BepiColombo/MMO: MDP MMO-SWG #3 [March 2006] -1- C. Noshi/RASC, Kyoto Univ. MMO Mercury Magnetospheric Orbiter MDP (Mission Data Processor) for BepiColombo.

Slides:



Advertisements
Similar presentations
The BepiColombo Mission
Advertisements

TELESCOPE ANALOG CONTROL Martin Frericks, Frans Zwart.
BepiColombo Mercury Dust Monitor ( MDM ) P.1 BepiColombo MMO Payload Mercury Dust Monitor (MDM) MMO Science Working Sub-Group Meeting At Kyoto Univ. 22.
Astrium Satellites Central Engineering – Dependability, Data Processing and Software Division (ASG7) MAPLD International.
TiAlN probe 40 mm diameter MEFISTO status January 2009 Sensor wire, 0.14 mm “puck”Boom, connected to s/c ground Max. amplitude (LF) 500 mV/m Bit resolution.
BepiColombo/MMO PWI : MMO-SWG #11 (8 Jan 2009) -1- BepiColombo MMO Plasma Wave Investigation (PWI) Jan PWI Meeting Jan MMO-SWG meeting.
14/06/20151 MORE Requirements seen from ESA Pedro Pablos 1 st MORE Team Meeting 27 Febrero 2007.
Team Name Conceptual Design Review University/Institution Team Members Date.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
UH CubeSat Project Organizational Group Meeting November 28, 2001.
LSU 10/09/2007System Design1 Project Management Unit #2.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Proposed US Contribution to the Wide Field Imager PSU MIT JHU.
Onboard Data Processing Units
Main task  Development, calibration and operation of spaceborne magnetometers Main research topics 1.Building and test of space magnetometers  Integration.
2006/3/ System Block Diagram Mechanical Interface and Component Layout Power Distribution Major Subsystem Status.
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
MMO: Payload AIV MMO-SWG #3 [March 2006] -1- C. Noshi/RASC, Kyoto Univ. MMO Mercury Magnetospheric Orbiter AIV (Assembly, Integration, Verification) for.
Aerospace Testing 2006 A Centralized Approach To Ground Support Software To Reduce Technical Risk and Overall Mission Costs Thomas Hauck GSE Software,
Indian Ocean METOC Imager (IOMI) Operational Concept Demonstrates Military Operational Utility and Enables Improved Global Weather Prediction Data to Naval.
Current Status of Software Design for MMO-PWI Y. Kasahara, T. Imachi (Kanazawa Univ.) and Y. Kasaba (ISAS)
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
BepiColombo/MMO/PWI/SORBET PWI meeting - Kanazawa 24/03/2006M.Dekkali MMO PWI Meeting Kanazawa University 24 th March 2006.
Command and Data Handling (C&DH)
SGS: Activities and Requests Helen Middleton. Hermean Environment Working Group Meeting | SGS Team | Key Largo | 16/05/2013 | Slide 2 Contents 1.ESAC.
GLAST LAT ProjectI&T PDR Presentation – Jan. 9, 2002 R. Claus1 Integration and Test Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer.
System issues System decomposition / Product tree System specification: function, performance, interfaces, budget Work-breakdown structure.
MERMAG-M/MGF MGF-OS MGF-IS MAST-MGF MAST-SC PWI-SC Credit : RISH, Kyoto Univ.
PWI Meeting Kanazawa 25/03/2006 Active Measurement of Mercury’s Plasma, AM 2 P CENTRE NATIONAL DE LA RECHERCHE SCIENTIFIQUE Laboratoire de Physique et.
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Overview Electrical Ground Support Equipment Overview Scott Williams Stanford.
BepiColombo/MMO: PWI/WPT-S PWI Kanazawa Meeting [Mar 2006] WPT-S MEFISTO-S [WPT: Team members] Lead Co-IY. Kasaba (JAXA) ManufacturerNIPPI [PWI] K. Ishisaka,
MMO-SWG #3[Mar ] PA (Safety & Mission Assurance) Activities for MMO ➢ MMO PA Plan was developed, and it will be distributed to MMO Contractors &
ASPOC & PICAM IWF/ÖAW GRAZ1 Main task  Development of hard- and software for flight instruments Main research topics 1.Magnetospheric MultiScale  Development.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n t e g r a t e d D e s i g n C a p a b i l i t y / I n s t r u m e n t S y n t h e s i s & A.
JAXA’s Exploration of the Solar System Beyond the Moon and Mars.
MMO-SWG #3[Mar ] BepiColombo Project & MMO Science Schedule H. Hayakawa, Y. Kasaba, M. Kato, T Mukai, and JAXA BepiColombo Project.
MPPE. (1) Progress from the Sep design meeting 18 Oct 2005(Tue)4 th MPPE ISAS/JAXA 18 Oct 2005(Tue)MEA team ISAS/JAXA 19 Oct.
ASPERA-3 Mar. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 3_25/ Page 1 Monthly Status Report Report due 3/25/01 Schedule statused.
C. Ingraham5-7 March 2001Data Processing Unit IFR1NCKU UCB Tohoku ISUAL Data Processing Unit (DPU) C. Ingraham.
BepiColombo Data Handling and the Science Archive Based on the presentation in Bepi-SWT #1 in April 2005 ESTEC) [J. Zender (ESTEC), Y. Kasaba (ISAS)]
PWI: Plasma Wave Instrument. Past major events: October 13: PWI 6th Kyoto meeting ( Kyoto Univ.) Discussion of the electrical interface and EMC October.
Kelley Case Concept Design Methods Chief JPL Innovation Foundry Caltech Space Challenge March 24, 2013.
Page 1 BepiColombo MMO Status Update For HEWG2014, June 2014.
SDR 7 Jun Associated Electronics Package (AEP) Curtis Ingraham.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
THE FUTURE IS NOW Mechanical Design Submission Team Details Team Name - Member 1 - Member 2 - Institution - About the Innovative Project & Applicability.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
-1- The fundamental function checks of EWO, WPT-Pre, and IPD and their I/F checks will be done inside the MHI. Function and I/F checks of the LF-SC/DB-SC.
Tethered Aerostat Program Concept Design Review Team Name Conceptual Design Review University/College Team Members Date.
3 COMPONENTS OF MAGNETIC WAVES UP TO 4 kHz
SPF MAG Quarterly Report – Feb 2015
cFE FSW at APL & FSW Reusability
I&T&C Organization Chart
Double Star: Table of Contents
Double Star: Table of Contents
Rosetta Science Ground Segment Overview
Solar Probe Plus FIELDS
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
ISUAL Associated Electronics Package
Current SOC-Ground System Integration Schedule (Jan )
TEMPO’s Commercially Hosted Payload Concept
Electrical Ground Support Equipment Verification Test Support
MIME – Update Report Olivier LE DUFF – 10 May 2012
HMI Top Level Requirements
Nov. 19, 2009 prepared by H. Matsuhara, N. Takahashi, T. Nakagawa
Integration and Test Organization Chart
Introduction and Overview
Integration & Test Instrument Operations Coordination
Project Management Unit #2
Presentation transcript:

BepiColombo/MMO: MDP MMO-SWG #3 [March 2006] -1- C. Noshi/RASC, Kyoto Univ. MMO Mercury Magnetospheric Orbiter MDP (Mission Data Processor) for BepiColombo MMO Y. Kasaba, T. Takashima, H. Hayakawa (MDP Core Team = JAXA/BepiColombo Project Office) [MDP team] Core Members PSU NTS & H. Hayakawa (JAXA) IPDNTS & Y. Kasaba (JAXA) DPU MHI & Y. Kasaba & T. Takashima (JAXA) MPPE (for MDP-1) incl. support to MGF-O T. Takashima, K. Asamura (JAXA) PWI (for MDP-2) incl. support to MGF-I/MSASI/MDM Y. Kasahara, T. Imachi (Kanazawa U) H. Kojima, Y. Ueda (RISH/Kyoto U) Y. Kasaba (JAXA) Supported by ISAS Data Handling Group

BepiColombo/MMO: MDP MMO-SWG #3 [March 2006] -2- [Meetings incl. Payload members] * Large meetings: before the next MMO-Design Meeting & MMO-SWG in May-June. (with the update of “I-ICD FAQ” and “MMO-Payload Action Item List”) [Electrical] * PSU might be independently prepared for the instruments outside of MDP. * Grounding Concept in MDP-2 : It will be fixed based on the EM test by PWI. [Mechanical / Thermal] * Vertical style: It will be studied in detail in 2006FY. [DPU] * SpaceWire I/F : Hardware design is progressed. Test hardware (= E-GSE in future) is in development. * Software :Conceptual design is progressed. [Development Schedule] *Schedule for MDP & Its I/F is updated. Progress from Jan. 2006

BepiColombo/MMO: MDP MMO-SWG #3 [March 2006] -3- PSU [DC/DC Converter] IPD [Switcher/ Limiter] Spacecraft System Mission Data Processor [MDP-1] DPU: 9 clients [CPU+MEM] PSU [DC/DC Converter] Mission Data Processor [MDP-2] MGF-in MDM (elec) Command Telemetry Power Command Telemetry Power MGF-out MEA1 (sensor/elec.) MGF-in (sensor) MDM (sensor) MSASI (sensor/elec.) MGF-out (sensor) PI instrumentsCommon instruments PWI EWO-E/B (+AM2P) MEFISTO-E SORBET MEFISTO (pre/sensor) SC (elec/sensor) IPD [Switcher/ Limiter] MEA2 (sensor/elec.) MIA (sensor/elec.) MSA (sensor/elec.) HEP-ele (sensor/elec.) HEP-i (sensor/elec.) ENA (sensor/elec.) MAST-AC/DC MAST/WPT-E WPT (pre/sensor) (motor/HK) DPU: 10 clients [CPU+MEM] Electrical concept (Old: Jan 2006) 1 Hz sync

BepiColombo/MMO: MDP MMO-SWG #3 [March 2006] -4- Mission Data Processor [MDP-1] Mission Data Processor [MDP-2] PSU [DC/DC Converter] IPD [Switcher/ Limiter] Spacecraft System DPU: 9 clients [CPU+MEM] PSU [DC/DC Converter] MGF-in MDM (elec) Command Telemetry Power Command Telemetry Power MGF-out MEA1 (sensor/elec.) MGF-in (sensor) MDM (sensor) MSASI (sensor/elec.) MGF-out (sensor) PI instrumentsCommon instruments PWI EWO-E/B (+AM2P) MEFISTO-E SORBET MEFISTO (pre/sensor) SC (elec/sensor) IPD [Switcher/ Limiter] MEA2 (sensor/elec.) MIA (sensor/elec.) MSA (sensor/elec.) HEP-ele (sensor/elec.) HEP-i (sensor/elec.) ENA (sensor/elec.) MAST-AC/DC MAST/WPT-E WPT (pre/sensor) (motor/HK) DPU: 10 clients [CPU+MEM] Electrical concept: New (Mar 2006) 1 Hz sync

BepiColombo/MMO: MDP MMO-SWG #3 [March 2006] -5- Mechanical / Thermal MDP Chassis plan (Mar.2006)

BepiColombo/MMO: MDP MMO-SWG #3 [March 2006] -6- MGF-O-E IPD-1 DPU-CPU DPU-I/F IPD-2 MDP-1 PSU 162.5mm(TBD) 25mm(TBD) 179mm(TBD) MDP-2 All: <=A5-size Mechanical / Thermal MDP Chassis plan (Mar.2006) Digital / Power part should be separated & insulated.

BepiColombo/MMO: MDP MMO-SWG #3 [March 2006] -7- MGF-I-E IPD-1 DPU-CPU DPU-I/F IPD-2 SORBET AM2P MEFISTO MAST/WPT-E MDP-2 PSU 30mm(TBD) 25mm(TBD) 334mm(TBD) 162.5mm(TBD) 50mm(TBD) MDP-2 All: <=A5-size Mechanical / Thermal MDP Chassis plan (Mar.2006) Order is free. It will be defined by MHI based on the simplification. Digital / Power part: separated & insulated from PWI/MGF EWO-E-field EWO-B-field

BepiColombo/MMO: MDP MMO-SWG #3 [March 2006] -8- *Action Items in 2006FY 1) Establishment of “MDP-Chassis concept” = “Vertical style” Development & Test of “MDP MTM” & “MDP-STM” in Apr-Sep (No support from each payload team is requested at the moment.) 2) Establishment of “PCB” inside MDP-1 & MDP-2. Following matters will be updated & discussed after the MDP-STM test. - Frame concept - Heat Path concept - Harness & Connector concept Mechanical / Thermal MDP Chassis plan (Mar.2006)