HL-LHC Configuration Management Keywords : HW Baseline, Naming, Parameters, Layout DB, Change Control The HiLumi LHC Design Study (a sub-system of HL-LHC)

Slides:



Advertisements
Similar presentations
KA2 – Cooperation for innovation and the exchange of good practices Capacity Building in the field of Higher Education (CBHE) Application and selection.
Advertisements

HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
Using Microsoft SharePoint to Develop Workflow and Business Process Automation Ted Perrotte National Practice Manager, Quilogy, Microsoft Office SharePoint.
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
New HV test specification for the LHC N. Catalan for the EI section.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
SE-02 CONFIGURATION MANAGEMENT Today we talk about Software Configuration Management (SCM for short): - What? - Why? - How?
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
HL-LHC Quality management
14 December 2006 CO3 Data Management section Controls group Accelerator & Beams department Limits of Responsibilities in our Domains of Activities Ronny.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Barriere O, Le Roux P
CERN Methodology document 1 Use of CERN CAD Exchange tool Process and rules for exchange of CAD files by using CERN CAD Exchange tool. Prepared by : B.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Software Engineering 2003 Jyrki Nummenmaa 1 CONFIGURATION MANAGEMENT Today we talk about Software Configuration Management (SCM for short): -
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
LHC Hardware Commissioning Review May 2005, CERN, 1211 Geneva 23 1 LHC Hardware Commissioning Review Contribution ID: 20 – Quality assurance and.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
1 1 Aeronautical Information Services Brief to AIXM User Group 27 February 2007.
Software Engineering – University of Tampere, CS DepartmentJyrki Nummenmaa Configuration management.
Corporate Technical Infrastructure Management From MP5 to a Corporate Technical Infrastructure Management System.
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
12/8/2015PLC Software Configuration WG - CCB1 PLC Software Configuration WG Members Philippe Gayet Fréderic Havart Renaud Barillère [Mathias Dutour]
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
CPSC 871 John D. McGregor Change management Module 2 Session 3.
Management of Software Project CSM Software Configuration Management (SCM)
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
Firmware - 1 CMS Upgrade Workshop October SLHC CMS Firmware SLHC CMS Firmware Organization, Validation, and Commissioning M. Schulte, University.
LIU-PSB Configuration Management EDMS Documentation, Layout and ECRs Thomas Birtwistle EN-MEF-DC.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
WebDat: A Web-based Test Data Management System J.M.Nogiec January 2007 Overview.
HL-LHC Organization: Now and post HiLumi
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
16-17 January 2007 Post-Mortem Workshop Logging data in relation with Post-Mortem and archiving Ronny Billen AB-CO.
Project Breakdown Structure Tracing changes to our different baselines I. Bejar Alonso and Project Office TCC – 14 th January 2016.
Review of the processes released in the framework of the MMP Goran Perinić.
Safety Documentation Formerly an exotic unknown, today part of the work!
ELENA Documentation and Data Management Items, Assets, Functional Positions T. Birtwistle EN-ACE-CL With input from T. Krastev EN-ACE-EDM.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Database - How to keep BI information up to date? Samy Chemli on behalf of EN-MEF-DC.
Proposal: Use of ECRs for “Controls” Changes and Renovations Rende Steerenberg, Samy Chemli, Marine Gourber-Pace, Klaus Hanke, Verena Kain, Bettina Mikulec,
Quality Assurance for LHC Gas Systems Stefan Haider / EP-TA1.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS:
Cold mass procurement, status and plan, QA-QC H. Prin With contribution from S. Becle, O. Housiaux, R. Principe, J.-L. Rudeiros Fernandez, F. Savary 3.
Project Codes/Coding Pierre Bonnal Project Codes/Coding — P. Bonnal2 Three to tango Agenda “as-is” “should-be” “to-be”
11T Quality Assurance O. Housiaux, R. Berthet, S. Menu, R. Principe 3rd International Review on the 11T dipoles at collimator Section for the HL-LHC 6-8.
LIU Configuration Management EDMS Documentation, Layout and ECRs This presentation follows the LIU-PSB specific presentation done on 9 th October 2014.
WP3 Quality Assurance Rosario Principe Richard Berthet, Olivier Housiaux, Sabine Menu, Paula Alvarez Lopez International Review of the Inner Triplet Quadrupoles.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LHC intervention scheduling with the Work Acceptance Tool
Cold mass design, assembly plans and QA/QC at CERN
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
Vacuum Controls Quality Management
Equipment simplified model SMR UR safety
Document Plan & Milestones WP7
Configuration Management and Layout Database ELENA Project
Layout Drawings and Mechanical Assembly Drawings
Paper 7: Technical Updates
Automation of Control System Configuration TAC 18
HL-LHC Quality management
Presentation transcript:

HL-LHC Configuration Management Keywords : HW Baseline, Naming, Parameters, Layout DB, Change Control The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement

HL-LHC Configuration Management This presentation addresses the configuration management of HL-LHC and places it in perspective of a future merge with LHC. Compatibilities, proposals and issues are presented. It is structured as follows: LHC Project and LHC Machine LHC Project and LHC Machine Handling concurrently HL-LHC and LHC Handling concurrently HL-LHC and LHC Names, parameters, layout, slots, HW Baseline Names, parameters, layout, slots, HW Baseline Activity and HW Baseline/Parameters Activity and HW Baseline/Parameters What’s next What’s next S. Chemli

LHC Project and LHC Machine LHC Project (prior to its installation) was handled through configuration management to allow A clear view on the state of the project – in a HW Baseline, LHC Equipment Catalog for Parameters, Layout DB for MAD/X A clear view on the state of the project – in a HW Baseline, LHC Equipment Catalog for Parameters, Layout DB for MAD/X A common view on the state of the project – Approval of parameters and documents (PLC, TCC, LTC, LMC, Maric,…) A common view on the state of the project – Approval of parameters and documents (PLC, TCC, LTC, LMC, Maric,…) LHC Machine (in operation) follows the same rules, with configuration management and change control (ECRs). Every step/stop is traced – changes from TS/LS to TS/LS Every step/stop is traced – changes from TS/LS to TS/LS S. Chemli

LHC Project and LHC Machine Documents were stored in the Hardware Baseline From Isabel’s presentation to HLTC S. Chemli

Handling concurrently HL-LHC and LHC Several aspects to consider: Names Names Parameters of magnets Parameters of magnets Layout drawings Layout drawings Functional positions - Slots Functional positions - Slots HW Baseline HW Baseline S. Chemli

Names The Naming portal now covers all accelerators S. Chemli

Names Names have to be compatible with existing ones and properly declared in Naming, e.g. MQXF. Proposal : Use address Use Get a reference person in the Magnets group with an overview of all the codes Get a reference person in the Magnets group with an overview of all the codes Issue : Might be necessary to update to 8 characters for the equipment codes. QA-WG issue Might be necessary to update to 8 characters for the equipment codes. QA-WG issue S. Chemli

Parameters From Isabel’s presentation to HLTC S. Chemli

Parameters As a reminder, the equipment catalogue is fully integrated into the Layout and actively used today by operations, MAD generation files, ELQA campaigns, HWC tests Proposal : Use the LHC equipment catalogue Use the LHC equipment catalogue Issue : Approve the parameters Approve the parameters S. Chemli

Layout Drawings These are conceptual drawings LHCLSX and LHCLSXG, LHCLSS, LHCLSA and electrical drawings LHCLSD, cryogenic P&ID LHCLSQR These names are the ones of the current LHC machine. Proposal : Use new names for the drawings with a lifetime up to LS3 Use new names for the drawings with a lifetime up to LS3 Issue : Maintain several sets of drawings: LHC vs HL-LHC, Multi- branching inside HL-LHC Maintain several sets of drawings: LHC vs HL-LHC, Multi- branching inside HL-LHC Maintain and modify by hand (trial and error), maintain and modify with a DB input (with approval and versioning) Maintain and modify by hand (trial and error), maintain and modify with a DB input (with approval and versioning) S. Chemli

Functional Positions - Slots Functional Positions, Types, and Regions are going to change heavily. Still some internal mechanisms in the Layout DB help in checking integrity of the data. Proposal : Use the layout DB for defining configuration of assemblies, e.g. LQXDA, functional positions e.g. LQXDA.3R5, regions e.g. 4R5 Use the layout DB for defining configuration of assemblies, e.g. LQXDA, functional positions e.g. LQXDA.3R5, regions e.g. 4R5 Introduce validity dates for all elements handled in the layout DB Introduce validity dates for all elements handled in the layout DB Issue : Availability of such a modification is mid-LS1 or end-LS1 Availability of such a modification is mid-LS1 or end-LS1 Checking and re-checking coherence once data is updated Checking and re-checking coherence once data is updated S. Chemli

HW Baseline The HW Baseline is the place were long-term documents are stored. By long term documents, it is meant Procurement (Technical Specifications for MS, IT, PI) Procurement (Technical Specifications for MS, IT, PI) Engineering Specifications, Change Requests Engineering Specifications, Change Requests Manufacturing (Drawing folders, Assembly Procedures, Test Procedures, Installation Procedures, etc.) Manufacturing (Drawing folders, Assembly Procedures, Test Procedures, Installation Procedures, etc.) Proposal : Rename nodes with a ‘Current Machine’ prefix Rename nodes with a ‘Current Machine’ prefix Duplicate the nodes with ‘HL-LHC’ prefix Duplicate the nodes with ‘HL-LHC’ prefix This eases the attachment to the activity structure (see next slide) This eases the attachment to the activity structure (see next slide)Issue: The overall baseline becomes unreadable The overall baseline becomes unreadable Re-work the baseline to suppress nodes at LS3 Re-work the baseline to suppress nodes at LS3 S. Chemli

HW Baseline This is a sample of the HW Baseline with the first upgrade project S. Chemli

Activity and HW Baseline/Parameters To be able to continue storing information on the official systems but be able to find HL data without navigating From Isabel’s presentation to HLTC S. Chemli

Activity and HW Baseline/Parameters Parameters will be a mirror of the LHC equipment catalogue Documents will be updated automatically by any document introduced in the hardware Baseline with the same equipment code but you will be able to create documents that are not “compulsory” and that will have a normal EDMS numbering MQXF From Isabel’s presentation to HLTC S. Chemli

What’s next Getting an overview on the needed codes (Naming) : correctors, dipoles, cavities, DFB…, and work with all the link persons from the groups and the PE. Already started with MQXF for example. Getting an overview on the needed codes (Naming) : correctors, dipoles, cavities, DFB…, and work with all the link persons from the groups and the PE. Already started with MQXF for example. Prepare the HW baseline by separating nodes where adequate Prepare the HW baseline by separating nodes where adequate Prepare the set of drawings handling the conceptual layout. And define methodology with the layout DB. Prepare the set of drawings handling the conceptual layout. And define methodology with the layout DB. Collect the parameters of the magnets approved by the PLC and insert in EDMS Collect the parameters of the magnets approved by the PLC and insert in EDMS S. Chemli