GROWING COMMUNITIES ON KARST THURSDAY, SEPTEMBER 13, 2007 LOCAL GOVERNMENT INITIATIVES: JEFFERSON COUNTY, WEST VIRGINIA Tony Redman

Slides:



Advertisements
Similar presentations
WATER QUALITY ANALYSIS for ANTIDEGRADATION
Advertisements

Module 2: Bioretention Area Siting and Design Andy Rowe, PE, LEED AP, QSD Cannon.
Post-construction rates and volume of stormwater runoff on-site will be equal to or less than that of pre-development rates and volume of stormwater runoff?
Proposed Land Use & Development Regulations Public Hearing Month Day, 2012.
1 Site Capacity and Natural Resource Protection Relationships in Subdivision Design.
TA Environmentally Sensitive Areas. Current Features: 1.Floodways, 100 yr 2.Floodplain, outside floodway, 100 yr 3.Jurisdictional Wetlands 4.Stream.
Cameron County Conservation District. Chapter 102 Rules and Regulations  Erosion is natural, so what’s the deal?  Accelerated Erosion is not natural.
Springs Protection Options Septic System Evaluation Program Board of County Commissioners Meeting November 13 th 2012.
Proposed Stormwater Regulations Public Forum Richland County Government September 2009.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
Runoff Processes Daene C. McKinney
Low Impact Development Overview  Alternative to end of pipe approach to SWM  Maintain hydrologic function of local ecosystem  Treat stormwater close.
Env 247 Overview of Stormwater Management March 1, 2011.
Wake County Stormwater Workshop Guidance on the New Stormwater Ordinance and Design Manual August 29, 2006.
Stormwater Infrastructure for Water Quality Management Dr. Larry A. Roesner, P.E. CE 394K.2 Surface Water Hydrology University of Texas, Austin April 8,
Jefferson High School Compton Creek Research Project UCLA and Los Angeles Waterkeeper Funded by the Environmental Protection Agency.
1 Storm Water Utility City of Durand. 2 Storm Water Runoff Rainwater flows across streets, parking lots, driveways, lawns Pollutants are picked up by.
8/29/20151 Docket Z (Easter Mountain, LLC) A Request to Rezone 556 Acres From RU-4 to SR-2 Cochise County Board of Supervisors October 25, 2011.
Hubbard Construction Company d/b/a Mid Florida Materials Request for Special Exception Request for Solid Waste Facilities Permit to operate a Class III.
Open Space Residential Development Bylaw Town of Rehoboth.
Protective Regulations Ohio Lake Erie Commission Best Local Land Use Practices January, 2007 Kirby Date, Countryside Program Coordinator.
Planning and Zoning Reform – Energy and the Environment.
Rural Residential Zoning District & Subdivision Exemptions Southampton County Board of Supervisors Presented by Jay Randolph November 28, 2005.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
VOLUME CONTROL using Inter-Event Dry Periods by Marty Wanielista, Josh Spence, and Ewoud Hulstein Stormwater Management Academy UNIVERSITY OF CENTRAL FLORIDA.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
Introduction to Storm Water Phase II Pennsylvania Department of Environmental Protection.
Community Development Department FUTURE LAND USE MAP AMENDMENT SMALL-SCALE LU-MIN & ZONING MAP AMENDMENT RZ-OTH
Annexations as a Means to Preserve Open Space October 29, 2009.
Board of County Commissioners PUBLIC HEARING January 11, 2011.
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
Board of County Commissioners PUBLIC HEARING June 8, 2010.
Horsley Witten Group, Inc. Stormwater Management and Elements of Low Impact Development Protecting Our Water Resources – An Ecological Approach to Land.
Brian Benham Virginia Tech Biological Systems Engineering Virginia Master Well Owner Network Training Wellhead Protection and Land Use Impacts on Groundwater.
WELCOME! Public Informational Meeting December 1, pm Town of New Hartford Southern Area – Urban Design Plan & GEIS Preliminary Impacts.
Cumberland Park CCB Project Virginia Department of Environmental Quality October 9, 2007.
GREEN INFRASTRUCTURE FUNCTIONAL MASTER PLAN Prince George’s County MNCPP-C Draft: December, 2004.
Jefferson County Agricultural Preservation and Land Use Plan Jefferson County’s Comprehensive Plan: Process and Strategies Presented to: Dane County Officials.
Steps to Complete Site Capacity Calculations 1. Base Site Area 2. Net Site Area 3. Density Residential = Dwelling Units Nonresidential = Impervious Surface.
Stormwater and GIS Eastern Panhandle WV GIS User Group Meeting September 2, 2015 Jennifer Klages - Sebastian Donner -
Ohio Balanced Growth Program Codes and Ordinances Workshop: Recommendations for Development and Site Layout Kirby Date, AICP, Cleveland State University.
Kitsap County Department of Public Works CRAB – November 04, 2015 Bioretention Stormwater BMP Benson Burleson Design Engineer
A Traditional vs. Ecosystem Services Approach to Surface Water Management September 16, 2010 PRESENTED BY Carol Murdock, Clackamas County WES Mark Anderson,
Community Development Department FUTURE LAND USE MAP AMENDMENT LU-MIN & RZ-OTH
Board of County Commissioners October 14, 2008 Vinzant Landing Swallet Santa Fe River.
6. Drainage basins and runoff mechanisms Drainage basins Drainage basins The vegetation factor The vegetation factor Sources of runoff Sources of runoff.
Groundwater.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
Community Development Department Neoga Lakes Future Land Use Map (FLUM) Amendment.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
G & A Lloyd, LLC ZOM Location Map. G & A Lloyd, LLC ZOM Aerial.
OPEN SPACE/ CONSERVATION
Storm Water Utility City of Durand.
Jefferson County SA Red Rocks Site Approval
Large scale development groundwater balance
“Palm Coast 145, LLC” Comprehensive Plan Amendment & Rezoning Planning and Land Development Regulation Board December 21, 2016.
Hydrosphere Notes Part 9-Land Use.
Storm Water Storage and Treatment
Palm Coast 145, LLC Comprehensive Plan Amendment & Rezoning City Council Public Hearing September 5, 2017.
PENNSYLVANIA STORMWATER BEST MANAGEMENT PRACTICES MANUAL
Sacramento County Stormwater Quality Program
Request for a Major Variance from the Neuse River Riparian Area Protection Rules    Harshavardhan Tummalpally 5201 Trinity Road Raleigh, NC January.
Regulation Amendment AM April 3, 2018.
Comprehensive Land Use Planning and Zoning
What is a rain garden? This presentation is designed to introduce the importance of rain gardens and explain how rain gardens function. Notes are included.
Groundwater.
Groundwater.
Groundwater.
Sacramento County Stormwater Quality Program
Presentation transcript:

GROWING COMMUNITIES ON KARST THURSDAY, SEPTEMBER 13, 2007 LOCAL GOVERNMENT INITIATIVES: JEFFERSON COUNTY, WEST VIRGINIA Tony Redman Director of Planning

Karst Area in Jefferson County

General Geology with Caves

Hydraulic Conductivity (feet/day)

Approximate Sinkhole Locations

Why using GW recharge estimates will do little to curb housing growth in Jefferson County  People have discretion in how much water they use and GW probably supplies less than half of the households in Jefferson.  If we assume each person uses 150 GPD, and four person housholds, and an annual GW recharge rate of 12 inches/year, then: 1 house uses 219,000 gallons/year and requires about 0.68 acres of surface area for recharge.  Jefferson County covers about 135,500 (212 square miles  (Slide courtesy of Bill Jones at Karst Conference, 2006

Management and Protection  Currently Rewriting Subdivision & Zoning Ordinances  Article 4 Environmental Protection  Division Resource Protection Standards  Division Site Capacity Calculations Residential and Non-Residential  Division Additional Resource Standards Floodplains, Riparian Buffers, & Water Bodies Woodlands Sinkholes & Sinkhole Buffers Shallow Bedrock Vulnerable Areas Wellhead Protection

Resource Protection Standards Table Resource Protection Standards Resource Open Space Ratio (AG and CS districts) Open Space Ratio (SE,SR and U districts) Open Space Ratio (GC and BP districts) Water Bodies111 Riparian Buffers Floodway111 Floodplain111 Wetlands111 Core Woodlands Mature Core Woodlands Young Mature Woodlands Young Woodlands Sinkholes111 Sinkhole Buffers Highly Vulnerable Areas Moderately Vulnerable Areas Steep Slopes greater than 25% Steep Slopes 15-25% Bald Eagle Nests111 Historic Sites Category I Historic Sites Category II Historic Sites Category II Wellhead Protection Areas

Site Capacity Requirement  Each property proposed for development shall, at the time of preliminary and final land development plan approval or subdivision, submit a site capacity analysis based on the site's physical conditions, hazards, and natural resources. A preliminary site capacity calculation shall be presented at the time of a proposed rezoning for both the present zoning and the proposed rezoning.

Residential Use District Standards Table 3.201A Residential Use District Standards District and Development Type Average lot size Min. OSR Density Required Utilities Minimum Site Area Max. GrossMax. Net Agriculture (AG) Farmstead 40 ac on site40 ac. Equestrian 5 ac on site35 ac. Cluster 1 ac on site18 ac. Planned 15,000 sf community80 ac. Hamlet 6,000 sf community250 ac. Hamlet transit access 4,800 sf avg community250 ac. Countryside (CS) Farmstead 40 ac on site40 ac. Single-family 5 ac on site5 ac. Equestrian 3 ac on site20 ac. Cluster 1 ac on site20 ac. Planned 20,000 sf community60 ac. Hamlet 6,000 sf community200 ac. Hamlet transit access 4,800 sf avg community200 ac. Suburban Estate (SE) Single-Family 2 ac on site2 ac. Cluster 20,000 sf public6 ac. Planned 15,000 sf public20 ac.

Site Capacity Calculations  Site Capacity Calculation utilizes an 8 step process to ascertain density adjustments based upon the preservation of resources (See Handout).

Sinkholes  The protection of sinkholes is intended to protect the County's groundwater from pollution. The protection takes two forms: preserving the sinkhole as open space and preventing stormwater from being directed to the sinkhole area. The following standards shall apply:

Sinkhole  Sinkhole. The area shall be preserved as open space since any disturbance can result in increasing the rate and quality of water reaching the aquifer. Some areas of sinkholes have been plugged by natural processes and a limited amount of construction could occur (see Mitigation below).  Stormwater. Stormwater should be diverted away or around any sinkhole. If large-scale topography (depressions larger than the sinkhole buffer) prevents this, then all stormwater shall be treated in a wet detention basin or similar and all flows moved through grasses, swales, or constructed wetlands to provide maximum cleaning. If forested, all flows should be overland sheet flow through the forest.  Historic Sinkholes. Historic Sinkholes and their buffers may be permitted to be mitigated.  Mitigation. In no event shall open sinkholes be mitigated. Mitigation shall be permitted only after a geotechnical study indicates that:  The sinkhole or group of sinkholes is fully plugged, meeting the standards of historic sinkhole. The geotechnical study shall prove that the sinkhole has been plugged for a substantial time so that plugging material is compacted and stable and a layer of surface soil to a depth of one foot has been established over the area of the sinkhole and any depression associated with it that slows infiltration.  The geotechnical study shall demonstrate that the proposed development in the sinkhole is not going to lead to increased rates of recharge in both quantity and quality.  Stormwater management shall be such that increased runoff due to buildings, roads, or other impervious surfaces are diverted out of the sinkhole and discharged to stream basins.  In no event shall mitigation result in an increase in the permitted development of the property over that of Division 4.300, Site Capacity Calculations.

Sinkhole Buffer  The protection of sinkholes is intended to protect the County's groundwater from pollution, and the sinkhole buffer furthers that objective. The protection takes two forms: locating development in the best manner to prevent stormwater from being directed to the sinkhole area and managing stormwater. The following standards shall apply:

Sinkhole Buffer  Location. The permitted development in the buffer shall be located as far as possible from the sinkhole in a location where stormwater can most efficiently be drained away from the sinkhole. If draining away is not feasible, then the location should be chosen to optimize the effectiveness of the stormwater management systems.  Open Sinkholes. If the sinkhole is open, then the buffer shall be kept at an open space ratio of The density of the site capacity calculation is not changed, but the development must be outside the buffer.  Stormwater Management. That portion of the buffer draining to the sinkhole shall be either left undisturbed and in natural vegetation or the stormwater diverted away from the sinkhole. If that is not possible, stormwater shall meet the requirement that there be no change in quantity or quality of water discharged towards the sinkhole from what it would be in a wooded condition.  Mitigation. Mitigation is prohibited unless the sinkhole is classed as an historic sinkhole by the geotechnical study in Section N D, Mitigation. If the buffer is of an historic sinkhole, the site capacity calculation shall eliminate the area of the sinkhole buffer from the calculation.

Vulnerable Areas  Vulnerable areas are defined as being highly vulnerable or moderately vulnerable. The combination of surface and subsurface conditions makes these areas vulnerable to groundwater pollution or contamination. These areas have been mapped at a large scale in the County, but actual on-site conditions may be more variable.

Vulnerable Areas  Highly Vulnerable Areas. All development in highly vulnerable areas shall require a geotechnical study to determine if there are sinkholes that are not visible on the surface or bedrock conditions that need to be specifically avoided or protected. The study shall recommend corrective and mitigation techniques to be applied to pre-identified problem areas and to areas discovered during the construction process.sinkholes  Moderately Vulnerable Areas. All developments in moderately vulnerable areas shall require a preliminary geotechnical study to determine if there are areas of the site that are not moderately vulnerable or highly vulnerable.  Geotechnical Study. The geotechnical study shall determine the relative vulnerability of different portions the site. It may also be used confirm or refute the existence of elements that lead to the designation as a highly vulnerable area or moderately vulnerable area. The geotechnical study shall: highly vulnerable area  Identify the presence of sinkholes or filled sinkholes.  Determine the relative vulnerability of different portions of the site as very highly vulnerable, highly vulnerable, or moderately vulnerable.  Identify areas best suited to development and most in need of protection.  Propose a geotechnical protection plan covering mitigation of existing problem areas and response to conditions that occur during construction.  Propose a stormwater management and facilities plan that will meet the requirements of G below.  Open Space. Areas that are particularly vulnerable on the site shall be placed in the required open space as determined by the site capacity calculation (see Division 4.300).  Open Connections. All open connections to the groundwater shall be sealed or filled.

Questions and Discussion