G-2 Cryogenic System. Maintenance Items Readily defendable Refurbish expansion engine Cost basis – previous expansion engine refurbishment Spare parts.

Slides:



Advertisements
Similar presentations
Energy Conservation Energy Management.
Advertisements

Chapter 4 Air-Conditioning Components
Methane Losses from Compressors Lessons Learned from Natural Gas STAR Technology Transfer Workshop Northern Natural Gas Company, INGAA, CECO, Heath Consultants,
EDM Collaboration Meeting, October 5-7, 2006 Valve R&D Steve Williamson UIUC.
Russ Rucinski, PPD/MD/DZero Ops DZero Solenoid status November 29, 2004.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
MICE Collaboration Meeting CM-151 Is the the pulse tube cooler a must or is it simply better for the MICE AFC module? Michael A. Green Lawrence Berkeley.
Chapter 9 Pricing Construction Equipment. Objectives Upon completion of this chapter, you will be able to: –Identify the three main equipment categories.
Cryogenics Applied Technology Development Dana Arenius, Rao Ganni Engineering Division Cryogenic Systems Department Technology Town Meeting Feb 9, 2012.
Current status Arkadiy Klebaner November 21, 2012
0/11TU Dresden – CERN FCC – Sept 2014 Nelium as Refrigerant for the Beam Screen and Current Lead Cooling of the FCC Fakultaet Maschinenwesen, Institut.
Engineering and Design Group Fermi National Accelerator Laboratory Cryogenic Department AAC Review, May , 2005 Jay Theilacker HPTFCRYOGENICS.
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
CMS FPIX Cooling Prototype Phase One Estimate and Conceptual Design R. L. Schmitt 10/28/2009.
T. Kirk’s 4 Dec 04 letter to DOE Construction Cost - $11M+ –Beam line g-2 ring upgrades etc - $11M –Cost sharing with RSVP of AGS/Booster rehab – discussed.
T. Kirk’s 4 Dec 04 letter to DOE Construction Cost - $11M+ –Beam line g-2 ring upgrades etc - $11M –Cost sharing with RSVP of AGS/Booster rehab – discussed.
LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.
Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 1.
SOFT 2004 OVERVIEW OF CRYOGENIC TECHNOLOGY FOR THE THERMONUCLEAR FUSION P. DAUGUET, M. BONNETON, P. BRIEND, F. DELCAYRE, B. HILBERT, A. RAVEX Air Liquide.
ESS Cryogenic Distribution System for the Elliptical Linac MBL/HBL - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden.
4/5/2005FLARE Cryogenics, RLSchmitt1 Argon Refrigeration Supply Purity.
ca Main Bullet #1 Main Bullet #2 Main Bullet #3 HXMA WIGGLER MAINTENANCE REVIEW Linda Lin June 2010.
Principles of correct VRV Installation A. Refrigerant pipe work
Cryo AIP Muon Campus AIP Review Arkadiy Klebaner January 23, 2012.
N.Delruelle (CERN)31-May-2007 Cryogenics for ATLAS and CMS Experimets N. Delruelle on behalf of AT-ECR group.
Introduction Advanced energy recovery heat pump for the Engineering Science and Research Building (ESRB). ESRB uses 54,000 CFM of 100% make-up air 24 hours.
BCWC Water-cooled water chillers with centrifugal compressor/s
ERL: G-5/e-Gun Cryogenic & Pressure Safety Committee Review ERL G-5/e-gun Beam Line Vacuum Failure Analysis April 24, 2009.
April 19, 2006A.Klebaner Cryogenics for ILC TA Current Status Plans and issues.
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
MINIATURE JOULE-THOMSON CRYOCOOLERS FOR PROPELLENT MANAGEMENT
Exhaust to atmosphere G1 V1 V2 V3 LN2 Storage Vessel 150 l Dewar Cryostat Exhaust to atmosphere Nitrogen or helium gas bottle LN2 Circuit for MIT Test,
New compressor station Second stage of nitrogen system (N2 refrigerator, cryogenic tank, pipe lines) Cryogenic equipment required to run NICA Third stage.
Superconducting Electronics and Detectors Workshop “Jefferson Lab Cryogenic Operation” Mathew C. Wright December 1,
Ahmed Sidi-Yekhlef, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN FLOATING.
Removal of 3 He from 4 He (R&D) David Haase, Franklin Dubose, Travis McCaw and Paul Huffman North Carolina State University.
G-2 Cryogenic System Restoration of G-2 Refrigerator for Proposed E969 Experiment WBS 1.11 Tony Nicoletti 2/8/06.
Restoring Komag Yasuhiro Makida Consideration of restoring and modifying Komag for a stand alone operation without the refrigerator. Contents 1.Magnet.
Assuming full load is required, all compressors will run.
SM18 cryogenics infrastructure upgrade L. Serio TE-CRG.
1 Cryogenic Design and the 4 He Evaporative Purifier David G. Haase, et al., North Carolina State University.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
TE-CRG Activities D. Delikaris, TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
RESEARCH AND DEVELOPMENT FOR FUTURE LHC SUPERCONDUCTING MAGNETS POINT SUR LA STATION D’ESSAIS préparé par Jean-Marc Gheller Steering committee –September.
TAC2 Alpi consolidation in Cryogenics and Cryomodules.
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
Thomas Jefferson National Accelerator Facility Page 1 CEBAF Cryo & SRF Workshop April 3, 2014 Mathew Wright Cryogenic Systems Operations Engineer
17-18 December 2013 LARP VTF Workshop BNL Proposal 1 A.Marone
CMTF Cryogenics (status and plans) SRF program and AD/Cryogenics work presented by Arkadiy Klebaner May 21, 2013.
1 BNL LHC Hi-Lumi QXF Vertical Test Facility Status Update M. Anerella, H. Hocker, P. Joshi, P. Kovach, A. Marone September 25, 2015.
TITLE OF THE PROJECT:- AUTOMOBILE AIR CONDITIONING AIM OF THE PROJECT:- TO STUDY ABOUT AIR CONDITIONING SYSTEM OF AN AUTOMOBILE PRESENTED BY: INAMUL.
Cryovessel Engineering David Haase, Jan Boissevain, Ernie Ihloff WBS long lead time items Cryovessel Dilution Refrigerator Helium Liquefier.
Operation of cryogenics for LHC detectors: what did we learn? European Cryogenics days U. Wagner, CERN.
1 Cryogenic System of Interaction Region (SiD, ILD, QD0, QF1, Crab Cavity) in the Japanese Mountain Site WebEx meeting : June 19 th, 2012 IPNS/Cryogenic.
Makara, Aug. 17, Cryo Dept. Shutdown Status.
Section 2: Safety, Tools and Equipment, and Shop Practices
Cryogenic Plant Controls – Cost and Schedule
Online Helium Inventory Monitoring of JLab Cryogenic Systems
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Mathew C. Wright October 2016
Mathew C. Wright January 26, 2009
Jane Gartshore Cool Concerns Ltd UK
ILC Experimental Hall Cryogenics An Overview
SNS Cryoplant Commissioning Past Experiences
Engine Lubrication Systems
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
Presentation transcript:

G-2 Cryogenic System

Maintenance Items Readily defendable Refurbish expansion engine Cost basis – previous expansion engine refurbishment Spare parts for expansion engine Cost basis- previously purchased parts Recertify relief valves Cost basis – RHIC relief valve recertification Compressor maintenance Cost basis -estimate from compressor manufacturer Replace polyflow tubing Cost basis- known tubing cost Replace valve positioners Cost basis – valve positioners purchased for RHIC Flow controllers on power leads Cost basis – flow controllers purchased for RHIC

Fix Known Helium Leaks How far from being defendable? Need to review system leaks and determine difficulty in locating/fixing them Time and Effort needed to make it defendable 1 engineering man week 1 technician man week Reexamine Coalescers for potential oil carryover How far from being defendable? Size and cost charcoal adsorbent system Time and Effort needed to make it defendable 4 engineering man days Revamp heat shield LN2 system How far from being defendable? Need to size new valves to make accurate cost estimate Time and Effort needed to make it defendable 2 Engineering man days Modifications/Upgrades

Gas purification equipment How far from being defendable? Need to size purification equipment Get preliminary quote Determine how it integrates into the G-2 cryogenic system Time and Effort needed to make it defendable 1 engineering man week Smaller heat shield valve on Inflector How far from being defendable? Need to size valve Need to get price quote Time and Effort needed to make it defendable 1 Engineering man day Revamp Magnet Warmup System How far from being defendable? Need to determine warmup system design Size valves and components to get Time and Effort needed to make it defendable 1 engineering man week Modifications/Upgrades

Refrigerator Operations Oil in G-2 Refrigerator The G-2 refrigerator ran at a higher average temperature last run Unclear as to what extent oil has permeated the G-2 Refrigerator 3 man weeks of engineering 3 man weeks of technician time Using SSC Plan ‘B’ refrigerator Need to quantify G-2 Heat load Need to estimate mount effort to get plan B refrigerator operational Determine amount effort needed to integrate the refrigerator into the G-2 system 1 man month of engineering