Summary of Working Group II – Chamber Coating and Treatment Participants: Michel ChanelCERN Ping HeBNL Dick Hseuh BNL Roberto KersevanESRF Yulin LiCornell.

Slides:



Advertisements
Similar presentations
Thin Film Coatings for SPS-U
Advertisements

Thermo-compression Bonding
Upgrade Plan of KEKB Vacuum system Pre-kickoff KEK1 Y. Suetsugu KEKB Vacuum Group Contents Challenges for vacuum system Designs for.
2006/09/25-28 ILCDR06, Cornell University 1 Experimental Study on Suppression of Electron Cloud Effect at the KEKB Positron Ring Contents Introduction.
8 th January, 2007 European Linear Collider Workshop, DL, UK ILC DR Vacuum System Progress in ECLOUD Task (Goal 7) for the ILC DR Dr. Oleg B. Malyshev.
NLC - The Next Linear Collider Project Leif Eriksson 10/11/99 NLC BD VACUUM Thermal Outgassing Rate for Various Beam Line Materials.
How e-cloud effect affects the ILC DR Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
1 NEG films: recent R&D progress Paolo Chiggiato (for the EST-SM-DA section) Vacuum Issues of the LHCb Vertex Detector 28 November NEG films: choice.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Vacuum Technology Need for Vacuum Environment
Holger Kollmus - VBE-UHV 1 SIS100_1 ERDA Measurements ERDA – Measurements: Understanding of Ion Beam-Loss Induced Desorption.
Dean R Walters Chamber and Bellows Jan. 5, Summary Chamber The plan is to construct a chamber made of 316LN stainless steel with.
SPSU Progress on coatings and grooves M.Taborelli -Progress on C based coatings -Progress on rough coatings -Progress on SEY instrument -Grooves.
BISMV & H 0 -H - PSB INJECTION VACUUM REQUIREMENTS LIU - PSB meeting 29th October 2012 C. Pasquino, P. Chiggiato, J. Hansen.
CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Gerhard Schneider1 14 October 2011 Status of the Composite Vacuum Chambers M. Gallilee, C. Garion, M. Malabaila,
Vacuum, Surfaces & Coatings Group Technology Department Vacuum tests for CLIC module prototypes 6 November 2013 C. Garion2 Outline: Reminder: specification.
E-CLOUD VACUUM OBSERVATIONS AND FORECAST IN THE LHC Vacuum Surfaces Coatings Group 03/07/2011 G. Bregliozzi On behalf of VSC Group with the contributions.
1 Electron Cloud in LHC V. Baglin CERN AT-VAC, Geneva 1. Mecanism and Recipies 2. LHC Vacuum Chambers 3. Diagnostics 4. Conclusions Vincent Baglin Electron.
Solar Cell conductive grid and back contact
BIAS MAGNETRON SPUTTERING FOR NIOBIUM THIN FILMS
John Amann – ILC Mechanical Engineering 11/13/06
26-28 August 2008 Final EUROTeV Scientific Workshop, Uppsala University, Sweden 1 ILC DR vacuum system related problems and solutions Oleg B. Malyshev.
20-21 January 2009, RAL Joint DL-RAL Accelerator Workshop 1 INVESTIGATION OF NON- EVAPORABLE GETTER FILMS O. B. Malyshev, K.J. Middleman, A. Hannah and.
Vacuum Fundamentals 1 atmosphere = 760 mm Hg = kPa 1 torr = 1 mm Hg vacuum range pressure range low 760 ~ 25 torr medium 25~ high ~ 10.
BDS 11 Vacuum System for BDS [Completeness of RDR] Y. Suetsugu J. Noonan and P. Michelato Design principle Basic design Cost estimation.
Vacuum Fundamentals 1 atmosphere = 760 mm Hg = kPa 1 torr = 1 mm Hg vacuum range pressure range low 760 ~ 25 torr medium 25~ high ~ 10.
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
Training in Vacuum Technology for JUAS 2013 Students
CAVITY TREATMENT (BCP, HEAT TREATMENT & HPR) Sergio Calatroni with many contributions from: Rama Calaga, Leonel Ferreira, Antonio Mongelluzzo LHC CCEM,
2009/1/16-18 ILD09 Seoul 1 Notes for ILD Beam Pipe (Technical Aspect) Y. Suetsugu, KEK Parasitic loss Vacuum pressure profile Some comments for beam pipe.
Peter Spiller, COLMAT-Kick off meeting, Cryo-Collimator, CERN, COLMAT Kick-off meeting CERN Peter Spiller Cryo-Collimator (Catcher) for.
Machine Tools And Devices For Special Technologies Ion beam machining Slovak University of Technology Faculty of Material Science and Technology in Trnava.
F. Le Pimpec 1 How DID they make light bulb work ? Bulb Installed in 1901 at the Livermore’s (CA) Fire station. C filament - 4 W ♦ Since 1800 the electric.
Plans for in-situ coating with a robotic mole at BNL Ady Hershcovitch 1, Michael Blaskiewicz 1, Wolfram Fischer 1, H. Joseph Poole 2, Mark Erickson 2,
Coatings and coating systems Two main strategies to coat the vacuum chambers for the magnets of the SPS: 1.The chamber is OUTSIDE the magnet 2.The chamber.
LHC Scrubbing Runs J.M. Jimenez On behalf of the Electron Cloud Study Team, a Collaboration between AT and AB Departments.
1 Vacuum chambers for LHC LSS TS Workshop 2004 Pedro Costa Pinto TS department, MME group Surface Characterization & Coatings Section.
September 17-21, 2007Workshop on ILC Interaction Region Engineering Design, SLAC IR Vacuum Systems first thoughts Oleg Malyshev ASTeC, STFC Daresbury Laboratory.
Vacuum Devices for accelerator studies Bernard HENRIST CERN TE dept. – Technology Department VSC group – Vacuum Surfaces and Coatings OLAV III Oak Ridge.
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill.
Requirements and options for PS2 vacuum system E. Mahner * thanks to W. Bartmann, M. Benedikt, S. Calatroni, P. Chiggiato, P. Cruikshank J.M. Jimenez,
2007/09/17-21 SLAC IRENG07 1 A Basic Design of IR Vacuum system Y. Suetsugu, KEK Possibility of a pumping system without in-situ baking at z < L*
ILC GDE - ILCDR08 Cornell 8-11 July 2008 Electron Cloud Mitigation R&D at SLAC M. Pivi, D. Arnett, G. Collet, T. Markiewicz, D. Kharakh, R. Kirby, J. Seeman,
THIN FILMS FOR CLIC ELEMENTS Outline Motivation The role of MME-CCS DB and MB transfer lines Main beam Main beam quadrupoles Other issues conclusions CLIC.
E-cloud Remedies and PS2 vacuum design J.M. Jimenez AT Department – Vacuum Group CARE-HHH-APD BEAM’07 Thursday 04 October Session 2: PS2 E-cloud.
Sergio Calatroni TS/MME 1 Reactive sputtering Some references on TiN sputtering models –Berg et al. J. Appl. Phys. 63 (1988) 887 –Larsson Vacuum 39 (1989)
M.Taborelli Outgassing of a-C Aging Differences in SEY and aging Preparation for magnet coating Progress on a-C coatings Ch. Yin-Vallgren, S.Calatroni,
Recent ECLOUD07 Workshop in Daegu, S. Korea (~50 participants) –Highlights: Measurements of the surface Secondary Electron Yield (SEY) of samples inserted.
Key technologies of vacuum chamber for future Accelerators --NSRL Vacuum Group
Facility to coat the SPS magnets with carbon Objective: coat at least 90% of the SPS with a carbon thin film with low secondary electron emission in order.
Progress and Plans for Main Injector beam Pipe Coatings Dave Capista Linda Valerio Project X Collabration Meeting WG3 MI/Recycler September 8, 2010.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
2008/12/10 INFN R&D on Low Impedance Beam Chamber and Components Y. Suetsugu, for KEKB Vacuum Group Contents Introduction Beam Chamber Components Connection.
Title Page Design 3 Vacuum considerations for JLEIC beamline and Interaction Region Marcy L. Stutzman.
Mg Films Grown by Pulsed Laser Deposition as Photocathodes: QE and surface adsorbates L. Cultrera INFN – National Laboratories of Frascati.
THIN FILM GETTER COATING FOR THE SIS 18 UPGRADE M.C.Bellachioma GSI- Vacuum Group Beschleunigerpalaver 14 September 2006.
1 Vacuum in LER and HER. First estimation for the pumping system requirements (part II) A.Variola for B.Mercier, C.Prevost Annecy - Mars 2010.
2007/09/17 SLAC IRENG07 1 Comment on IR Vacuum system Y. Suetsugu Pumping System without in-situ baking at z < L*
Click to edit Master text styles Second level Third level Fourth level Fifth level 1 CERN European Organization for Nuclear Research Graphic charter Fabienne.
INVESTIGATION OF NON-EVAPORABLE GETTER FILMS
Vacuum Problems in the ILC Damping Ring
Cornell ERL Prototype Injector DC Photocathode Gun Design Review Vacuum Systems Yulin Li, January 5th– 6th, /5-6/2011 Cornell Gun Review.
G.Bregliozzi - VSC-LBV Section Collimation working group 08/07/02013
Maximum count per cycle
CEPC Vacuum System Dong Haiyi 2017/11/5.
Manufacturing of the IFMIF series power couplers
Thermal Outgassing Rate for Various Beam Line Materials
RF Absorption Measurements from Beam Pipe Coatings
Hydrogen and Ultra-High Vacuum
Presentation transcript:

Summary of Working Group II – Chamber Coating and Treatment Participants: Michel ChanelCERN Ping HeBNL Dick Hseuh BNL Roberto KersevanESRF Yulin LiCornell Mike SeidelDESY Peter SeidlLBNL Ysuke SuetsuguKEK Robert ToddBNL Daniel WeissBNL …. Chamber Coating TiN NEG Others Chamber Treatment Baking, Vacuum Firing Cleaning Summary of Working Group II Chamber Coating and Treatment

Summary of Working Group II – Chamber Coating and Treatment Chamber Coating – TiN Goal: To reduce SEY Impurity and coating pressure is critical to SEY BNL/SNS 5 mTorr  SEY due to rougher surface BNL/SNS 1.5 mTorr  SEY > 1.9 due to smooth surface SEY of St St ~ 2.2 Similar is observed for other surfaces, Cu and NEG Measure SEY for each coating parameters CERN, KEK, SLAC PSR experience with TiN coated chamber? Beam scrubbing of mC/mm 2 ! Hilleret, CERN

Summary of Working Group II – Chamber Coating and Treatment Chamber Coating – NEG (CERN + ESRF + Cornell) To reduce SEY, ESD and provide distributed pumping Low SEY of after activation SEY of < 1.7 ( < 1.4 in SPS lab test ) after saturation and after H2O saturation. As received: < 2.0 Other SEY data: ~ 1.1 after activation, 1.4 after saturation, 1.9 after overnight? Coating parameters: 100C, 2e-2 Torr Kr gas or 300C coating  rougher surface but more capacity between activation NEG Surface is rougher on Al and smoother on SS No bonding problem even on Al surface with 1  m Al 2 O 3 Need consistent measurement of SEY from different lab on Rough vs. smooth NEG surface 300C vs. 100C coatings Coatings on SS, Al, Cu, Be…

Summary of Working Group II – Chamber Coating and Treatment Chamber Coating – NEG (contiune) Optimum coating thickness: 1 – 1.5  m (adhesion?) Flaking of coating if surface is contaminated. No impurity during coating No pumping with a few percent of O loading (Cornell, ESRF) Enough capacity for over 10 air vent/activation cycles (depending on T) Activation temperature of NEG 100C – observed some activation (Cornell) 180C – ESRF 250C – RHIC ≤ 300C – LHC LSS; LEIR Use ion pumps to remove H 2 during re-activation (ESRF) Impedance is better than Stainless Steel but worse than Aluminum 50  Ώ-cm is OK for ESRF but not for KEKB

Summary of Working Group II – Chamber Coating and Treatment Palladium (Pd) over layer on NEG to prevent H2O and oxide diffusion into NEG during activation, therefore preserve the NEG capacity for H2. Pd pumping of H2/COreversible by 100C. Easy to sputter, expensive cathode Other types of coating - Diamond-like graphite coating Low SEY but may be difficult to implement for long chambers Plans at various labs Cornell – need high H2 capacity down to e-13 Torr (Pd over layer?) ESRF – will test Pd over layer coating in the near future KEKB – may test NEG on a straight section for SEY (difficulty to activate) Compatible with Cu SEY? not advantage from photon scrubbing due to narrow band PEPII – TiN coating of straight section chambers LHC LSS – C with 0.5mm SS foil heaters LEIR – NEG coating of SS + Quads, GSI – NEG coating of SIS dipole chambers; low desorption material Chamber Coating - Others

Summary of Working Group II – Chamber Coating and Treatment Chamber Treatment Vacuum Firing to reduce H 2 but not helping ESD… (Uppsala) Universal outgassing data base for insulators… will be beneficial for the community (Uppsala +…) No electro-polishing after vacuum firing – re-loading of H 2 GDC by Ar + O 2 or He + O 2 is not suitable for heavy ion machine, due to the release Ar and He during beam scraping. Cleaning: DI water high pressure wash, then EtOH wipe, no acid etching (Cornell) DI water rinse till the water passes the conductance test or optical particle counting (Tesla) High pressure detergent + water rinse, EtOH wipe (RHIC) Cu chambers – chemical polishing (KEKB) Test every chamber vs. Test a few chambers vs. Test all special chambers Thin foil heaters + insulation (~mm) for bakeout and NEG activation of LHC LSS and Expt Pipes