ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.

Slides:



Advertisements
Similar presentations
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
Advertisements

NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
Rate Plan. Value Story When asked, our customers identify the following topics as ways MidAmerican Energy provides value – Emergency Response.
2013 Summer Overview Jeffrey S McDonald Power System Operator CUEA San Diego, CA June 6, 2013.
Preliminary Review of July 24 th Extreme Temperature Event & Implications for Pilot Capacity Standard Mary Johannis & Wally Gibson PNW Resource Adequacy.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
Tucson Area Reliability Mike Flores Control Area Operations Tucson Electric Power May 2000.
1 R : LTPP Track II Workshop – Operating Flexibility Modeling Results Patrick Young Analyst, Generation & Transmission Planning California Public.
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. COLD SNAP Overview of Proposed Options for Winter 2004/2005.
North American Energy Standards Board (NAESB) Electric and Gas Industry Coordination in New England: Cold Weather Conditions Houston, Texas February 9,
Utility Regulation March 10, 2011 Raj Addepalli Deputy Director, Electric, Office of Electric,Gas and Water New York State Department of Public Service.
2001 & 2002 Energy Preparedness Tucson Electric Power February 16, 2001 Michael Flores, Manager Control Area Operations David Hutchens, Manager Wholesale.
California Energy Commission Workshop Nuclear Power Plant Issues
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
1 Enhancing the Role of Renewable Energy in California Robert A. Laurie Commissioner California Energy Commission Geothermal Resources Council Annual Meeting.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Electric Generation Reliability Remarks Before the Pennsylvania Public Utility Commission 2011 Summer Reliability Assessment Meeting June.
SDG&E Summer Preparedness July 2012 Update © 2012 San Diego Gas & Electric Company. All copyright and trademark rights reserved. 1.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
Peak RCCo Performance Metrics Draft –November 2013.
FERC Assessment of Demand Response & Advanced Metering 2006 APPA Business & Financial Conference September 18, 2006 – Session 11 (PMA) Presented by: Larry.
ETAAC Energy Sector Energy Storage Smart Grid July 12, 2007 San Francisco, CA.
WestConnect Activities Charles Reinhold WestConnect Project Manager 2008 ACC BTA Workshop Phoenix, AZ May 22, 2008.
FERC’s Role in Demand Response David Kathan ABA Teleconference December 14, 2005.
Powering Alberta AESO Annual General Meeting May 14, 2009 Reliable Power Reliable Markets Reliable People.
Joe Polidoro, Sr. Engineer PJM Interconnection, LLC Grid of the Future: Integrating Load Response into the Markets.
Overview of WECC and Regulatory Structure
Texas Wind Energy American Meteorological Society Summer Community Meeting – Norman Oklahoma Henry Durrwachter, P.E. August 12, 2009.
CALIFORNIA ENERGY COMMISSION Status Report Demand Responsive Building Program William J. Keese California Energy Commission March 30, 2001.
Summer 2004 and Beyond Lon W. House, Ph.D ACWA/Edison Joint Presentation June 24, 2004.
Navigating the Challenges Nancy Saracino Vice President, General Counsel & Chief Administrative Officer California Independent System Operator Independent.
California Energy Commission Renewable Energy Transmission Initiative (RETI) Part I Jeffrey D. Byron California Energy Commission Energy Action Plan (EAP)
Presentation to House Regulated Industries Committee Chairman Phil King Trip Doggett Chief Operating Officer The Electric Reliability Council of Texas.
©2004 PJMwww.pjm.com 1 PJM's Perspective on Reliability – Summer 2004 and Beyond Karl Pfirrmann President -- PJM Western Region FERC Summer Reliability.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
Managing Reliability and the Markets with PI
CALIFORNIA ENERGY COMMISSION Electricity Supply Adequacy in the West Daniel Nix Deputy Director California Energy Commission April 2000 Committee on Regional.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
DR issues in California discussed last year in March Historical DR in California: some background issues –Twenty years of programs/tariffs I/C and AC cycling.
FERC Staff’s Report on Demand Response and Advanced Metering.
Monterey Plaza Hotel October 8-10, 2007
CALIFORNIA ENERGY COMMISSION Outlook for California’s Electricity Supply and Land Use Implications BLM National Lands Conference David Maul Chris Tooker.
An Overview of Demand Response in California July 2011.
CALIFORNIA ENERGY COMMISSION Workshop on the Staff Draft 2006 Summer Outlook Report December 8, 2005 Hearing Room B.
CALIFORNIA ENERGY COMMISSION Electricity Supply Adequacy in the West William J. Keese Chairman, California Energy Commission January 25, 2000 for the Harvard.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
ISO Confidential Overview of California’s Current Drought and its Effects on the Energy System Dede Subakti, P. E. Director, Operations Engineering Services.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
Regional Transmission Expansion Project Staff Council Briefing Tom Kaiserski (MT) Program Manager February 15, 2011 Governor’s Office of Economic Development.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
California Senate Energy, Utilities and Communications Committee Oversight Hearing May 10, 2016 Southern California Edison Colin Cushnie Vice President,
California Independent System Operator 1 Department of Market Analysis California Independent System Operator California ISO Creation Time: July,
Wind Management at MISO
Mike Jaske California Energy Commission
Western Electricity Coordinating Council
Solar Eclipse Overview August 2017
December 9, 2005 Allison DiGrande, External Affairs Department, ISO/NE
New England Resource Adequacy
Forecasting and Operations CAISO Case
Jim Mcintosh Director, Executive Operations Advisor California ISO
Presentation transcript:

ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations

RRC/OE&M22/16/05 OVERVIEW ISO: Who we are, functions Summer 2004 Conditions ISO Focus and Activities, 2005 ISO Procedures for Balancing Loads and Resources Conclusion

RRC/OE&M32/16/05 California ISO  501c(3) nonprofit corp., created by state statue & regulated by FERC  5 member board appointed by the Governor and confirmed by Senate  One of 3 Western Electricity Coordinating Council Reliability Coordinators (WECC) in the West Functions:  Operate the High Voltage Grid for 75% of California in a safe and reliable manner  Created to provide open & nondiscriminatory access to transmission grid  Maintain grid reliability by matching supply & demand in real time & meet WECC mandated power reserves  Recommend appropriate grid upgrades  Schedule & coordinate power plant & transmission lines coming out of service for maintenance

RRC/OE&M42/16/05 California ISO—Other Functions Prepare annual grid plans w/10-year outlook on ISO controlled grid ISO does not acquire long-term resources; we direct transmission and adjust flow of power in real time for balancing purposes Supports Intermittent Resource Program accommodate wind and solar power into our ancillary services markets (serves as national model according to wind industry)

RRC/OE&M52/16/05 Record Loads Summer 2004  7 record setting days in 2004:  July 1944,042 MW  July 2044,330 MW  July 2144,360 MW  August 1044,497 MW  August 1144,872 MW  September 745,165 MW  September 845,597 MW  We hit loads in 2004 that were not forecasted until 2005 and the State did not have exceptionally high temperatures!  The previous record peak demand of 43,609 MW, set July 1999, stood for four years. (SMUD load subtracted from this total)

RRC/OE&M62/16/05 Summer 2004  In spite of moderate temperatures, CAISO set a new system peak of 45,597 MW on September 8,  At the time of system peak, reserves were not distributed throughout the system.  Joint Energy Action Forum (JEAF) has developed estimated load and resource picture for  JEAF includes: CAISO, CEC, CPUC, Governor’s Office.  JEAF is looking at expedited solutions to help address the Summer 2005 problem.

RRC/OE&M72/16/05 ISO Focus ISO continually monitors system conditions and prepares actions: –Operational Forecast of Loads and Resources –Transmission Upgrades –Demand Response –Emergency Procedures –Communication

RRC/OE&M82/16/05 Load and Resource Forecasts ISO Seasonal Operational Assessment –ISO Summer 2005 Operational Assessment presently in development; to be published 3/31/05. –Builds from CEC’s Planning Assessment, fine tunes assumptions for: load growth, changes in Control Area definition (WAPA/SMUD), economic factors, updates in generation/transmission. –considers potential adverse conditions. Generation Assumptions: –Retirements refined based on “Request For Offer” outcomes, air emissions, and unit age. –Additions refined based on “Request For Offer” contract outcomes, construction progress.

RRC/OE&M92/16/05 Transmission Upgrades Key Southern California Paths for 2005 include “Path 26”, “South of Lugo”, “Miguel”. ISO monitors and supports construction progress on transmission upgrades. Complete operational studies, determine new Path ratings.

RRC/OE&M102/16/05 Emergency Preparedness Promote Demand Response –Voluntary Load Reduction Programs –Encourage Energy Conservation, “Power Watch” –Promote “Alerts-Warnings-Emergency” education and drills, both internally and externally Operator Emergency Preparedness –Update Procedures –Provide operator analysis tools –Conduct training, drills

RRC/OE&M112/16/05 Issue Stage Two news release Invoke UDC Interruptible Load Programs Issue Stage Three news release Issue Notice of Load Interruptions Instruct utilities to implement rotating outages Stages of Electrical Emergencies* Generating reserves less than requirements (Continuously recalculated. Between 6% & 7%) Issue Stage One news release calling for conservation Coordinate with public safety agencies Generating reserves less than 5% Generating reserves less than largest contingency (Continuously recalculated. Between 1.5% & 3%) Generating Reserves 7% 6% 5% 4% 3% 2% 1% 0% Stage One Emergency Stage One Emergency Stage Two Emergency Stage Two Emergency Stage Three Emergency Stage Three Emergency *Many emergencies are due to operating reserve levels, however, some emergencies are declared as a result of transmission line losses or limitations. VLRP Triggered VLRP Triggered Voluntary commercial customers reduce electricity use. Provides advance notice to businesses that power reserves are low and that business operations could be affected. Voluntary Load Reduction Program Log into for the California ISO’s latest emergency information Electrical Emergency Communications and Voluntary Load Reduction Program

RRC/OE&M122/16/05 ISO Procedures for Balancing Loads and Resources ISO Coordinates proposed outages of major generation and transmission facilities up to 15 months in advance. The industry must submit reasonable, accurate, and balanced schedules for Loads and Resources. In Day-Ahead timeframe, ISO compares schedules with ISO forecast. In Real-Time, ISO monitors and balances Load and Resources every 5 minutes. ISO seeks to fill any anticipated shortfall with supplemental (Spot market) energy. If reserves diminish in Real-Time, seek to reduce demand through alerts, warnings, emergencies. (Voluntary load reduction to rotating outages).

RRC/OE&M132/16/05 Conclusion Moderate amount of risk associated with Summer 2005 operation of the Grid. ISO focused in monitoring system conditions, emergency preparedness, and communication. Problems expected to worsen in 2006; those mitigation efforts should begin now.