Page 1lOhcO 9 meeting From MDI to HMI Jesper Schou Stanford University

Slides:



Advertisements
Similar presentations
000509EISPDR_SciInvGIs.1 EIS Performance and Operations Louise Harra Mullard Space Science Laboratory University College London.
Advertisements

Page 1 of 22SPRING Meeting, Titisee, Nov 28, 2013 Dos and don'ts when developing a helioseismology instrument* Jesper Schou Max Planck Institute for Solar.
HMI Data Analysis Software Plan for Phase-D. JSOC - HMI Pipeline HMI Data Analysis Pipeline Doppler Velocity Heliographic Doppler velocity maps Tracked.
High Altitude Observatory (HAO) – National Center for Atmospheric Research (NCAR) The National Center for Atmospheric Research is operated by the University.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Science Calibration & Instrument Status TIPS 20 Nov 2003 Last COS TIPS Aug 2003.
Polarimetry Christoph Keller. Polarimetry Requirements Polarization sensitivity: amount of fractional polarization that can be detected above a (spatially.
1 Estimate on SOT light level in flight with throughput measurements in SOT sun tests T. Shimizu 1, T. Tarbell 2, Y. Suematsu 3, M. Kubo 1, K. Ichimoto.
VLBI: Visible Light Broadband Imager Instrument Conceptual Design Presentation Tom Berger Lockheed Martin Solar and Astrophysics Lab.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y Earth Atmosphere.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
The Solar Group is ~30 people working to better understand the Sun and the sources of its variability. There are several projects including one on the.
Alfvén Waves in the Solar Corona S. Tomczyk, S. Mclntosh, S. Keil, P. Judge, T. Schad, D. Seeley, J. Edmondson Science, Vol. 317, Sep., 2007.
NGAO NGS WFS design review Caltech Optical Observatories 31 st March 2010.
SDO/AIA science plan: prioritization and implementation: Five Objectives in 10 steps [session no.] HMI/AIA science teams meeting; Monterey; Feb
1.B – Solar Dynamo 1.C – Global Circulation 1.D – Irradiance Sources 1.H – Far-side Imaging 1.F – Solar Subsurface Weather 1.E – Coronal Magnetic Field.
Page 1SDO System Requirements Review/System Concept Review (SRR/SCR) – April 8-10, 2003 Lockheed Martin Space Systems Company Advanced Technology Center.
GONG SoHO 24 A new era of seismology of the Sun and solar-like stars Aix-en-Provence, France Sarbani Basu Yale Unoversity.
Investigation Overview, Scherrer, Page 1SDO Science Writers Workshop – 16 Dec 2009 HMI Investigation Overview Philip Scherrer HMI Principal Investigator.
Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
HMI01567 – Page 1HMI Sun Test Review – November 28, 2005 Sun Test Overview.
Advanced Technology Center 1 HMI Rasmus Larsen / Processing Modules Stanford University HMI Team Meeting – May 2003 Processing Module Development Rasmus.
Page 1HMI/AIA Science Meeting – February 13, 2006 HMI Instrument Overview and Calibration Status HMI/AIA Science Meeting February 13, 2006 Jesper Schou.
HMI Optics Package HMI Electronics Box The Solar Dynamics Observatory will be placed into an inclined geosynchronous orbit to maximize sunlit hours while.
Apr 17-22, NAOJ Dopplergram from Filtergram (FG) Observation Y. Katsukawa (NAOJ) SOT Team.
The Atmospheric Imaging Assembly Measuring the Sun’s Surface, Chomosphere, Transition Region, and Corona using visible and extreme Ultra- violet light.
Apr 17-22, NAOJ SOT Initial Operation in Commissioning Phase Y. Katsukawa (NAOJ) SOT team.
The Field Camera Unit Project definition, organization, planning S. Scuderi INAF – Catania.
Telescope Integration and Tests Tuesday Afternoon.
Solar Dynamics Observatory
A Search for Earth-size Planets Borucki – Page 1 Roger Hunter (Ames Research Center) & Kepler Team March 26, 2010.
NIRSpec Operations Concept Michael Regan(STScI), Jeff Valenti (STScI) Wolfram Freduling(ECF), Harald Kuntschner(ECF), Robert Fosbury (ECF)
Science - Coronal heating - Coronal structure / dynamics - Elementary processes in Magnetic Reconnection Mission instruments - Optical Telescope / Vector.
Feb 4, 20034th Solar-B Science Meeting1 SOT Scientific Observations & Operations T. Shimizu (National Astronomical Observatory of Japan)
Calibration of the Polarization Property of SOT K.Ichimoto, Y.Suematsu, T.Shimizu, Y.Katsukawa, M.Noguchi, M.Nakagiri, M.Miyashita, S.Tsuneta (National.
Henry Heetderks Space Sciences Laboratory, UCB
HMI Major Science Objectives The primary goal of the Helioseismic and Magnetic Imager (HMI) investigation is to study the origin of solar variability and.
Page 1HMI/AIA Science Meeting – February 13, 2006 HMI Instrument Status HM/AIA Science Meeting February 13, 2006 Barbara Fischer HMI Deputy Program Manager.
The High Altitude Observatory (HAO) at the National Center for Atmospheric Research (NCAR) The National Center for Atmospheric Research is sponsored by.
HMI Major Science Objectives The primary goal of the Helioseismic and Magnetic Imager (HMI) investigation is to study the origin of solar variability and.
Page 1SOHO 14/GONG 2004, July 13, 2004 The Helioseismic and Magnetic Imager Jesper Schou and the HMI Team Stanford University and other places
8:30-9:10 AM: Philip Scherrer, What Can We Hope to Learn from SDO Overview of SDO HMI Investigation HMI Instrument.
The Field Camera Unit Results from technical meeting S. Scuderi INAF – Catania.
SMART, Hida and next NAGATA, SHIN’ICHI. Solar Magnetic Activity Research Telescope (SMART) The telescope was built at the Hida Observatory Kyoto University.
Fabry-Perot Approach to SPRING Sanjay Gosain NSO.
The Processing of Observables Made by the HMI Instrument on SDO J.T. Hoeksema, J. Schou, S. Couvidat, R.S. Bogart, R.I. Bush, T.L. Duvall, Jr., Y. Liu,
Rose Navarro HMI Lead Thermal Engineer
Focal Plane Instrumentation at Big Bear Solar Observatory
Observables codes: written by Richard, Jesper, and Sebastien
HMI Status P. Scherrer.
PSP, SO, and Ground-based Synoptic Observations from NSO
COR1 Current Status and Future Plans
On-Orbit Performance and Calibration of the HMI Instrument J
ISAS Solar Physics Yohkoh (1991- ) Hionotori ( )
HMI Science Investigation Overview
The Helioseismic & Magnetic Imager on the Solar Dynamics Observatory
Current HMI Polar Fields
Image Stabilization System (ISS)
HMI Investigation Overview
Jesper Schou Instrument Scientist
Henry Heetderks Space Sciences Laboratory, UCB
The Helioseismic & Magnetic Imager on the Solar Dynamics Observatory
HMI Reliability Dale Wolfe Reliability Engineer LMSSC*ATC*LMSAL
Launch and On-orbit Checkout
Instrument Performance Requirements
LightGage™ Frequency Scanning Technology
HMI Top Level Requirements
Soothing Massage of HMI Magnetic Field Data
Optics Alan Title, HMI-LMSAL Lead,
Instrument Overview Larry Springer HMI Program Manager
106.13: A Makeover for HMI Magnetic Field Data
Presentation transcript:

Page 1lOhcO 9 meeting From MDI to HMI Jesper Schou Stanford University

Page 2lOhcO 9 meeting Outline MDI Status HMI –Overview –Observing scheme –Status –Schedule Transition

Page 3lOhcO 9 meeting MDI Status 10 year launch anniversary Dec 2! 100 million exposures Keyhole –Broken antenna –Flip every 3 months –Loose two weeks of high rate data –Difficult to get good dynamics runs Otherwise things are fine Plan to operate for 6-12 months after HMI is operational –Other SOHO instruments may be kept running after that

Page 4lOhcO 9 meeting HMI Overview The primary goal of the Helioseismic and Magnetic Imager (HMI) investigation is to study the origin of solar variability and to characterize and understand the Sun’s interior and the various components of magnetic activity. The HMI investigation is based on measurements obtained with the HMI instrument as part of the Solar Dynamics Observatory (SDO) mission. HMI makes measurements of several quantities –Doppler Velocity (13m/s rms.) –Line of sight (10G rms.) and vector magnetic field –Intensity –All variables all the time with 0.5” pixels –Most at 50s or better cadence –Variables are made from filtergrams, all of which are downlinked Higher level products will be made as part of the investigation. All data available to all. Launch in August Year nominal mission. Education and Public Outreach program included.

Page 5lOhcO 9 meeting Instrument Overview Optics Package –Telescope section –Polarization selectors – 3 rotating waveplates for redundancy –Focus blocks –Image stabilization system –5 element Lyot filter. One element tuned by rotating waveplate –2 Michelson interferometers. Tunable with 2 waveplates and 1 polarizer for redundancy –Reimaging optics and beam distribution system –Shutters –2 functionally identical CCD cameras Electronics package Cable harness

Page 6lOhcO 9 meeting Image Stabilization Mirror CCD Fold Mirror Fold Mirror ¼ Waveplate ½ Waveplates Telescope lens set Telecentric Lens Calibration lenses and Focus Blocks Front Window Filter Relay Lens Set Blocking Filter BDS Beamsplitter Narrowband Michelson Polarizer ISS Beamsplitter and Limb Tracker Assembly Tuning Waveplates Beam Control Lens Lyot Wideband Michelson CCD Shutter Assemblies Aperture Stop Instrument Overview – Optical Path Optical Characteristics: Focal Length: 495 cm Focal Ration: f/35.2 Final Image Scale: 24  m/arcsec Primary to Secondary Image Magnification: 2 Focus Adjustment Range: 16 steps of 0.4 mm Filter Characteristics: Central Wave Length: nm FeI Front Window Rejects 99% Solar Heat Load Bandwidth: nm Tunable Range: 0.05 nm Free Spectral Range: nm

Page 7lOhcO 9 meeting Instrument Overview – HMI Optics Package (HOP) OP Structure Telescope Front Window Front Door Vents Support Legs (6) Polarization Selector Focus/Calibration Wheels Active Mirror Limb B/S Alignment Mech Oven Structure Michelson Interf. Lyot Filter Shutters Connector Panel CEBs Detector Fold Mirror Focal Plane B/S Mechanical Characteristics: Box: 0.84 x 0.55 x 0.16 m Over All: 1.19 x 0.83 x 0.29 m Mass: kg First Mode: 63 Hz Y X Detector Limb Sensor Z

Page 8lOhcO 9 meeting Observing Scheme Observables –Dopplergrams –Magnetograms, vector and line of sight –Others: Intensity, line depth, etc. Observables made from filtergrams described by framelists Filtergram properties –Wavelength – selected by rotating waveplates (polarizer for redundancy only) –Polarization state – selected by rotating waveplates –Exposure time –Camera ID –Compression parameters, … –Determined by subsystem settings E.g. motor positions Framelists –Fixed list of filtergrams repeated at fixed cadence during normal operations –Entirely specified in software – highly flexible

Page 9lOhcO 9 meeting Observables Calculation Make I, Q, U, V, LCP, RCP –Linear combinations of filtergrams –Correct for flat field, exposure time and polarization leakage –Correct for solar rotation and jitter (spatial interpolation) Sun rotates by 0.3 pixels in 50s! Interpolation necessary Fast and accurate algorithm exists –Correct for acceleration effects (temporal interpolation) Nyquist criterion almost fulfilled for Doppler and LOS Nyquist is grossly violated for vector measurements in case of long framelists Significant improvement from interpolation Clever tricks exist Temporal averaging helps –Fill gaps Data loss budget gives missing data in every filtergram! Various algorithms exist May do nothing for vector field oWhat do the users prefer?

Page 10lOhcO 9 meeting Observables Calculation Average in time, if desired –Done for at least some vector field inversions Calculate observables –MDI-like and/or least squares for Doppler and LOS? –Fast and/or full inversion for vector field Many challenges remain –Calibration, code development, etc. Community input needed! –Inversion codes –Which dataproducts do you want? –Science

Page 11lOhcO 9 meeting Status – What I hoped to show First HMI Dopplergram

Page 12lOhcO 9 meeting Status – What we got

Page 13lOhcO 9 meeting Status First set of Michelsons in house Optics and filters in house –Some spares still to be delivered Several flight 4096x4096 CCD’s in house Instrument being assembled –May see first light before Christmas Mechanisms –Shutters and HCMs finished life test successfully Electronics at various stages –Significant delays expected Instrument software at various stages Ground software at various stages

Page 14lOhcO 9 meeting Status - Integration Telescope Assembly on Alignment Plate Flight Structure Heater Wiring Primary & Secondary Lens Assemblies Flight Michelsons

Page 15lOhcO 9 meeting Status - Integration ISS Mirror Assembly ISS Fold Mirror Assembly ISS Sensor AssembliesBDS Fold Mirror Assembly CCD Fold Mirror Assembly

Page 16lOhcO 9 meeting Status - Mechanisms

Page 17lOhcO 9 meeting Status - Mechanisms

Page 18lOhcO 9 meeting Schedule Late 2005: First Sun test Feb 2006: Team meeting Summer 2006: Final instrument tests Feb 2007: Instrument delivery Aug 2008: Launch Nov 2008: Begin science observations Nov 2013: End of science observations Nov 2014: End of mission Stay tuned on !

Page 19lOhcO 9 meeting MDI -> HMI Transition Basically we will get 6-12 months of overlap Any particular things we should do during that period? Anything we need to do now?

Page 20lOhcO 9 meeting Summary 4096x4096 full disk coverage 0.5” pixels Continuous coverage Doppler and LOS at 40s cadence Vector magnetograms at 40s-120s cadence Uniform quality Same observing sequence all the time August 2008 launch 5 year nominal mission Lots of new science possible Need your help!

Page 21lOhcO 9 meeting Filter profiles Continuum MDI Line profile