Technology Refresh Project Plan Version 1.0. Overview This project is about deploying the desktop machine for around 1800 users. The process begins from.

Slides:



Advertisements
Similar presentations
© Copyright 2006 FPT Software 1 © FPT SOFTWARE – TRAINING MATERIAL – Internal use 04e-BM/NS/HDCV/FSOFT v2/3 How to work in Fsoft project Authors: KienNT.
Advertisements

January 23-26, 2007 Ft. Lauderdale, Florida Designing & Implementing Your IP PBX Success is all in the planning Paul C Cissel, CEO, Internet & Telephone,
Network Design and Implementation
Software Delivery. Software Delivery Management  Managing Requirements and Changes  Managing Resources  Managing Configuration  Managing Defects 
DEPARTMENT OBJECTIVES 1. To Identify and deploy information technology to meet business objective at CKPL. 2.To Provide support to users for systems usage.
1 RUP Workshop By George Merguerian Senior Partner Business Management Consultants
1Lou Somers Software Engineering Projects 2IP35 Autumn 2014
Implementation Plans and Teams IACT424/924 Corporate Network Design and Implementation.
4/17/2017 7:07 AM © 2007 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be registered.
High-Level Assessment Month Year
Development and Quality Plans
Network Configuration Management hite_paper0900aecd806c0d88.html.
by Evolve IP Managed Services
Final Design and Implementation
Client Management. Introduction In a typical organization there are a lot of client machines used for day to day operations Client management is a necessary.
Team assignment 13 TEAM 3 – K15T1 Hanh Luong – Leader – T Hao Tran – T Huy Nguyen – T Hieu Le – T Quang Nguyen – T
Company Overview Provider of IT and program support services to civilian Government agencies and the Department of Defense Project Management ITIL Based.
MD-EXPERT Medical Practice Management System. Product Overview Primary markets Family Practice Internal medicine General Practitioner Small to mid-size.
systemhound © Raxco Software Belgium systemhound PC inventory software.
Welcome! Presenter: Tandy Trujillo. Major Topics To Be Covered Complete Physical Inventory Cycle Counts / Partial Physical Inventory Linear Pro Sled w/
UNM IT Managed Workstations. Benefits of Managed Workstations  Standard software with uniform configuration ensures end users have the same set of applications.
Mantychore Oct 2010 WP 7 Andrew Mackarel. Agenda 1. Scope of the WP 2. Mm distribution 3. The WP plan 4. Objectives 5. Deliverables 6. Deadlines 7. Partners.
City of Los Angeles Personnel Department Mobile Application Team 02:Shreya kamani Anushree Sridhar Pattra Thongprasert Abhishek Trigunayat Travis Jones.
INSRV IT The Technology Roadmaps Hugh Beedie & Paul Hobson CTO & Deputy CTO.
Team 2 - Chimera Consulting Portable Office Environment (POE) Christine Benoit Adam Fairhall Anni Hsia Tom Maciejczyk Anita Patel.
MyFloridaMarketPlace CRB Meeting

Task Management: Is it for ME? How some people manage to be so organized!!! Fed up managing stuffs with repetitive work schedules??? Your team lost tracks.
Microsoft Solution Accelerator for Business Desktop Deployment Microsoft ® Solution Accelerator for Business Desktop Deployment Training for IT Professionals.
Scott Drucker, Systems Engineer Migrating to Microsoft Vista with WinINSTALL.
Sale system Expected system: Web-base, Software Application, 2 tiers Application – data, Stand alone database for client, Database engine for Server, Client.
- Work Environment Details Jun -15. Purpose  This document provides overall description of various infrastructure support an Project in our Organization.
KS3 Phase4 Client Server Monitoring System October 1, 2008 by Stephen, Seema, Kam, Shpetim.
1 Operations Objectives April 21, Q
Mazlan Sulong Department of Statistics MALAYSIA Census Data Capture MALAYSIA Population Census 2000 vs Population Census 2010 (proposed solution)
Proposed H.323 Forum Testing Program Support Sanjay Mishra – October 24, 2002.
VMs in Azure Breeze Lab Manager 19 November 2012.
Microsoft Management Seminar Series SMS 2003 Change Management.
Network design Topic 6 Testing and documentation.
Sage ERP X3 Standard Edition Methodology
Chapter 12 The Network Development Life Cycle
Team assignment 13 TEAM 3 – K15T1 Hanh Luong – Leader – T Hao Tran – T Huy Nguyen – T Hieu Le – T Quang Nguyen – T
Illuminating Britelite’s Internal Services for Success Strategy for Process Improvement.
1 Software Maintenance and Evolution CSSE 575: Session 4, Part 2 Software Maintenance Process Steve Chenoweth Office Phone: (812) Cell: (937)
Staff Assessment Technology Services Department Palmyra Area School District.
HDPlus Asset Management HDPlus, Inc. Landline: Fax Cellphone:
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 1 Slide 1 6/6/2016 1/25 IT076IU Software Engineering Project Review 2.
ISIS Project Status Report May 18, 2006 Prepared by MAXIMUS, Inc Education Systems Division for the ABT Committee.
1 State of Georgia (GTA) Desktop Inventory Workshop March 16, 2009 © 2009 IBM Corporation IBM.
LOGO Song Identification System Team members: Nguyen Ngoc Tan Ho Vinh Thinh Nguyen Huu Duy Nguyen Hoang Diep Nguyen Trong Dai Le Thanh Tung Supervisor:
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Office 365 Migration Your migration date: January 20,
Digital public procurement
Implementation of Computer Maintenance Management system - CMMS
Self-service enrollment for Windows desktops
Scrum Project Transition Case Study
Introduction to System Administration
Introduction to System Administration
9/18/2018 Department of Software Engineering and IT Engineering
NTC 324 RANK Lessons in Excellence-- ntc324rank.com.
Migration Strategies – Business Desktop Deployment (BDD) Overview
Company Overview Provider of IT and program support services to civilian Government agencies and the Department of Defense Project Management ITIL Based.
Annual Computer Deployment 2018
Deployment timeline This template is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED, OR STATUTORY, AS TO THE INFORMATION.
Personnel Availability & Scheduling System (PASS)
Deployment timeline This template is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED, OR STATUTORY, AS TO THE INFORMATION.
[Work Order #] [ARB Date]
Delivery of Solutions Information Management
PerformanceBridge Application Suite and Practice 2.0 IT Specifications
Presentation transcript:

Technology Refresh Project Plan Version 1.0

Overview This project is about deploying the desktop machine for around 1800 users. The process begins from the delivery of machines from HP, delivery verification, Internal assest tagging, movement to the staging room, image blasting, application installation, installation verification by engineer, Installation verification by end users, old setting information capturing, deployement to the user table, resettle the old user setting and sign-off from users. So this document (Project plan) will drive us to acomplish the project and it's internal processes those are mentioned above within the given timeframe with delegated persons.

Deployment flow process slide 9

Team members Project Manager Team lead 1 Team lead 2Team lead 3 UAT 1 UAT 2 UAT 3 UAT 4 UAT 5 Desktp eng1 Desktp eng2 Desktp eng3 Desktp eng4 Shipping clerk 1 Shipping clerk 2 Shipping clerk 3 Shipping clerk 4

Roles and responsibility Shipping Clerk Unpacking/packing Inward goods counting with serial numbers and material details Asset Tagging Entry for other details ie. departure place and destination place Physical movement of the materials Inventory Inward/Outward details Desktop Eng. Machine physical connectivity MAC ID Registration Image Blasting Installation verification (Domain, OS, Office) Application installation Application verification (look & feel, old setting resettling)

Roles and responsibility User Acceptance Tester Schedule the appointment with end user Old user setting configuration capturing Data backup if needed Check-list fill-up for end users Verification of application and old settings Migration schedule appointment Signoff Team Leader Point 1 Point 2 Point 3 Point 4 Point 5 Point 6 Signoff

Roles and responsibility Project Manager Point 1 Point 2 Point 3 Point 4 Point 5 Point 6 Point 7

Risk Factor Unavailibility of resources (Human/Materials) Resources incompetent to do the task Corporate Network Overheads Hardware Issues(Desktop/Server) / Server Issues app issues End-user time unavailibility Factors those will contribute to delayness on the project Counter parting the above factors Timely escalation to the resource provider (Human/Materials) Train the process, Process documentation, Change the resource Change the time shift and fix the task in not business peak hours Escalate to the concern department or change the device or software Report to the Nomura IT team, (Note: this is main factor in most of the deployments so Nomura team should interfere on this) Risk factor calculation

Targets and deadline Twenty machines per day (That inludes entire flow process diagrammed on slide 3 6 month from the date of the project start

Finishing the deployment in define time-line Assigning proper roles and responsibility Calculating the risk factors for the project Summary