1 WBS 1 Design Analysis Status NCSX Analysis Meeting Dec 3, 2003.

Slides:



Advertisements
Similar presentations
Status of M50 Modular Coils Winding form models based on m50_256.z01 have been posted in Pro/INTRALINK Working on tee/clamps, wings, port openings, poloidal.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Summary of Twisted Racetrack / Clamp Analysis K. D. Freudenberg.
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
AT Pilot Plant EM and Structural Studies P. Titus.
NCSX Vacuum Vessel Overview Paul Goranson WBS 12 Manager Vacuum Vessel Manufacturing Study Kickoff meeting April 29, 2003.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
Tracker Solenoid Module Design Update Steve VirostekStephanie Yang Mike GreenWing Lau Lawrence Berkeley National LabOxford Physics MICE Collaboration Meeting.
Status of the Power Core Configuration Based on Modular Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
Status of the Coil Structure Design and Magnetic-Structural Analysis Presented by X.R. Wang Contributors: UCSD: S. Malang, A.R. Raffray PPPL: H.M. Fan.
Status of Coil Structural Design and Magnetic-Structural Analysis Presented by X.R. Wang Contributors: ORNL: D. Williamson UCSD: S. Malang, A.R. Raffray.
NCSX NCSX Planar Coil "ASIPP" Presentation 1 December 8-10, 2005 Michael Kalish NCSX TF and PF Coils.
SC Project Review of NCSX, April 8-10, 2008 NSCX Poloidal Field Coils Michael Kalish.
Cavity support scheme options Thomas Jones 25/06/15.
1 Dimensional Control for the National Compact Stellarator Experiment R. Ellis, A. Brooks, T. Brown, W. Reiersen, S. Raftopoulos, B. Stratton Presented.
ARIES AT Project Meeting - Princeton, NJ 18 Sept 00 1 ARIES-AT Toroidal Field (TF) and Poloidal Field (PF) Coils Tom Brown, Fred Dahlgren, Phil Heitzenroeder.
2-d Insulation Analysis of Clamp / Vacuum Vessel Insulation crushing
Defining the Vacuum Vessel Geometry NCSX Project Meeting November 27, 2002 Art Brooks.
Presented by Brad Nelson Tom Brown, Mike Cole, Paul Fogarty, Paul Goranson, Phil Heitzenroeder, Wayne Reiersen, Dave Williamson, and others NCSX PAC Meeting.
Modular Coil Assembly Bolted Joint PDR 2/22/07. Objectives The review objectives include... Define the location of additional inboard bolts Finalize the.
J.H. ChrzanowskiMod Coil R&D Update1 Modular Coil R&D Update April 9, 2003 James H. Chrzanowski.
SC Project Review of NCSX, April 8-10, 2008 NCSX Coil Services P.L. Goranson Work Package 161.
NCSX A. Brooks, P. Fogarty, G. Lovett, D. Williamson June 3, 2005 Modular Coil Type-C Final Design Review – Part II.
Metrology Milestones Metrology Task Force –Vacuum vessel manufacture - P. Goranson –Mod. Coil Form manufacture - D. Williamson –Mod. Coil winding- S. Raftopoulos.
In-Vessel Coil System Conceptual Design Review – September, Vertical Stability Coil Structural Analyses P. Titus, July
NCSX NCSX TF Coil Procurement 1 February 3, 2006 Michael Kalish NCSX TF Coil Procurement.
NCSX Modular Coil Joint Load/Stress Calculation By Leonard Myatt Myatt Consulting, Inc.
Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004.
May 19-20, 2004NCSX FDRLeonard Myatt 1 Linear Structural Analysis of the NCSX Modular Coil & Shell Leonard Myatt NCSX Final Design Review May 19-20, 2004.
ITER In-Vessel Coils (IVC) Interim Design Review Thermal Structural FEA of Feeders A Brooks July 27, 2010 July 26-28, 20101ITER_D_353BL2.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
Nonlinear Analyses of Modular Coils and Shell structure for Cooldown and Modular Coil EM Loads Part 2 – Results of Clamp Assembly, Wing Bags, Poloidal.
Results of Linear Stress Analyses for Modular Coils and Coil structure For 2T High Beta Currents at 0 Seconds and Initial Coil Shrinkage of in/in.
An Analysis of Shell Structure for Dead Load H.M. Fan PPPL September 16, 2005.
Purpose and Goals of the NCSX Conference Call on Modular Coil Analyses February 25, 2004 ??
NCSX David Johnson August 18, 2004 Discussion of Co-Wound Flux Loops.
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
F. Dahlgren -SC Project Review of NCSX, April 8-10, 2008 PF, TF, & Trim Coil Supports (WBS-15) Core Base Support Structure (WBS-17) F. Dahlgren NCSX Coil.
Evaluation of Modular Coil Cooldown Time with Thicker Insulation and Comparison of Original and Proposed Insulation Design H.M. Fan PPPL January 15, 2003.
Evaluation of Modular Coil Cooldown Time with Thicker Insulation and Comparison of Original and Proposed Insulation Design H.M. Fan PPPL January 14, 2003.
NCSX B. Nelson for the NCSX Engineering Team NCSX modular coil cooling workshop June 10-11, 2004 PPPL NCSX Modular Coil Cooling Requirements and Initial.
56 MHz SRF Cavity and Helium vessel Design
NCSX NCSX Project Meeting Wayne Reiersen 15 December 2004.
Twisted Racetrack Analysis Update
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
SC Project Review of NCSX, April 8-10, 2008 NCSX Machine Assembly E. D. Perry.
1 Modular Coil Winding Keystoning Issues NCSX Technical Meeting May 29, 2003 What is the current baseline winding? What is the problem? What are the variables.
NCSX P. Fogarty, K. Freudenberg, T. Hargrove, G. Lovett, B. Nelson, P. Goranson, D. Williamson October 15, 2004 Twisted Racetrack Coil Final Design Review.
1 Stellarator Core Metrology issues NCSX WBS-1 Meeting April 2, 2003 What are we measuring? When? How do we take the measurements? How do we correlate.
NCSX VACUUM VESSEL PL Goranson Final Design Review November 17, 2005 Man Access Port /Lateral Supports NCSX.
Nonlinear Analyses of Modular Coils and Shell structure for Coil Cool-down and EM Loads Part 1 – Results of Shell Structure and Modular Coils H.M. Fan.
1 PFC requirements  Basic requirements  Carbon based  Provisions for adding (interface design included in research prep budget)  NBI armor  Trim coil.
AWB NSTX TF Flag Joint Design Review April 10, 2003 Art Brooks.
A View of NCSX Structural System and Load Path for the Base Support Structure.
NCSX 21 March 2003 Reiersen - 1 PDR Preparations Wayne Reiersen NCSX Engineering Meeting 21 March 2003.
Twisted Racetrack Revisited Model Changes: Side A has 10 turns Clamps have been modified to as built geometry. Property Changes (linear results.
NCSX Stellarator Core Pre-conceptual Design Progress and Status Mike Cole, Paul Goranson, Brad Nelson, Dave Williamson NCSX PAC Meeting PPPL June 3-4,
SEPT 20, 2006 T. Brown, M. Cole, P. Fogarty, P. Goranson, K. Freudenberg, D. Williamson NCSX STAGE 2 COIL TO COIL ASSY.
NSTX Supported by NSTX Centerstack Upgrade Project Meeting P. Titus March F.
NCSX VVSA / MCWF FDR A Systems Engineering Perspective Wayne Reiersen Bob Simmons NCSX VVSA / MCWF FDR May 19-20, 2004 PPPL.
1 First wall mods status NCSX SIT Meeting July 1, 2002 Points at 0, 30, 60 degrees from Art Points x in cross sections RF launchers bigger issue.
Stellarator Core Machine Configuration NCSX Project Meeting Dec 19-20, 2000 B. Nelson, M. Cole, P. Fogarty P. Goranson, G. Jones, D. Williamson O AK R.
1 WBS 1 Preparation for FDRs NCSX WBS 1 Engineering Meeting March 17, 2003 What establishes the plan? What are near term deliverables? How will we status.
1 First wall mods status NCSX SIT Meeting Aug 12, 2002 Points at 0, 30, 60 degrees from Art Points x and 1.00 in cross sections First try at vessel.
1 CD-2 ECP Preparations What is Needed. 2 Background As part of the CD-2 process, we need to establish a fully supported and documented cost and schedule.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
PEER Review of Coil Tolerances and Trim Coil Requirements plus Magnetic Material in Test Cell April 19, 2004 Art Brooks.
CONCEPTUAL DESIGN OF D2 MECHANICAL STRUCTURE S. Farinon, P. Fabbricatore (INFN-Sezione di Genova) Sept. 17 th 2014.
Update on PANDA solenoid design
Fredrik Fors Mechanical Engineering, JLab 09/29/2016
Presentation transcript:

1 WBS 1 Design Analysis Status NCSX Analysis Meeting Dec 3, 2003

2 PFCs Analysis typeWho/howStatus Thermal analysis of limitersGoranson, spreadsheet calc.Needs doc. Thermal analysis of PFC liner, including radiation shields/ heat leak to vessel, connections to tubing, etc. Goranson, spreadsheet calc.Needs doc. Mechanical analysis of PFC liner HardwareGoranson, spreadsheet calc.Needs doc. Disruption loadsDahlgren, Brooks, SPARK and Nastran analyses Completed for CDR geometry, ok for PDR

3 Vacuum Vessel Analysis typeWho/howStatus Thermal-hydraulic analysis of vessel and cooling lines Goranson, spreadsheet calc. Dahlgren check Needs doc. Analysis of thermal insulation thickness, heat leak to coils Goranson, spreadsheet calc. Dahlgren check Needs doc. Disruption loadsBrooks, SPARK analysis Strickler check Model exists, needs update Eddy currents during startup, error fieldBrooksNeeds doc. Structural analysis of vessel gravity loads, during / after assemblyFreudenberg, Mechanica FEA Dahlgren check Needs doc. Disruption loads, vacuum loadsDahlgren, NASTRAN FEA, static (may do modal analysis) Freudenberg check – static calc Model done BucklingDahlgren, NASTRAN FEA, static Check? Model done Dynamic/seismicDahlgren, NASTRAN FEA Freudenberg check – static calc. Not needed for PDR Analysis of vessel supports, thermal and mechanical Freudenberg – FEA Goranson check via spreadsheet calc. Welding distortionanalysis TBD R&D results to confirm

4 Conventional Coils Analysis typeWho/howStatus Thermal-hydraulic analysis of TF, PF and External trim coils Dahlgren Fcool codeNot updated from CDR EM loadsHM Fan – ANSYS Strickler / Williamson - MAGFOR Complete Field error analysis from imperfections, leads, etc. Brooks – SPARKNeeds doc. Structural analysis of coils TF coils – incl wedging C. Jun / TBD PF coils C. Jun / TBD External Trim coils C. Jun / TBD

5 Modular Coils Analysis typeWho/howStatus Thermal analysis of mod coils LN2 hydraulic analysisDahlgren Goranson – spreadsheet calc Needs update from CDR Cooldown analysis, between shotsFreudenberg - ANSYS HM Fan check Needs doc. Cooldown analysis, RT to LN2Goranson – spreadsheet calc Dahlgren check Update from CDR EM loadsHM Fan – ANSYS FEA Strickler / Williamson - MAGFOR Complete 90% complete Eddy currents in mod coil structureBrooks – SPARK Strickler – Eddycuff to check Needs doc. Field error analysis from imperfections, leads, etc. Brooks – SPARK Strickler – Eddycuff to check Needs doc. Stress analysis of mod coils Global shell analysisHM Fan – ANSYS FEA S Chae – ABAQUS FEA – to check Model built Local winding analysisFreudenberg – Mechanica FEA Chae – ABAQUS FEA – to check Racetrack coils with clamps done, M2, M3 done Clamp analysis – detailed analysis of highly loaded clamps Freudenberg – Mechanica FEAMany clamps analyzed

6 Modular Coils Additional AnalysisWho/howStatus Check loading of Mechanica model against loading of ANSYS model Kevin does Mechanica model HM or Len does ANSYS model Geometric non-linear model of composite conductor to see if we can predict properties and non-linear stiffness behavior as well as internal thermal stresses during pulse Additional R&DWho/howStatus Mechanical fatigue test of composite conductor – S/N curve Irv Coupled thermal/mechanical fatigue test of composite conductor – S/N curve PPPL to wind and pot coil(s) ORNL – Tsai developing test stand New properties of composite conductor with 4-in-hand config. Irv

7 Modular Coil Structural Shell Model #1 Objective: Determine primary stress/deflection in a 120-deg model due to EM, thermal loads Evaluate stress in shell, tee, winding pack assuming full bonded interface Determine behavior of wing regions with/without joining to adjacent shell Calculate reaction force at flange bolt locations Status: Shell is fully meshed, tee and wing geom to be added Loads for s are available 326 volumes including shells and insulations

8 Modular Coil Structural Shell Model #2 Objective: Plate element approach, can be developed quickly Confirm primary stress/deflection results from Model #1 Evaluate shell thickness, port opening variations if needed Status: FE model being considered as ProE shell geometry is developed, however no one is working on the model directly. Method of applying ANSYS EM analysis results has been developed in case MAGFOR results are not available.

9 Support Structure Analysis typeWho/howStatus Thermal analysis of structure Cooldown from RT to LN2 Eddy currents in coil structureBrooks – SPARK / handNeeds doc. Stress analysis Global analysis Chang – TBD Local brackets / flange analysis Chang - TBD

10 Cryostat and Base Analysis typeWho/howStatus Thermal analysis of cryostat – heat leak, cooldown, etc. Gettlefinger Stress analysis of cryostat – internal pressure, temperature gradients, etc. Gettlefinger Thermal analysis of base – heat leak, cooldown, etc. Gettlefinger Stress analysis of baseKalish / TBD During assembly During cooldown to LN2 During operation Seismic analysis

11 Field period assembly Analysis typeWho/howStatus Fit1 – Do the coils slide over the vacuum vessel? Brooks / Brown - trajectory checked with Pro-E model Needs doc and check with tooling Fit2 – Can vessel be retracted for welding of field joint? (to accommodate distortion / shrinkage of weld) Cole – Pro-E models Line of sight studies to targetsCole – Pro-E models Fixture stress analysesTBD