An example application in GIS Modeling Presentation and hands-on exercise materials prepared by Joseph K. Berry Keck Scholar in Geosciences, University.

Slides:



Advertisements
Similar presentations
Analysis grid superimposed 2D Street Grid Calculating Travel-Time …vector to raster conversion Note that a 100 row by 100 column analysis grid (10,000.
Advertisements

Spatial Analysis with ArcView: 2-D. –Calculating viewshed –Calculating line of sight –Add x and y coordinates –Deriving slope from surface data –Deriving.
How Do Rivers Change the Land?
Grid-based Map Analysis Techniques and Modeling Workshop Part 1 – Maps as Data Part 2– Surface Modeling Part 3 – Spatial Data Mining Part 4 – Spatial.
Introductory Workshop on Grid-based Map Analysis Techniques and Modeling Presentation by Joseph K. Berry Joseph K. Berry W.M. Keck Scholar in Geosciences,
Grid-based Map Analysis Techniques and Modeling Workshop Part 1 – Maps as Data Part 2– Surface Modeling Part 3 – Spatial Data Mining Part 4 – Spatial.
By Joseph K. Berry W. M. Keck Scholar, University of Denver – August, An Overview of GIS-based Corridor.
Vehicle Routing & Scheduling Multiple Routes Construction Heuristics –Sweep –Nearest Neighbor, Nearest Insertion, Savings –Cluster Methods Improvement.
What is a contour map and how do I read it??
WUP: TOC = “Objective – Day 3”
Lecture 23 (mini-lecture): A Brief Introduction to Network Analysis Parts of the Network Analysis section of this lecture were borrowed from a UC Berkeley.
Grid-based GIS Modeling Nigel Trodd Modified from Berry JK, GIS Modeling, presented at Grid-based Map Analysis Techniques and Modeling Workshop,
Joseph K. Berry CSU Alumnus, MS in Business Management ’72 and PhD emphasizing Remote Sensing ‘76 W.M. Keck Scholar in Geosciences, University of Denver.
Reading and Interpreting Topographic Maps
GIS Modeling (Berry) GIS Modeling logically sequences map analysis operations (Spatial Analysis, Surface Modeling and Spatial Data Mining) to solve spatial.
M Joseph Dept. of Science Colyton High School
GIS at the Crossroads From Where is What and Wow, to Why and So What Berry & Associates // Spatial Information Systems 2000 South College Ave, Suite 300,
Map Analysis Procedures and Applications in GIS Modeling Topic 19, Routing and Optimal Paths Online book written by Joseph K. Berry www/innovativegis.com/Basis/MapAnalysis/
Introduction to GIS Modeling Week 6 — GIS Modeling Procedures GEOG 3110 –University of Denver Presented by Joseph K. Berry W. M. Keck Scholar, Department.
Joseph K. Berry, MGUG 2014 Opening
Spatial Data Mining Practical Approaches for Analyzing Relationships Within and Among Maps Berry & Associates // Spatial Information Systems 2000 S. College.
ConcepTest Section 12.3 Question 1 Figure 12.1 shows contours of a function. You stand on the graph of the function at the point (-1, -1, 2) and start.
Chapter 2 Describing Motion Lecture PowerPoint Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
Distance. Euclidean Distance Minimum distance from a source (Value NoData) Input grid must have at least one source cell with the rest of the grid.
Introduction to GIS Modeling Week 5 — Summarizing Neighborhoods GEOG 3110 –University of Denver Presented by Joseph K. Berry W. M. Keck Scholar, Department.
SpatialSTEM: A Mathematical/Statistical Framework for Understanding and Communicating Map Analysis and Modeling Presented by Joseph K. Berry Adjunct Faculty.
GIS Technology in Transition Moving Maps to Mapped Data, Spatial Analysis and Beyond Presented by Joseph K. Berry GIS is more different than it is similar.
Presented by Joseph K. Berry Adjunct Faculty in Geosciences, Department of Geography, University of Denver Adjunct Faculty in Natural Resources, Warner.
Introduction to GIS Modeling Week 4 — Measuring Distance and Connectivity GEOG 3110 –University of Denver Simple vs. weighted distance; Proximity and.
Calculating Visual Connectivity …an animated series of slides demonstrating 2D and 3D visual connectivity from increasing viewer height (0’ to 20,000’)
Traditional Statistics Mean, StDev (Normal Curve) Mean, StDev (Normal Curve) Central Tendency Central Tendency Typical Response (scalar) Typical Response.
Introduction to GIS Modeling Week 5 — Summarizing Neighborhoods GEOG 3110 –University of Denver Presented by Joseph K. Berry W. M. Keck Scholar, Department.
MEASURING ACCESSIBILITY USING GIS MEASURING ACCESSIBILITY USING GIS Rui Pedro Julião Department of Geography and Regional Planning New University of Lisbon.
Introduction to GIS Modeling Week 6 — GIS Modeling Procedures GEOG 3110 –University of Denver Presented by Joseph K. Berry W. M. Keck Scholar, Department.
SpatialSTEM: A Mathematical/Statistical Framework for Understanding and Communicating Map Analysis and Modeling Presented by Joseph K. Berry Adjunct Faculty.
Store 111 Competition Analysis (Costa Mesa Orange County, California) Ocean 28 Miles Newport Beach Mission Viejo Santa Ana TustinTustin Analytic Tools.
An example application in GIS Modeling Presentation and hands-on exercise materials prepared by Joseph K. Berry Keck Scholar in Geosciences, University.
Channel Routing Simulate the movement of water through a channel
SpatialSTEM: A Mathematical/Statistical Framework for Understanding and Communicating Grid-based Map Analysis and Modeling Presented by Joseph K. Berry.
Special Topics in Geo-Business Data Analysis Week 2 Covering Topics 4 and 5 Spatial Analysis Analyzing Location.
An example application in GIS Modeling Presentation and hands-on exercise materials prepared by Joseph K. Berry Keck Scholar in Geosciences, University.
Environmental Modeling Basic GIS Functions for Suitability Index Modeling.
Raster Analysis and Terrain Analysis Chapter 10 & 11 Raster Analysis.
An Analytic Framework for GIS Modeling (Berry) The Analysis Frame provides consistent “parceling” needed for map analysis and extends discrete point,
SpatialSTEM: A Mathematical/Statistical Framework for Understanding and Communicating Map Analysis and Modeling Presented by Joseph K. Berry Adjunct Faculty.
Geotechnology Geotechnology – one of three “mega-technologies” for the 21 st Century Global Positioning System (Location and navigation) Remote Sensing.
L10 – Map labeling algorithms NGEN06(TEK230) – Algorithms in Geographical Information Systems L10- Map labeling algorithms by: Sadegh Jamali (source: Lecture.
Presentation by Joseph K. Berry W.M. Keck Scholar in Geosciences, University of Denver Adjunct Faculty in Natural Resources, Colorado State University.
© 2005, Joseph K. Berry—permission to copy granted Figure P-1. Spatial Analysis and Spatial Statistics are extensions of traditional ways of analyzing.
Introduction to GIS Modeling Week 4 — Measuring Distance and Connectivity GEOG 3110 –University of Denver Simple vs. weighted distance; Proximity and.
Transmission Line Siting Model (Hypothetical Example) Criteria – the transmission line route should… Goal – identify the best route for an electric transmission.
GIS Centroid Seminar – Colorado State University – April 18, 2011
DU Mini-Workshops on GIS Modeling -- Surface Modeling/Analysis
Show the Shape of the Land
Channel Routing Simulate the movement of water through a channel
DU Mini-Workshops on GIS Modeling -- Surface Modeling/Analysis
On- and Off-road Emergency Response (within 1.0 minutes)
Raster Analysis and Terrain Analysis
DU Mini-Workshops on GIS Modeling -- Surface Modeling/Analysis
Digital Elevation Model Based Watershed and Stream Network Delineation
Forest Availability and Accessibility
Calculating Travel-Time …vector to raster conversion
Digital Elevation Model Based Watershed and Stream Network Delineation
QQ: Show Work! Jonathon runs 4.0 km in 32 minutes, then 2.0 km in 22 minutes, and finally 1.0 km in 16 minutes. What is his average speed in km per.
Terrain Analysis Using Digital Elevation Models (TauDEM)
May 18, 2016 Spring 2016 Institute of Space Technology
Topography.
Workshop on GIS Modeling (Part 4)
Fluvial Hydraulics CH-3
Time from HQ = 1.0 minutes ATV Hiking Truck HQ start HQ start
Presentation transcript:

An example application in GIS Modeling Presentation and hands-on exercise materials prepared by Joseph K. Berry Keck Scholar in Geosciences, University of Denver Special Faculty in Natural Resources, Colorado State University Principal, Berry & Associates // Spatial Information Systems — Website: On- and Off-road Emergency Response One of the most important applications of geotechnology has been Enhanced 911 (E911) location technology that enables emergency services to receive the geographic position of a mobile phone, then automatically geo- coded it to a street address and identify an optimal path for emergency response. But what happens if the call comes from a backcountry location miles from a road? On/Off-Road Travel-Time = fn (roads, water and slope) …describes extend emergency response planning “beyond the lines” of a fixed road network. …for more information, see the online book Beyond Mapping III, Topic 29, Spatial Modeling in Natural Resources

Off-Road HQ (start) Emergency Response Surface …travel-time by truck from HQ along roads HQ (start) 26.5 minutes …farthest away by truck …each grid cell is calibrated by the time it takes to cross depending on the 1) type of movement and 2) the landscape conditions Roads Water Slope On- and Off-road Emergency Response (Truck) The left side of the figure below illustrates the on-road portion of a travel-time (TT) surface from headquarters along secondary backcountry roads. The grid-based solution uses friction values for each grid cell in a manner analogous to road segment vectors in network analysis. The difference being that each grid cell is calibrated for the time it takes to cross it (0.10 minute in this simplified example).

Emergency Response Surface …travel-time by truck from HQ along roads and then by ATV until too steep (>40% slope) HQ (start) Too Steep HQ (start) 52.1 minutes …farthest away by truck and ATV Slopemap …draped over Elevation surface Too Steep For ATV use ATV use Steep canyon area On- and Off-road Emergency Response (ATV) The figure below identifies the shortest combined on- and off-road ATV travel-times. Note that the emergency response solution forms a bowl-like surface with the headquarters as the lowest point and the road proximities forming “valleys” of quick access. The sides of the valleys indicate ATV off-road travel with steeper rises for areas of steeper terrain slopes; the grey areas indicate locations that are too steep for ATV travel.

HQ (start) Emergency Response Surface …travel-time by truck from HQ along roads, then by ATV until too steep and finally hiking in the steep terrain HQ (start) 96.0 minutes …farthest away by truck, ATV and hiking Response Surface …draped over Elevation surface HQ (start) Farthest (end) Optimal Path (quickest route) …accessing locations in the southern portions of the steep canyon require driving along the road, then proceeding via ATV and finally hiking nearly 45 minutes to the bottom of the canyon Steep canyon area On- and Off-road Emergency Response (Hiking) The figure below completes the total on- and off-road travel-time to all locations by adding hiking time from where the wave front of the accumulated travel-time by truck and ATV stopped. Note the very steep rise in the surface (blue tones) resulting from the slow movement in the rugged and steep slopes of the canyon area.

Emergency Response Model (Travel-Time = fn(roads, elevation, water) … 1) the response team first travels by truck along secondary roads, then Emergency Response Model Logic (Flowchart) 2) continues using all-terrain vehicles (ATV) for off-road travel until open water or steep slopes are encountered, then 3) proceeds by hiking in the rugged terrain to reach all locations Renumber Slopemap Hiking Sfriction Water Absolute Hiking Friction CalculateSpread Hiking Prox 3) Travel-time from HQ to all locations (by Truck, ATV & Hiking ) Spread ATV Prox SlopeRenumber ElevationSlopemap ATV Sfriction Renumber Water Absolute ATV Friction Calculate 2) Travel-time from HQ to all ATV accessible locations (by Truck and ATV) Base Map Derived Map Interpreted Map Modeled Map Abstraction Level: HQ Roads Renumber Truck Rfriction HQ RoadProx Spread 1) Travel-time from HQ to all road locations (by Truck)

Time from HQ = 1.0 minutes HQ start Estimated response time in minutes ATV Hiking Truck On- and Off-road Emergency Response (within 1.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking…

Time from HQ = 2.0 minutes HQ start Estimated response time in minutes ATV Hiking Truck On- and Off-road Emergency Response (within 2.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking…

Time from HQ = 3.0 minutes HQ start Estimated response time in minutes ATV Hiking Truck On- and Off-road Emergency Response (within 3.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking…

Time from HQ = 4.0 minutes HQ start Estimated response time in minutes ATV Hiking Truck On- and Off-road Emergency Response (within 4.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking…

Time from HQ = 6.0 minutes HQ start Estimated response time in minutes ATV Hiking Truck On- and Off-road Emergency Response (within 5.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking…

Time from HQ = 8.0 minutes HQ start Estimated response time in minutes ATV Hiking Truck On- and Off-road Emergency Response (within 8.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking…

Time from HQ = 10.0 minutes HQ start Estimated response time in minutes ATV Hiking Truck On- and Off-road Emergency Response (within 10.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking…

Time from HQ = 15.0 minutes HQ start Estimated response time in minutes ATV Hiking Truck On- and Off-road Emergency Response (within 15.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking…

Time from HQ = 20.0 minutes HQ start Estimated response time in minutes ATV Hiking Truck On- and Off-road Emergency Response (within 20.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking…

Time from HQ = 25.0 minutes HQ start Estimated response time in minutes ATV Hiking Truck On- and Off-road Emergency Response (within 25.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking…

Time from HQ = 30.0 minutes HQ start Estimated response time in minutes ATV Hiking Truck On- and Off-road Emergency Response (within 30.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking…

Time from HQ = 35.0 minutes HQ start Estimated response time in minutes ATV Hiking Truck On- and Off-road Emergency Response (within 35.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking…

Time from HQ = 40.0 minutes HQ start Estimated response time in minutes ATV Hiking Truck On- and Off-road Emergency Response (within 40.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking…

Time from HQ = 45.0 minutes HQ start Estimated response time in minutes ATV Hiking Truck On- and Off-road Emergency Response (within 45.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking…

Time from HQ = 50.0 minutes HQ start Estimated response time in minutes ATV Hiking Truck On- and Off-road Emergency Response (within 50.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking…

Time from HQ = 55.0 minutes HQ start Estimated response time in minutes ATV Hiking Truck On- and Off-road Emergency Response (within 55.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking…

Time from HQ = 60.0 minutes HQ start Estimated response time in minutes ATV Hiking Truck On- and Off-road Emergency Response (within 60.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking…

Time from HQ = 65.0 minutes HQ start Estimated response time in minutes ATV Hiking Truck On- and Off-road Emergency Response (within 65.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking…

Time from HQ = 70.0 minutes HQ start Estimated response time in minutes ATV Hiking Truck On- and Off-road Emergency Response (within 70.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking…

Time from HQ = 75.0 minutes HQ start Estimated response time in minutes ATV Hiking Truck On- and Off-road Emergency Response (within 75.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking…

Time from HQ = 80.0 minutes HQ start Estimated response time in minutes ATV Hiking Truck On- and Off-road Emergency Response (within 80.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking…

Time from HQ = 85.0 minutes HQ start Estimated response time in minutes ATV Hiking Truck On- and Off-road Emergency Response (within 85.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking…

Time from HQ = 90.0 minutes HQ start Estimated response time in minutes ATV Hiking Truck On- and Off-road Emergency Response (within 90.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking…

Time from HQ = 95.0 minutes HQ start Estimated response time in minutes ATV Hiking Truck On- and Off-road Emergency Response (within 95.0 minutes) Farthest away location (96.0 minutes) Minimum travel-time considering on- and off-road travel by truck, ATV and hiking…

Time from HQ = 95.0 minutes HQ start Estimated response time in minutes ATV Hiking Truck On- and Off-road Emergency Response (Response Route) The best Response Route for any location is identified as the steepest downhill path over the travel-time surface (optimal path)… Farthest away location (96.0 minutes) Response Route (optimal Path)