Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Review Group 0166 Review of Necessary Reform of NTS Offtake Arrangements 20 th September 2007 Beverley Grubb SGN.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
National Grid: Gas Transmission System Operator
NEC & EMERGENCY ARRANGEMENTS Paul Green 2 nd June 2005 NGT Emergency Planning.
Linepack ‘Park and Loan’ Quantity - Influencing Factors Review Group 291 – July 2010.
Exit Reform Review Transmission Workstream 07 January 2010.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Mod 116B Steve Rose - on behalf of RWE Trading. 2 Background Mod 116 B was raised after discussion with a number of shippers about aspects Mod 116 which.
Review of Offtake Arrangements Document Section I - NTS Operational Flows 9 th July 2010 – Offtake Arrangements Workstream.
Flow Margin Assumptions for NTS Planning and Development Transmission Planning Code Workshop 3 5 th June 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Offtake Arrangements Document – An Overview Paul Roberts 12 th May 2005.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
OPNs & LDZ Demand Forecasts Chris Shanley & Nick Reeves.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
Transmission Planning Code – Design Margin Update Transmission Workstream, 4 th February 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Shrinkage Forum Tuesday 8 March 2011, 31 Homer Road.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
DN Operation Iain Ward DNCC Manager. Responsibilities  Licence Holder  Obligation For 1 In 20 Capacity  DNCC Operates Networks Under Direction of The.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Enduring Exit Regime & NTS Risk Management Processes Offtake Arrangement Workstream – OAD Section I Review Group 316.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
UNC Modification 0050 – Storage Monitor Adjustment.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Review Group -140 Thoughts on additional information requirements.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Review of Offtake Arrangements Document Section I - NTS Operational Flows 10 th June 2010 – Offtake Arrangements Workstream.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
System Operator information transparency. As Transmission System Transporter National Grid Gas undertakes responsibility for safe, effective and efficient.
Offtake Workstream : 8th September 2010
Transmission Workstream 4th July 2007
Publication of Zonal Flex Data
MOD National Grid NTS Initiated Flow Swaps
DN OAD Processes: RG 0316 : Offtake Workstream
Modification Proposal 0101 – “Amendment to demand forecasting timings in relation to the Gas Balancing Alert”
Assured Pressures Proposal
Reinstatement of NTS Interruption
Stefan Leedham Transmission Workstream 2nd November 2006
Presentation transcript:

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. OPNs Offtake Arrangement Workstream – OAD Section I Review Group 316

OPNs - Agenda  OPN processes – walkthrough process flow diagrams of OAD section I/UNC section J  DN inputs  DN processes that feed into OPNs  Operational constraints  NTS Processes  Overview of the NTS processes that currently feed off OPNs  NTS Manual work-arounds (including information on METGAS screen)  OPN accuracy  NTS Exit Reform (0195AV) Processes & NTS Risk Management tools - short preview of session 2 (November 2nd 2010)

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. OPN Usage

Data Provision Definitions The rates of the offtake set out in the OPN shall reflect as accurately as reasonably practicable The quantities, rates and times at which the DNO intends /expects to flow. (OAD I a)

OPN Revision Requirements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. DN inputs

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Overview of the NTS processes that currently feed off OPNs

Key times in the current system process Demand Forecaster Run Times: Day-1 Calibration Runs 13:00 16:00 24:00 Day Every hour after 06:00 LDZ Take Data (Metgas Screen) and previous days OPNs used in GNCC processes due to OPN accuracy / timing issues.

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. NTS Manual Workarounds – METGAS

METGAS information  Forecast LDZ take provided by DNs via METGAS screens within GTMS  NTS ‘take’ = Demand Forecast + VLDMCs - (Interruption, LNG Boil Off, On Shore Fields) +/- Stock Change & Inter LDZ transfers  The METGAS screen provides a breakdown of the forecast NTS take, by LDZ and Total Take. It shows both within day and day ahead values and gives the time when the latest forecast was generated.

METGAS information (1) – Demand Forecast  NTS Demand Forecast:  An NTS Total system demand forecast comprises of data from all offtakes, i.e. direct connects, interconnector, LDZs, etc  LDZ NTS take  OPF process will substitute (last approved from previous day) OPN data that is not provided

METGAS information (2) – System balancing  National Grid NTS calculate Predicted Closing Line Pack (PCLP) and undertake balancing actions based on input and output information  Input Notifications from Delivery Facility Operators  Output Notifications provided to NTS by both Users (Direct Connects) & DNs respectively  For LDZ NTS take, NTS may use the following (depending on timing of PCLP calculation)  METGAS information  Offtake Profile Notifications

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. OPN Accuracy & Timing

Offtake Tolerances  OAD Section I   The tolerance, in respect of the offtake of gas at an Offtake is 10% of the prevailing offtake rate   The tolerance, in respect of the offtake of gas in aggregate at all of the Offtakes which serve an LDZ, is 3% of the aggregate of the Prevailing Offtake Rates.

Proportion of OPNs breaching the 10% tolerance

Distribution of Forecast Error by LDZ

Distribution of Forecast Error by hour

Evolution of Forecast Error over time from sample offtakes

Summary  Evidence provided that some OPNs are outside of the 10% offtake tolerance and the 3% LDZ tolerance  DN OPN processes run later than NTS demand forecast round up times?

Benefits associated with good quality OPNs (Current processes)  Continuous Improvement of Forecasting (Forecaster)  Enhanced Network Balancing  Physical  Safe Operation of the NTS  Efficient Use of the NTS  Delivery of Assured Pressures  Constraint management  Environmental Impact due to Compressor Usage  Reduced Emissions  Less Venting  Better energy procurement  Lower Cost to the community  Commercial  Efficient System Balancing Actions  Lower Cost to the Community  Better informs the Shippers balance position

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Preview of session 2 (November 2nd 2010)

NTS Exit Reform/Risk Management Processes