1 Department of Public Works and Engineering FY11 Budget Presentation.

Slides:



Advertisements
Similar presentations
Capital Improvement Plan Financial Options September 12, 2013 Presented by: City Administration Finance Department.
Advertisements

Sanitary Sewer System Rate Study September 2012 Keystone Municipal Services.
PUBLIC WORKS DEPARTMENT
City of Clinton Fiscal Year 2013 Sewer Rate Recommendations Committee of the Whole April 24, 2012.
City of South Burlington City Council Adopted January 12, 2013 FY 2014 Budget - Keys to Financial Success Prepared by Sandy Miller, City Manager and Bob.
FISCAL YEAR BUDGET MONROE METROPOLITAN POLLUTION CONTROL SYSTEM BUDGET 1 Presented by Barry S. LaRoy, P.E. Director of Water & Wastewater Utilities.
FY Budget Presentation to Board of Finance March 31, 2014 SWPCA William P. Brink, Executive Director Rhudean Bull, Administration Manager.
1 CITY OF MONROE WASTEWATER DEPARTMENT BUDGET Presented by Barry S. LaRoy, P.E. Director of Water & Wastewater Utilities March 27, 2010.
City of Modesto FY Proposed Budget Utility Funds Utility Planning & Projects Public Works Finance.
Public Works Jack Petkus, Director Informational Overview.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
PUBLIC WORKS OPERATIONS: TRANSPORTATION Steve Hansen, PE Director of Public Works – Liberty, MO APWA PW Institute April 8, 2014.
Proposition 1B and the Strategic Growth Plan Randell Iwasaki California Department of Transportation.
The coming storm: Managing Roanoke’s Stormwater Infrastructure Challenges Solutions for Roanoke’s future.
Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28, 2010.
DEPARTMENT OF TRANSPORTATION. Mission Statement Plan, Design, Construct, Operate and Maintain the roadway system under the jurisdiction of Lee County.
The City of North Bend Sanitary Sewer System
1 Combined Utility System Cost of Service Rate Study Presentation April 6, 2010.
MONROE METROPOLITAN POLLUTION CONTROL SYSTEM BUDGET 1 FISCAL YEAR BUDGET Presented by Barry S. LaRoy, P.E. Director of Water & Wastewater Utilities.
City Of Phoenix Water Rates June 30, 2011 Denise Olson Deputy Finance Director Finance Department.
Finance Department Presentation to the City of Houston Budget and Fiscal Affairs Committee FY2011 Budget Overview and General Fund Five Year Scenario May.
TOWN OF MONTREAT FISCAL YEAR Annual Budget Public Hearing and Presentation to the Board of Commissioners June 13, 2013.
2004 Budget Presentation City Commission Budget Study Session July 2, 2003.
U.S Conference of Mayors August 2004 Mayor’s ’04 Metro Agenda Bipartisan Priorities Statement Directed for candidates in Presidential and Congressional.
2014 Budget Department Presentations Infrastructure Funding Options.
City Manager’s Proposed Budget for Fiscal Years 2010 and 2011 City of Palo Alto Finance Committee May 19, 2009 Public Works Department- Enterprise Funds.
THE COST AND LEVEL OF SERVIC E PRESENTED BY: COURTNEY REICH, AICP ECOLOGICAL PLANNING GROUP Stormwater Management Programs for Local Governments.
City of Houston Long Range Financial Management Task Force City Financial Overview Part I August 29,
City of Norman Municipal Finance Series Session V November 18, 2010 WELCOME.
Finance Department Presentation to the City of Houston Budget and Fiscal Affairs Committee First Quarter Review General Fund Five Year Scenario and FY2012.
Merger of Mass Turnpike and Mass Highways January 22, 2004.
Council Policy Forum Feb. 23, 2015 CAPITAL PLANNING & INFRASTRUCTURE.
John Angiulli Director PUBLIC WORKS DEPARTMENT Citizen Academy September 8 & 15, 2015.
FINAL BUDGET CITY COUNCIL PUBLIC HEARING SEPTEMBER 27, 2011.
TENTATIVE BUDGET PRESENTATION CITY COUNCIL PUBLIC HEARING SEPTEMBER 8, 2010.
PROPOSED BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 23, 2011.
Town of Broadway Fiscal Year 2016 Budget May 19, 2015.
BUDGET Compliance With Levy Limits. You are the next contestant on The Price is not Right Cost Controls from Madison have caused major problems.
John Angiulli Interim Director PUBLIC WORKS DEPARTMENT Citizen Academy October 9 & 16, 2012.
DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.
Overview Fiscal Year 2015 Recommended Operating Budget City Council Work Session March 25, 2014 City Manager and the Department of Budget & Evaluation.
City of New Brighton Department of Public Works City Services Task Force Presentation April 17, 2003.
Town of Yountville B ARTLE W ELLS A SSOCIATES Independent Public Finance Advisors Water and Wastewater Rates Prop. 218 Hearing February 15, 2011.
Town of Oro Valley Oro Valley Stormwater Utility Commission Overview.
March 21, BUDGET PRESENTATION- ROADS CAPITAL PROJECTS WATER WASTEWATER.
SUMMARY OF FY2016 PROPOSED BUDGET July 21,
1. FY Proposed Budget Jamie Justice, Town Manager & Piet Swart, Finance Director April 26, 2016 Fiscal Year Proposed Budget 2.
2016 PROPOSED BUDGET: PUBLIC WORKS OCTOBER 06, 2015 STEVE LENISZEWSKI, PE, PUBLIC WORKS DIRECTOR.
Sanitary Sewer Fee Study March 4, Summary Sausalito’s 75-year-old sewer system is old and deteriorated. While the current rates have allowed the.
City of Joliet 2016 Proposed Budget November 30, 2015.
Public Works/Municipal Utilities Department FY City Council Budget Workshop June 15, 2015 Presented By: Glen W. C. Kau, PE Director of Public Works/Municipal.
P UBLIC W ORKS D EPARTMENT Total Proposed Budget $52,121,714 Funded Full Time Equivalent Positions (FTEs) = 238 Budget page Budgets shown in Millions.
2014 Budget Expenditures City of Knoxville, Iowa Presentation by Harold Stewart, City Manager Monday, February 11, 2013.
PUBLIC WORKS FY 2012 Proposed Budget May 24, 2012.
Water Utility General Overview Revenues Overall Revenue Increase 2.6% Expenditures. Overall Expenditure decrease of 1.3% Reservoirs Supplies 203.6% Hydrant.
Public Hearing – FY 2017 – 2021 Recommended Capital Improvement Program Budget April 25, 2016.
Global Service Provider Buildings Energy Environment Transportation Water Water and Wastewater Rate Study Village of Villa Park, Illinois Presented to.
Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.
REVENUE OVERVIEW FY2016 PROPOSED BUDGET July 28,
2015 Annual Financial Report December 31, Total Revenue $13,068,887Total Expenditure $14,006,870 Revenue Budget $14,957,884Expenditure Budget $15,669,564.
FY 2017 BudgetHearing September 8, 2016 Mike Loftin, Assistant City Manager - Finance 1.
PUBLIC MEETING 2017 Water and Sewer Budget December 13th, 2016.
Public Works/Municipal Utilities Department
Environmental Services
PUBLIC WORKS DEPARTMENT
Department of Public Works FY 2018 Recommended Budget
Infrastructure Investment Needs
Common Sense Steps Towards Strong Financial Planning
Department of Public Works FY 2019 Recommended Budget
SEWER DEPARTMENT BUDGET WORKSHOP
Presentation transcript:

1 Department of Public Works and Engineering FY11 Budget Presentation

2 PWE MISSION OVERVIEW We plan, design, construct, operate and maintain Houston's critical public infrastructure systems and administer the City’s building and development codes in a coordinated manner to provide excellent drinking water and wastewater collection and treatment, effective storm water drainage, safe buildings and streets; and we do so responsively, efficiently and in an environmentally responsible fashion.

3 BudgetFY2010 Adopted FY2010 Current FY2010 Estimate FY2011 Proposed O&M$646.2M$639.3M$621.8M$629.9M Debt Service$421.7M$402.1M$401.7M$458.3M Equipment$23.3M$18.8M$17.0M$23.1M Revenue$854.4M $824.6M$989.1M FTEs4,182.94,162.33,978.94,098.5 PWE BUDGET FY11 OVERVIEW

4 BUDGET REDUCTION IMPACT FUND 1000 PWE has two major General Fund operating divisions that were significantly impacted by the FY10 and FY11 budget reductions as follows: ROW Division ($1.1M): –Total concrete usage for repairs of base failures and buckles in streets decreased from 326,000 cubic feet in FY10 to 262,000 in FY11. –Lane miles of Asphalt Overlay decreased from 185 in FY10 to 140 in FY lane miles was budgeted in FY10 but decreased to 165 as part of the FY10 budget reductions. Additional 25 miles is further reduced in FY11. T&T Division ($0.6M): –Sign installations decreased from 26,000 in FY10 to 20,000 in FY11. –New fabrication of street signs decreased from 21,000 in FY10 to 18,000 in FY11. FY10 AdoptedFY10 CurrentFY10 EstimateFY11 ProposedVariance from Adopted BUDGET$50.5M$49.2M$48.8M ($1.7M) FTE’s (28.5) RIGHT OF WAY (ROW) and TRAFFIC & TRANSPORTATION (T&T) GENERAL FUND O&M DIVISIONAL BUDGETS

5 TRAFFIC & TRANSPORTATION OVERVIEW FUNDS 1000, 1001, 2304 & 2402 MAJOR PROGRAMS – –Maintain over 1,000,000 street name and traffic control signs – –Maintain traffic signals at over 2,400 intersections – –Maintain over 1,650 school zone beacons – –Monitor 140 railroad crossings – –Manage permitting process for lane and sidewalk closures – –Apply 4.2M linear feet of paint and 100,000 linear feet of thermoplastic striping for pavement markings – –Coordinate Mobility Response Team activities – –Manage Neighborhood Traffic Management Program – –Manage Houston TranStar  RESOURCES – O&M Budgets FY10 AdoptedFY10 CurrentFY10 EstimateFY11 Proposed BUDGET$21.7M$21.3M$21.2M$22.3M FTE’s

6 RIGHT OF WAY (ROW) MAINTENANCE OVERVIEW- FUND 1000 RESOURCES – O&M Budgets FY10 AdoptedFY10 CurrentFY10 EstimateFY11 Proposed BUDGET$32.3M$31.5M$30.8M$31.2M FTE’s MAJOR PROGRAMS -Maintain a total of 15,850 lane miles of streets by:  Applying 16,000 tons of asphalt to potholes and street skin patches  Overlaying 140 lane miles of streets  Applying 262,000 cubic ft of concrete to repair failures and buckles -Inspect and repair 1,350 bridges -Replace 8 bridges -Maintain 2,500 dead-end barricades

7 ROW – FLEET MAINTENANCE OVERVIEW – FUND 1005 RESOURCES – O&M Budgets FY10 AdoptedFY10 CurrentFY10 EstimateFY11 Proposed BUDGET$24.5M $24.6M$25.8M FTE’s MAJOR PROGRAMS – –Revolving Fund used to service vehicles citywide – –Maintain 4,700 (4,200 PWE) vehicles/equipment for 17 departments at 8 repair facilities located Citywide – –Maintain a 95% vehicle availability rate – –Maintain/operate 17 vehicle fuel sites, dispensing 2.6M gallons of unleaded and diesel fuel – –Manage 30 contracts with outside vendors for specialty vehicle repairs

8 ROW - STORMWATER MAINTENANCE OVERVIEW – FUND 2302  RESOURCES – O&M Budgets FY10 AdoptedFY10 CurrentFY10 EstimateFY11 Proposed BUDGET$32.7M$30.9M$30.8M$33.0M FTE’s MAJOR PROGRAMS –Maintain 2,800 miles of roadside ditches –Maintain over 3,600 miles of storm sewer lines, 100,000 inlets and 60,000 manholes –De-silt/re-grade 275 miles of roadside ditches –Inspect 60,000 unique inlets and/or manholes –Inspect 240 miles of storm sewer main lines –Mow off-road ditches (3 cycles) –Comply with requirements of National Pollutant Discharge Elimination System permit (NPDES): 1,400 storm water investigations, sweep 21,500 miles of gutter, collect 8,500 cubic yards of litter and 650,000 lbs of household hazardous waste

9 ENGINEERING & CONSTRUCTION OVERVIEW – FUND 1001 MAJOR PROGRAMS – –Manage 343 design/construction projects currently in progress   78 water projects ($252 million)   77 wastewater projects ($104 million)   143 storm sewer projects ($203 million)   45 street/bridge projects ($97 million) – –Initiate $481 million in new projects for FY11 CIP  RESOURCES- O&M Budgets FY10 AdoptedFY10 CurrentFY10 EstimateFY11 Proposed BUDGET$24.3M $22.9M$24.7M FTE’s

10 PLANNING & DEVELOPMENT SERVICES OVERVIEW – FUNDS 1000, 1001, 2301 & 8300 MAJOR PROGRAMS – –Examine over 35,000 construction plans for compliance with building code and ordinances; issue over 175,000 building permits and conduct over 496,000 building code inspections – –Provide over 1,300 engineering reviews for private development in the City; manage development in the flood plain; provide basis for FEMA flood insurance rating – –Plan for City’s future water/wastewater needs; issue 5,500 wastewater capacity reservations – –Provide Real Estate support for the annual CIP – –Perform periodic inspections of multi-family properties (over 1,000 complexes)  RESOURCES – O&M Budgets FY10 AdoptedFY10 CurrentFY10 EstimateFY11 Proposed BUDGET$61.2M$56.1M$53.0M$55.0M FTE’s

11 COMBINED UTILITY SYSTEM COST REDUCTIONS FY11 Major Cost Reductions -$8.7M Electricity reduction due to lower prices, implementing McKinsey recommendations to perform more preventative maintenance on pumps, less groundwater and more surface water pumping due to completion of the Metro Condition Assessment project. -$2.3M Natural Gas reduction due to lower prices, implementation of the McKinsey recommendation to utilize more than one centrifuge to a dryer which allows more solid waste to be treated for optimal results, as well as, utilizing high efficiency gas dryers at the Almeda Sims Treatment plant. -$2.5M Water Authority Contract Debt reduction due to paying down the principal on the Coastal Water Authority debt. $4.5M Personnel increased primarily due to HOPE, PFP and Health Benefit increases of $5.7M; however, through attrition and McKinsey efficiencies, the Department has been able to absorb $1.2M of these costs.

12 PUBLIC UTILITIES OVERVIEW – FUND 8300 MAJOR PROGRAMS – –Operate/maintain 3 surface water and 89 ground water pump stations, 174 groundwater wells, producing 142 billion gallons/year – –Operate/maintain 39 wastewater treatment plants and 420 lift stations, treating 90 billion gallons sewage/year – –Maintain 7,000 miles of water mains and over 6,700 miles of sanitary sewer collection lines, performing 13,000 repairs/year – –Maintain 54,000 fire hydrants and 182 water tanks/towers – –Provide water and/or sewer service to approximately 2.8 million regional residents  RESOURCES – O&M Budgets FY10 AdoptedFY10 CurrentFY10 EstimateFY11 Proposed BUDGET$303.2M $295.8M$286.9M FTE’s1, ,442.81,504.0

13 RESOURCE MANAGEMENT OVERVIEW – FUNDS 1000, 1001, 8300 & 8305 MAJOR PROGRAMS – –Manage $16.0 billion in fixed assets – –Bill and collect over $880 million annually in water & sewer revenue and read and maintain over 465,000 meters. – –Maintain/operate 9 warehouse facilities at 7 different locations with 8,512 unique commodities available; provide inventory support to four departments. – –4,600 construction, engineering and testing invoices processed – –Purchasing and receiving for 6,160 purchase orders, 130 active service contracts, 400 active project contracts, 154 active supply contracts and 330 P-Card users.  RESOURCES- O&M Budgets FY10 AdoptedFY10 CurrentFY10 EstimateFY11 Proposed BUDGET$123.5M$124.6M$122.5M$120.2M FTE’s

14 OTHERS HR, IT AND DIRECTOR’S OFFICE FUND 1000, 1001, 2301, 2302, & 8300 FY10 AdoptedFY10 CurrentFY10 EstimateFY11 Proposed BUDGET$23.1M$22.9M$20.2M$30.9M FTE’s  RESOURCES – O&M Budgets MAJOR PROGRAMS –Manage Safety and Environmental programs –Provide HR services for approximately 4,000 PWE employees –Provide Security Management for PWE employees and facilities –Provide IT support for 80 Applications unique to PWE and support 2,600 Users within PWE Department –Manage and support the Pay or Play (POP) Program –Perform 16 internal audits per year

15 DEBT SERVICE OVERVIEW Water/Wastewater Debt Service - $449.3M, up $44.3M from the FY10 Adopted Budget ($405M) Pension Obligation Bonds Debt Service - $5.2M Special Fleet Equipment Financing – –Fleet Equipment - $135 thousand – –Fleet Equipment General Fund - $1.0M – –Milling Machine Debt Service – $227 thousand Special Revenue Financed Equipment – –ILMS Debt Service - $266 thousand – –1002 Washington Avenue Debt - $578 thousand – –LED Retrofit Traffic Signal Upgrades – $1.7M Total Outstanding Debt - $6.0 billion (All Funds)

16 MAJOR REVENUE SOURCES OVERVIEW FY 2011 $441.5 million water sales (8300) $411.0 million sewer sales (8300) $9.3 million impact fees (8301) $35.4 million building and sign permits (2301) $1.0 million plan reviews (2301) $9.1 million sale of streets/land (1000/8300) $47.6 million METRO contributions (1000) $13.2 million Interest Income (All Funds) $21.0 million Other (All Funds) $989.1 million Total

17 Efficiencies Traffic – –Purchase of truck mounted thermoplastic applicator to replace paint application with thermoplastic material for road striping which results in an increase in life expectancy from 6 months to 3 years.

18 Efficiencies Resource Management – –Continue to implement McKinsey recommendations to increase consumer adaptation to web based payments and billings; thereby reducing paper billings and check processing. – –Continue to implement McKinsey recommendations to accelerate the installation of endpoints (76,900 for FY11), thereby improving the accuracy of the meter reads and revenue billings, as well as, minimizing operating costs. Planning & Development – –Implementation of the Integrated Land Management System web based program will enhance contractors’ ability to manage projects, permits, and inspections online; thereby improving the efficiency and quality of information exchanges. – –Co-location of 10 permitting departments from several locations citywide to the 1002 Washington Avenue Central Permit Facility; thereby increasing productivity and reducing operating costs. Grand opening targeted for July 2011.

19 Efficiencies Public Utilities – –Continue to optimize chemical dosage through improved sensor monitoring and training, as well as switching to less costly alternatives. – –Continue to implement McKinsey recommendation:   Optimize electricity by performing more preventative maintenance on pumps.   Reduce natural gas consumption by utilizing high efficient dryers at the Almeda Sims Treatment Plant, as well as, utilizing more than one centrifuge to a dryer which allows more cost effective operation.   Finalize roll out of reduction of crew size from three person to two person that will allow more time for preventive maintenance repairs in an effort to reduce corrective maintenance costs and extend equipment life.

20 Efficiencies Information Technology – –Continue to implement and support department wide wireless WIMAX initiatives for automated water meter reading, traffic signal and SCADA communications. – –Continue to replace PWE legacy telephones with VOIP telephones, thereby allowing increased efficiency of the data circuits by utilizing less data lines. Engineering & Construction – –Utilize manpower analysis as a basis for level of effort required for CIP Cost Recovery and personnel levels. – –Continue coordination with divisions for overall asset inventory for proper planning and allocation between Capital and Operation & Maintenance expenditures.

21 Efficiencies Right of Way – –Continue to utilize the Data Collection Mobile Unit (DCMU) system that automatically detects and rates pavement distresses; thereby allowing the department to better target the utilization of limited resources, as well as, improving the efficiency and quality of data collection.

22 PWE BUDGET FY11 OVERVIEW  Funds included: –1000General Fund –1001CIP Cost Recovery Fund –1005Fleet Management Fund –1800Equipment Acquisition Fund –2301Building Inspection Fund –2302Storm Water Utility Fund –2304Mobility Response Fund –2402Houston TranStar Fund –8300Water and Sewer System Operating Fund –8301Combined Utility System Operating Fund –8305Combined Utility System General Purpose Fund

23 Department of Public Works and Engineering FY11 Budget Presentation