems setting-up the ALBA FOFB Problems setting-up the ALBA FOFB DEELS May - ESRF Angel Olmos

ALBA FOFB Overview Latest Results Problems of Data Transfer on cPCI Setting the PI loop (No) Correction of Kickers signal Summary Current Problems OUTLINE

We aim to achieve orbit stability on the sub-micron level up to frequencies in the 100 Hz range “Recycled” timing boards used as position reading nodes (sniffers) This is a first stage “low-cost” system to learn about beam stabilization and better define the future system 88 BPMs out of the 120 available will be used on FOFB 88 Horizontal / 88 Vertical corrector magnets Libera Brilliance running Diamond Communication Controller protocol for data transfer Distributed correction calculation on 16 dedicated CPUs No Slow Orbit Feedback RF frequency control by standalone process ALBA FOFB Overview Not only Desy recycles

cPCI crate IP modules Libera Next sector Previous sector PMC board (sniffer) CPU Tx Board Corrector PS Tx Board Corrector PS … ALBA FOFB Overview Main equipments interconnection One sector out of 16

eBPM electronics ALBA FOFB Overview Libera Brilliance - software Release 2.09 Diamond Communication Controller to handle the position data transfer between units Optical links from 2 Liberas on each sector are laid to a central patch panel Routing of each link can be done from-to any sector A ring-type topology is used for the time being Only one optical link is used to send BPMs data to the PMC FPGA board

PMC FPGA boards ALBA FOFB Overview Decision to re-use some Micro-Research EVR-230 boards that we had in-house These boards were meant for timing purposes on Beamlines but never installed Xilinx Virtex-II FPGA is an already obsolete device Do only have one single optical link for position data transfer No redundancy and so low FOFB reliability The boards are already known by ALBA controls staff Overall cost reduction of the FOFB becomes significant Integration of CC has been done by Diamond

Correction Calculation CPU ALBA FOFB Overview Adlink 4-Cores cPCI-3970 CPU running soft real time Linux Retrieves the position data from the PMC FPGA board and performs the calculation of the needed correction setpoints Adlink single, dual and 4-Cores cPCI CPUs have been analyzed Also different Kernel and Linux OS versions were tested because the handling of the interruptions forced CPU dead-times Processes distributed to different Cores (Read BPM, Calculation, CPU-cPCI stuff)

Power converter I/V transducer ADC PSI Controller Tx Board IP modules Carrier cPCI Bus RS232 service port Electrical to Optical Optical protocol management Diamond Correction Calculation CPU Optical Controls rack Correctors PCs rack Power Converters ALBA FOFB Overview Provided by OCEM company (was in bankrupt but I heard they’re back) Provide ±1mrad of DC deflection and 100Hz 1kHz Bandwidth / 18 bits Resolution

f H =235 Hz f V =1550 Hz Horizontal Steering Vertical Steering Correctors Magnets ALBA FOFB Overview ALBA sextupoles have extra wiring to provide H/V beam steering Eddy currents on the vacuum chamber reduce the effect of the magnetic field at high frequencies To have a more effective penetration field chamber thickness reduction to 2mm in the correctors

Integration of xBPM Control of RF frequency No Slow Orbit Feedback ALBA FOFB Overview Integration of the photon monitor (xBPM) of MISTRAL beamline is already implemented in the SOFB Libera Photon + Communication Controller to be used External process that will monitor dispersive pattern on correctors and change RF frequency No possibility to set correctors AC and DC by FOFB Handling of Interruptions / ACK does not allow FOFB to readback the correctors setting. FOFB just assumes that setpoint is OK

First Results (before Easter shutdown) FOFB ON (ID closing) FOFB OFF (ID stopped) FOFB OFF (ID opening) 2um 5um 50sec HORIZONTAL 88 BPMs VERTICAL 88 BPMs

IDs SOURCEPOINT HORIZONTAL POSITION IDs SOURCEPOINT VERTICAL POSITION Frequency 100Hz 1kHz1Hz Frequency100Hz1kHz1Hz 10% Beamsize 1um 1nm 100nm 1um 1nm 100nm First Results (before Easter shutdown)

XALOC HORIZONTAL ANGLE XALOC VERTICAL ANGLE 10% Beam Divergence Frequency 100Hz 1kHz1Hz Frequency 100Hz 1kHz1Hz 1urad 1nrad 1urad 1nrad First Results (before Easter shutdown)

Problems of Data Transfer on cPCI And we can also have problems due to CPU interruptions … cPCI crate PMC board (sniffer) CPU 2 cPCI Bridges Brust Mode should ideally allow BPMs reading within 20us But brust is stopped after 2 cycles and restarted again Like that, reading 88 BPMs takes >100us It can only be warratied reading at 5kHz When reading 88 BPMs  1 cycle lost every 2,4 or 8 seconds 15h tests  0.007% correction cycles lost If reading 104 BPMs  0,009% If reading 120 BPMs  0,32%

Setting the PI loop Kp Ki/s + E(s)U(s) U(n) = U(n-1) + A0 * E(n) + A1 * E(n-1) A0 = (Ki * Ts /2) + Kp A1 = (Ki * Ts /2) - Kp Ts = 1/5kHz No previous experience setting PI loops It has been done experimentally Best results found for Kp =0, Ki=1000 Trim Coil that introduces noise at predefined frequencies

(No) Correction of Kickers signal FOFB OFF Kickers OFF

(No) Correction of Kickers signal FOFB ON Kickers OFF

(No) Correction of Kickers signal FOFB ON Kickers ON 3Hz injection rate

(No) Correction of Kickers signal Kickers Pulse FOFB effect FOFB ON Kickers ON

(No) Correction of Kickers signal 10% H-Beamsize HORIZONTAL Frequency 100Hz 1kHz1Hz 1um 100nm 10nm

(No) Correction of Kickers signal 10% V-Beamsize VERTICAL Frequency 100Hz 1kHz1Hz 1um 100nm 10nm

Summary Limitation to 5kHz BPMs data due to cPCI architecture Spurious CPU interruptions Don’t really know how to proceed setting the PI loop Effect of Kicker pulses 50Hz signal 1st try was to discard position values higher than some levels  No success Dedicated filtering of 50Hz on FOFB is enough? Did anyone try to reduce it by external means? We believe we’ve to live with that Any comment / suggestion / critic is really welcomed Integration of xBPM in the loop (possible problems?) No Slow Orbit Feedback. RF control by standalone process