W. Decking, M. Dohlus, C. Gerth, A. Krasnov, S. Lederer, T. Limberg, N. Mildner, D. Noelle FEL Beam Dynamics Meeting, 27.06.2011 XFEL Bunch Compressor.

Slides:



Advertisements
Similar presentations
A special large aperture BPM at FLASH Nicoleta Baboi for Kirsten Hacker BPM Workshop, Lüneburg, Nov. 30, 2006.
Advertisements

FEL Beam Dynami cs FEL Beam Dynamics T. Limberg Short Bunches at FLASH.
BC System – Review Options ● BC2 working point (energy-charge-compr.) ● 2BC (rf-rf-bc-rf-bc-rf) ● table: 2BC (rf-rf-bc-rf-bc-rf) dogleg + 2BC (rf-dog-rf-rf-bc-rf-bc-rf)
ILC Accelerator School Kyungpook National University
Christopher Gerth, Michael Röhrs, Holger Schlarb DESY Hamburg Optics for Diagnostic Section BC1 in the European XFEL.
11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
Bunch Compressor 3 Torsten Limberg for Frank Stulle et al.
1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
Bunch compressors ILC Accelerator School May Eun-San Kim Kyungpook National University.
1 ILC Bunch compressor Damping ring ILC Summer School August Eun-San Kim KNU.
Bunch compressor design for eRHIC Yichao Jing and Vladimir Litvinenko FLS2012, Newport News, VA 3/8/2012.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
P. Emma, SLACLCLS Commissioning – Sep. 22, 2004 Linac Commissioning P. Emma LCLS Commissioning Workshop, SLAC Sep , 2004 LCLS.
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Linac Physics, Diagnostics, and Commissioning Strategy P. Emma LCLS FAC Meeting April 29, 2004 LCLS.
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
FEL Beam Dynami cs FEL Beam Dynamics T. Limberg FEL driver linac operation with very short electron bunches.
Review of the European XFEL Bunch Compression System Summary Torsten Limberg.
SPPS, Beam stability and pulse-to-pulse jitter Patrick Krejcik For the SPPS collaboration Zeuthen Workshop on Start-to-End Simulations of X-ray FEL’s August.
XFEL BC Review Meeting, 18/12/2006, Christopher Gerth Christopher Gerth, Michael Röhrs, Holger Schlarb DESY Hamburg Optics Layout of the Diagnostic Sections.
Update of 3.2 km ILC DR design (DMC3) Dou Wang, Jie Gao, Gang Xu, Yiwei Wang (IHEP) IWLC2010 Monday 18 October - Friday 22 October 2010 Geneva, Switzerland.
Max Cornacchia, Paul Emma Stanford Linear Accelerator Center Max Cornacchia, Paul Emma Stanford Linear Accelerator Center  Proposed by M. Cornacchia (Nov.
Low Energy RHIC e - Cooling Meeting Minutes – 11/19/14 1. Cooling Section Magnets and Power Supplies –Most of power supplies will be from ERL (R. Lambiase).
Beam Dynamics and FEL Simulations for FLASH Igor Zagorodnov and Martin Dohlus Beam Dynamics Meeting, DESY.
Optics considerations for ERL test facilities Bruno Muratori ASTeC Daresbury Laboratory (M. Bowler, C. Gerth, F. Hannon, H. Owen, B. Shepherd, S. Smith,
1 Alternative ILC Bunch Compressor 7 th Nov KNU (Kyungpook National Univ.) Eun-San Kim.
1 Alternative Bunch Compressor 30 th Sep KNU Eun-San Kim.
XFEL Beam Dynamics Meeting Bolko Beutner, DESY Velocity Bunching Studies at FLASH Bolko Beutner, DESY XFEL Beam Dynamics Meeting
T. Limberg Position of the 3rd Harmonic System. Injector (with first Bunch Compression Stage) 2 European XFEL MAC May 2010 T. Limberg.
Canadian Light Source Commissioning Progress CLS Annual Users Meeting –
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Vacuum, Surfaces & Coatings Group Technology Department 22 nd January 2015 C. Garion2 Beam Line Interconnection: snapshot of present design principles.
S2E (start-to-end) Simulations at DESY T. Limberg TESLA Collaboration Meeting in Frascati, May 2003.
Transverse Gradient Undulator and its applications to Plasma-Accelerator Based FELs Zhirong Huang (SLAC) Introduction TGU concept, theory, technology Soft.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
Issues Concerning Different Beam Lines Integration C. Bracco, E. Gschwendtner, B. Goddard, M. Meddahi, A. Petrenko, F. Velotti Acknowledgements: WP3 and.
What did we learn from TTF1 FEL? P. Castro (DESY).
XFEL Beam Dynamics Meeting Bolko Beutner, DESY First results of micro-bunching and COTR experiments at FLASH Bolko Beutner, Winfried Decking,
HF2014 Workshop, Beijing, China 9-12 October 2014 Challenges and Status of the FCC-ee lattice design Bastian Haerer Challenges.
Wir schaffen Wissen – heute für morgen PSI, March 2013 Paul Scherrer Institut PSI / DESY / KIT Mini-Workshop on Longitudinal Diagnostics for FELs.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Applications of transverse deflecting cavities in x-ray free-electron lasers Yuantao Ding SLAC National Accelerator Laboratory7/18/2012.
Frank Stulle, ILC LET Beam Dynamics Meeting CLIC Main Beam RTML - Overview - Comparison to ILC RTML - Status / Outlook.
Minjie Yan Ch. Gerth, E. Hass Deutsches Elektronen-Synchrotron (DESY)
Large Booster and Collider Ring
Paul Scherrer Institut
AD & I : BDS Lattice Design Changes
Longitudinal Diagnostics for start-up
UCLA/ATF chicane compression experiments
Progress activities in short bunch compressors
LCLS Linac Update Brief Overview L1 & BC1 Progress LTU & E-Dump Status Continuing Resolution Impact.
Injector Beam Line Optics
Time-Resolved Images of Coherent Synchrotron Radiation Effects
XFEL Bunch Compressor BC1 and BC2 Vacuum Issues
Diagnostics overview and FB for the XFEL bunch compressors
UCLA/ATF chicane compression experiments
FEL-Beam-Dynamics Group
Linac/BC1 Commissioning P
LCLS Tracking Studies CSR micro-bunching in compressors
High Level Physics Applications for LCLS Commissioning
Linac Physics, Diagnostics, and Commissioning Strategy P
LCLS FEL Parameters Heinz-Dieter Nuhn, SLAC / SSRL April 23, 2002
First results of micro-bunching and COTR experiments at FLASH
LCLS Injector Commissioning P
Coupler Effects in High Energy Part of XFEL Linac
Review of the European XFEL Bunch Compression System: Introduction and Concept Torsten Limberg.
Proposal for quadrupole families
Bunch Compressor Beam Line Optics
Feasibility of Recuperation of Magnets in Decommissioned Storage Rings
Fanglei Lin MEIC R&D Meeting, JLab, July 16, 2015
3.2 km FODO lattice for 10 Hz operation (DMC4)
Presentation transcript:

W. Decking, M. Dohlus, C. Gerth, A. Krasnov, S. Lederer, T. Limberg, N. Mildner, D. Noelle FEL Beam Dynamics Meeting, XFEL Bunch Compressor Chicane Layout

Introduction Bunch Compressor Chicane Specifications: EDMS D* FEL Beam Dynamics Meeting, W. Decking et al Basic Requirements: Magnetic Field Limits: BC0: 160 MeV BC1: 700 MeV BC2: 2.5 GeV (dump magnet)

XFEL Bunch Compressor Chicane Layout Chicane Layout 3 FEL Beam Dynamics Meeting, W. Decking et al Beam offsets Beam Size 15 deg RF scan

XFEL Bunch Compressor Chicane Layout BC1 Layout 4 FEL Beam Dynamics Meeting, W. Decking et al

XFEL Bunch Compressor Chicane Layout Intersection Layout Energy BPM: Measure relative and absolute beam energy OTR-Screen: Measure dispersive beam profile Spoiler: Intercept off-energy tails SR port: Online measurement of dispersive beam profile BAM before and after chicane: Measure relative and absolute beam energy 5 FEL Beam Dynamics Meeting, W. Decking et al

XFEL Bunch Compressor Chicane Layout OTR Screen Concept: D. Noelle et. al. 6 FEL Beam Dynamics Meeting, W. Decking et al Avoid long motion and thus extensive bellow units:  Move in OTR from the wide side of chamber  Visibility range given by maximum size of window flange

XFEL Bunch Compressor Chicane Layout Other parts Spoiler:  No concept yet  Might be combined with OTR chamber  Long bellows are back because spoiler has to cover complete transverse space (400 mm) E BPM:  Design missing  Mechanics will get challenging 7 FEL Beam Dynamics Meeting, W. Decking et al

XFEL Bunch Compressor Chicane Layout Open questions What else ? Are 1150 mm space between dipoles sufficient?  If not, chicane length cannot be changed anymore  Angle has to be increased instead Is the offset and R56 range correct ? Chicane geometry changes are possible till September FEL Beam Dynamics Meeting, W. Decking et al