“Status of TDAQ for the 2012 runs” Gianluca Lamanna (CERN)

Slides:



Advertisements
Similar presentations
LKr for the dry run (and not only…) R. Fantechi 23/5/2012.
Advertisements

“A board for LKr trigger interface and proto-L0TP” G.Lamanna (CERN) NA62 Collaboration Meeting in Brussels LKr-WG
LKr readout: present and future R. Fantechi 30/8/2012.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
Status of the digital readout electronics Mauro Raggi and F. Gonnella LNF Photon Veto WG CERN 13/12/2011.
Straw electronics Straw Readout Board (SRB). Full SRB - IO Handling 16 covers – Input 16*2 links 400(320eff) Mbits/s Control – TTC – LEMO – VME Output.
+ discussion in Software WG: Monte Carlo production on the Grid + discussion in TDAQ WG: Dedicated server for online services + experts meeting (Thusday.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Readout electronics for the MUV detectors R. Fantechi 28/3/2012.
R. Fantechi. DAQ tools My feelings Not dealing with readout stuff No TEL62, no CREAMS, etc But the auxiliary software needed to run the experiment After.
“L1 farm: some naïve consideration” Gianluca Lamanna (CERN) & Riccardo Fantechi (CERN/Pisa)
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
SPSC Questions to the 2014 NA62 Status Report 1 Beam: which is the beam structure expected in October? Which is the intensity you can reasonably expect?
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
Local Trigger Unit (LTU) status T. Blažek, V. Černý, M. Kovaľ, R. Lietava Comenius University, Bratislava M. Krivda University of Birmingham 30/08/2012.
“TDAQ for 2012 runs” Gianluca Lamanna (CERN) Annual review meeting
Local Trigger Unit for NA62 Marián Krivda 1), Cristina Lazzeroni 1), Vlado Černý 2), Tomáš Blažek 2), Roman Lietava 1)2) 1) University of Birmingham, UK.
Proposal for optical and cable network of NA62 trigger system Marián Krivda 1), Cristina Lazzeroni 1), Vlado Černý 2), Tomáš Blažek 2), Roman Lietava 1)2)
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
TELL-1 and TDC board: present status and future plans B. Angelucci, A. Burato, S. Venditti.
TALK, LKr readout and the rest… R. Fantechi, G. Lamanna 15/12/2010.
Status of NA62 straw electronics Webs Covers Services Readout.
Overview, remarks, lamentations, hope and despair M. Sozzi TDAQ WG meeting CERN - 4 June 2013 Introduction, news and appetizer.
Update on CHANTI F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Napolitano, L. Roscilli, G. Saracino Università degli Studi di Napoli «Federico.
NA62 TDAQ WG Meeting News and usual stuff M. Sozzi CERN – 29/5/2009.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
The Patti Board Gianluca Lamanna (INFNPisa) TEL62 workshop – Pisa –
Clock and Trigger T. Blažek, V. Černý, M. Kovaľ, R. Lietava Comenius University Bratislava M. Krivda University of Birmingham.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
“Planning for Dry Run: material for discussion” Gianluca Lamanna (CERN) TDAQ meeting
R. Fantechi. TDAQ commissioning Coordination activity started on January Several items to be attacked already in January Regular meetings: 15/1, 29/1,
TEL62 AND TDCB UPDATE JACOPO PINZINO ROBERTO PIANDANI CERN ON BEHALF OF PISA GROUP 14/10/2015.
Straw electronics status  Signal generation and formation in straw  Webs + Cover  Backend  TTC  Services + DCS  New engineer on VIA program Georgios.
TEL62 update Franco Spinella INFN-Pisa 28/3/2012 CERN- TDAQ WG.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
SRB data transmission Vito Palladino CERN 2 June 2014.
Talk board status R. Fantechi, D. Gigi, G.Lamanna TDAQ meeting, Mainz
Status of the NA62 network R. Fantechi 23/5/2012.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
TDAQ news and miscellaneous reports M. Sozzi NA62 TDAQ WG meeting CERN – 13/7/2011.
TDAQ Working group meeting Mainz – 8/9/2011 Where do we stand? Where do we go?
TELL1 readout in RICH test: status report Gianluca Lamanna on behalf of TDAQ Pisa Group (B.Angelucci, C.Avanzini, G.Collazuol, S.Galeotti, G.L., G.Magazzu’,
TDC/TEL62 update M. Sozzi NA62 TDAQ WG meeting Bruxelles – 9/9/2010.
10/09/10FV 1 News and observations from Brussels' meeting.
The NA62RunControl: Status update Nicolas Lurkin School of Physics and Astronomy, University of Birmingham NA62 TDAQ Meeting – CERN, 10/06/2015.
Status of LAV electronics commissioning Mauro Raggi, Francesco Gonnella Laboratori Nazionali di Frascati 1 Mauro Raggi - Laboratori Nazionali di Frascati4.
Mai 31th 2011 Christophe Beigbeder PID meeting1 ETD meeting Test setup : Activities in Bari, Univ of Maryland and at Orsay Test setup : Activities in Bari,
R. Fantechi 2/09/2014. Milestone table (7/2014) Week 23/6: L0TP/Torino test at least 2 primitive sources, writing to LTU, choke/error test Week.
Software and TDAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
LAV electronics status report Mauro Raggi and Francesco Gonnella TDAQ meeting NA62 Collboration Meeting 1-5 September 2014 Ferrara.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
“The Dry Run” Gianluca Lamanna (CERN) TDAQ - NA62 Siena Meeting
V.Duk, INFN Perugia1 CHOD/NHOD status Viacheslav Duk, INFN Perugia Ferrara,
“CHEF board” Gianluca Lamanna & Riccardo Fantechi (CERN) TDAQ meeting
Straw (T)DAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
“Technical run experience” Gianluca Lamanna (CERN) TDAQ meeting
RICH Readout Plans F. Bucci, M. Piccini on behalf of the RICH WG.
Gianluca Lamanna TDAQ WG meeting. CHOD crossing point two slabs The CHOD offline time resolution can be obtained online exploiting hit position.
01/09/ KTAG 5/8 sectors equipped DCS system in pogress DAQ commissioning in progress Test pressure scan this week (t.b.c) 01/09/20142.
Status of NA62 straw electronics and services
Status of NA62 straw readout
LKr status R. Fantechi.
LAV front-end and readout status
T1 Electronic status Conclusions Electronics Cards:
M. Sozzi NA62 TDAQ WG meeting CERN – 20/10/2010
Trigger system Marián Krivda (University of Birmingham)
STAR-CBM Joint Workshop Heidelberg, Physikalisches Institut
Presentation transcript:

“Status of TDAQ for the 2012 runs” Gianluca Lamanna (CERN)

What we need? Detectors Front End Electronics Readout Electronics Clock (TTC) infrastructure Controls Control program Readout Farm & software …

Common projects: TEL62 TEL runsAlmost all the detectors will use the TEL62 for the readout in 2012 runs –Straw (see later), LKr, IRC/SAC (see later) solvedThe main “worry” (DDR2) has been solved: few things still to be tested (JAM, GBE, …), something small to be define (Operating system, …) PCBNew version of the PCB in the next days. Six weeksSix weeks to have the boards MayTests  ready in May DetectorTEL62 CEDAR1 CHANTI1 LAV3 STRAW1 CHOD1 LKR/L03 MUV1/22 MUV31 SAC/IRC1 Elena’s Talk

Common projects: TEL62 Firmware DetectorFirm. Resp.SW License CEDARKarimNO (?) CHANTIMimmoNO LAVMauro R.+Francesco YES STRAWPeterPartially CHODMauro P.+Cristiano YES MUV1/2Manuel +Rainer YES MUV3Manuel +Rainer YES SAC/IRC?NO

Common projects: TDCB TDCB 10Several TDCB already distributed (10) oneOnly one feedback! Several tests ongoing No major problems found 22We need 22 for the dry run Detector# chTDCB CEDAR1281 CHANTI461 LAV4809 CHOD1282 MUV1/2264(88)5(2) MUV32963 SAC/IRC41 Roberto’s Talk

Common projects: LAV FEE LAV, CHANTI, CHOD, MUV1/2, SAC/IRC LAV FEELAV, CHANTI, CHOD, MUV1/2, SAC/IRC will use LAV FEE as FrontEnd board Well advancedWell advanced: test ongoing (20 mins per board) 100 psTime resolution in the specs (100 ps) Some difference in effective threshold and time offset among the channels partially due to the experimental setup Small things missed (CPU, test with TEL62, …) Remind: swapped cables! FebruaryMay/JuneTest will finish at end February, the boards will be ready for May/June DetectorTEL62 CHANTI2 LAV15 CHOD4 MUV1/29 SAC/IRC1 Francesco’s Talk in PV

L0TP L0TPTALKThe L0TP will be done using the TALK board LVDS LTUSmall HW problem with the too small LVDS drivers to drive more than one LTU solved. L0TPWe are progressing with the L0TP firmware Max 4 detectors could contribute to the trigger TALK TELL1The TALK board will be housed in the TELL1 (we have already the crate) LTUCooperation with LTU Write on the memories Matching of extracted primitives

TTC distribution MarchThe clock fibers will be installed in March AprilThe remaining racks will be installed in April April/MayThe patch cable & the patch cord will be installed in April/May

Clock & Trigger partition 66LTUs6(+6) LTUs have been distributed 7 LTU7 additional LTU will be use in the dry run TTCexThe TTCex modules are ready for distribution LTUsApril/March TALKThe LTUs for the Dry run will be installed in April/March after Lab test with TALK board clock source no spareSPS signal emulatorThe clock source (no spare!) and the SPS signal emulator have been already installed Marian

Choke/error choke/error AprilThe choke/error cables will be placed in April RJ11-->RJ45 CAT6/7 TEL62 LTUWe propose to change the connector from RJ11-->RJ45 to use std CAT6/7 cables: change the TEL62 connectors and patch for the LTU 150m CEDAREB20Test for 150m cable from CEDAR to EB20 will be done by Marian “OR card”: LTUTALK one pair Local OR LAVMUVChoke/error “OR card”: the LTU and the TALK board will accept only one pair for each detector. Local OR is needed by LAV and MUV. GTK, CEDAR, STRAW, RICHLKRIn the future also by GTK, CEDAR, STRAW, RICH and LKR A simple common board will be advisable

PC farm network and PC farm for the 2012 runsA note is in preparation to define the network and PC farm for the 2012 runs 6 PCs 2 46 PCs foreseen for the runs: 2 on loan from Mainz, 4 have to be purchased 2 HP2910 5We have already 2x HP2910 (24x1Gb/s + 2x10Gb/s) switches, we ordered 5 more (downstairs switches) 12 slotsCore switch to be decided (HP5400 with 12 slots and only one module mounted) 1 Gb/s 10 Gb/s FARM CORE SWITCH HP2910 Detectors

Software well advancedJonas software is well advanced. CPU loadSmall issue with the CPU load, will be fixed soon Additional stuffs: Interface, monitoring, configuration,… AprilWill be ready for end of April receiver Packet Handler NIC Event builder Event array L1 Trigger L2 Trigger Storage Handler Cream req L1 compl L2 compl Jonas’s Talk

Control program EN/ICEFirst meeting with EN/ICE group before christmas helpThey will provide know-how to help in the preparation of a working system NicolasNicolas, from Louvaine, will be involved in this task. A supervisor of this delicate work should be defined. Next meeting: Friday. RunControl PVSS Detector PC PVSS Detector PC PVSS Detector PC CCPC HW DB

CEDAR CEDAR MayThe CEDAR installation will finish in the middle of May (and NINO without amplifierThe FrontEnd electronics will be done with a new (simple) board with NINO chip daughter cards but without amplifier. PM socket TDCSpecial PM socket and new boards directly on the detector (small issue on TDC cables length) July1 board = 4 NINOs = 32 channels. Will be ready in July. For the Dry RunFor the Dry Run: 128 ch 4 Cedar boards + 1 TDCB + 1 TEL62 Crate FEE type ordered

CHANTI not installed in the final positionOne prototype station will be ready for the DR (46 channels): will be not installed in the final position. June SiPMA special board will be ready (in June) to provide power and amplification for the SiPM LAV FEEThe Chanti Front End will be completed with the LAV FEE boards hospitalityThey do not have a Crate: need hospitality (check the cable length) For the Dry RunFor the Dry Run: 46 ch 2 Chanti board + 2 LAV FEE + 1 TDCB + 1 TEL62 No Crate (need hospitality)

LAV The installation already started 3 LAVs TCC83 LAVs will be equipped. Probably the ones in TCC8. LAV FEE May/JuneLAV FEE electronics ready in May/June TEL62Time corrections in TEL62 firmware (some work started) For the Dry RunFor the Dry Run: 480 ch 15 LAV FEE + 9 TDCB + 3 TEL62 3 FEE type Crates

STRAW middle of July!The installation of the completed chamber will start in middle of July! The STRAW electronics is quite different wrt the other detectors Cover Board  SRB  DaughterBoard  TEL62Cover Board  SRB  DaughterBoard  TEL62 CBSRB SRBSmall problems with links between CB and SRB solved, but still some problem in the SRB SRBSRB firmware is ongoing DBMarchJuneThe DB design will start in March, the board will be ready in June DBTEL62 STRAW will not partecipate to the dry run!But the firmware of both DB and TEL62 will start in September: the STRAW will not partecipate to the dry run! STRAW next weeks STRAW SRB firm VMESince the STRAW must be present in the technical run, in the next weeks we need to find an alternative solution to collect STRAW data in not standard way (for instance: adapt the SRB firm to receive the trigger through and readout via VME) CBSRB DBTEL62 TTC & CLK TTC VME Peter’s Talk

CHOD CHOD JanuaryThe CHOD has been tested by the Perugia team at the end of January Everything works! CHOD trigger in 2012The CHOD will provide the main signal for the trigger in 2012 (some work on firmware started) LAV FEEThe Front End will be done with LAV FEE CHODThe CHOD will use the readout boards and crate bought for the RICH For the Dry Run:For the Dry Run: 128ch 4 LAV FEE + 2 TDCB + 1 TEL62 1 TEL62 type Crate

LKR CPD+SLMThe LKr will be readout with CPD+SLM 5000 ch10 new power supplies (+1 spare): about 5000 ch TALKThe trigger distribution will be done with the TALK board TALKThe calibration control will be done with the TALK board next weekThe network switch and the fibers to upstair for the farm will be install next week. SLMSome work is need on the SLM software (merging, zero suppression,…) compatibleSLMThe PcFarm software is compatible for the SLM CREAMTest the CREAM prototype (after lab test) on the dry run? It’s very hard… SLM CPD LKr PCs TALK PC Farm TTC L0TP

LKR/L0 LKr/L0 Dry Run.The LKr/L0 could participate to the Dry Run. fake primitivesPartial test: generation of fake primitives March/AprilInstallation possible as soon as possible (March/April) CREAMSome possibility to test something “real” in case of presence of CREAM module (tbc) input mezzanineThe input mezzanine board has to be design (tbc) in details the purposes and the modes.In the next weeks we will define in details the purposes and the modes. CREAM LKr/L0 For the Dry Run: 2(or 3) TEL62 TEL62 type Crate Andrea’s Talk

MUV 1/2 MUV2Only MUV2 available in the DR MUV1 MUV2MUV1 possibly in the TR (same electronics wrt to MUV2) MUV1If ready, the MUV1 electronics should be partially tested in the DR MUV1/2 LAV FEEThe MUV1/2 will use the LAV FEE For the Dry Run (MUV1/2):For the Dry Run (MUV1/2): 264ch 9 LAV FEE + 5 TDCB + 2 TEL62 1 FEE type Crate MUV2 onlyMUV2 only 88 ch 3 LAV FEE + 2 TDCB + 1 TEL62 1 FEE type Crate

MUV3 MUV3AprilThe MUV3 will be installed in April CFDold AKL TDCB and TEL62The Front End will be done with the CFD from the old AKL and the readout with TDCB and TEL62 RG58  LemoRG58  Lemo patch panel still available Still open questions: –25 PMs –25 PMs needed –Test of the available CFD cards CFD cards (2/3) –New CFD cards (2/3) must be build: Torino (?) new card ECL  LVDS –A new card need to be built: ECL  LVDS converter TEL62Wrt MUV1/2: different TEL62, different firmware, additional TDC (ordered?), same crate For the Dry Run:For the Dry Run: 296 ch 19 CFD + 3 TDCB + 1 TEL62 MUV1/2 Crate

IRC/SAC SAC JuneIRCThe SAC is ready for installation in June, the IRC situation isn’t clear channels LAV FEE cables lengthThe frontend will be done using LAV FEE: “worry” about the cables length (probably isn’t an issue due to the large signals) Problems: TELL1 TEL62 –they have only TELL1 and can’t order a TEL62 –No manpower no license –No manpower for the firmware, no license for the software MUVHospitality in the MUV crate: 2 slots needed MUV (it’s not in the spirit of the DR!!!)Hospitality in the MUV electronics should be discussed with Rainer (it’s not in the spirit of the DR!!!) For the Dry Run:For the Dry Run: 4 ch 1 LAV FEE+1TDCB + 1 TEL62 MUV1/2 Crate

Equipments: summary DetectorTEL62TDCBLAVFEEOTHER CEDAR1104 (Cedar boards) CHANTI1122 (Chanti boards) LAV39150 STRAW CB+8 SRB+DB- 62 CHOD1240 LKR000TELL1(TALK) LKR/L0300mezzanines MUV1/225(2)9(3)0 MUV CFD SAC/IRC1110

Time schedule DRTR

Critical points STRAW: DR TR STRAWSRBSTRAW: will be not ready for the DR. Different solutions could be discussed for the TR. Fallback solutions need additional work for STRAW electronics team (different firmware for the SRB etc.) PCFARMleavesPCFARM: the software is very well advanced but Jonas leaves in April! TEL62:TEL62: Several parts of the firmware are still missed LAV FEE:LAV FEE: It’s essential for several detectors  try to respect the production schedule! CTRL PROGRAM:CTRL PROGRAM: Identification of a responsible. Proto-ctrl program for the DR? IRC/SAC: TDAQIRC/SAC: in the present situation can’t be included in the TDAQ. Discussion for possible solution. CEDARNINOsCEDAR: final decision on how to use the NINOs. PLEASE! Check the tables and react if something is wrong!